Article
Publication date: 10 July 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David John Edwards and Eric Asamoah

The purpose of this paper was to first identify and then model the impact of critical success factors (CSFs) of public–private partnership (PPP) power projects.

Abstract

Purpose

The purpose of this paper was to first identify and then model the impact of critical success factors (CSFs) of public–private partnership (PPP) power projects.

Design/methodology/approach

Review of empirical literature came out with 20 CSFs which were ranked by experts and industry practitioners through a two-round Delphi questionnaire survey.

Findings

These CSFs were grouped into CSF groups (CSFGs) using component analysis, and they served as the input variables for fuzzy analysis. The six components were collaboration and transparency, guarantee and permits, socio-political support, expected profitability, technical feasibility and risk allocation (RA). Overall success index of PPP power projects in Ghana was 5.966 and showed there is high impact of CSFGs on project success. Fuzzy analysis also confirmed RA as the most significant CSFG.

Originality/value

The model developed can serve as a multi-dimension CSF framework that can be used as a success attainment tool for PPP power projects. For policy developers and stakeholders, the model serves as a pointer to issues which the government/public sector must focus on to attract huge investments from the private sector in the power sector.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 12 May 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David John Edwards, Eric Asamoah, Andrew Anafo, Dominic Kuutiero and Richmond Makafui Kofi Kukah

In comparison to other countries, power generation in Sub-Sahara Africa is poor. Public–private partnership (PPP) model has become increasingly popular for addressing…

Abstract

Purpose

In comparison to other countries, power generation in Sub-Sahara Africa is poor. Public–private partnership (PPP) model has become increasingly popular for addressing infrastructural challenges, especially in the power sector. The purpose of this study is to evaluate and classify the factors that influence public sector involvement in Ghanaian PPP power projects.

Design/methodology/approach

Using purposive and snowball sampling techniques, questionnaires were used to gather responses from experts in the PPP power sector in a two round Delphi survey. Analytical tools adopted were descriptive statistics, mean score ranking, Cronbach’s alpha and factor analysis.

Findings

The most significant factors that influence public sector involvement in PPP power projects were: achieving improved value for money; access to additional capital; increased certainty of projects; greater efficiency of project delivery services; and improved ability to deliver new infrastructure. From factor analysis, the four components were: value for money and efficiency; capital and skills; innovation and technology; and project delivery.

Originality/value

Government bodies in the power sector will benefit from the findings, as it would aid them develop policies that would strengthen regulatory structures as well as institutions.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 29 January 2024

Samuel Gyimah, De-Graft Owusu-Manu, David J. Edwards, Joseph Ignatius Teye Buertey and Anthony Kwame Danso

In recent times, both academics and industrialists have undertaken research into various areas of circular business models (CBM) in a bid to promote a green economy. Yet despite…

Abstract

Purpose

In recent times, both academics and industrialists have undertaken research into various areas of circular business models (CBM) in a bid to promote a green economy. Yet despite numerous studies conducted, the ensuing discourse contains scant information regarding the contributions of CBM towards the transition of green economy in the construction industry. This present study therefore aims to explore the contributions of CBM in the transition towards a green economy in the Ghanaian construction industry.

Design/methodology/approach

A comprehensive literature review was first conducted to identify the contributions of CBM towards the transition towards a green economy. A quantitative research strategy was then adopted to collect primary questionnaire data from professionals with knowledge of CBM and the green economy from 104 participants for the study. The data gathered was analyzed using descriptive statistics and exploratory factor analysis viz. Principal component analysis.

Findings

The contributions of CBM towards the transition towards a green economy were found to be: value contributions (i.e. lower carbon footprint, lower emission of waste by the industry, value creation for clients, innovation in construction materials and methods, reduced maintenance cost, creation of energy efficient infrastructures, improved value proposition for firms, improved sustainability of the industry and reduced pressure on finite resource.); green contributions (i.e. recycling and reuse of construction waste, promotion of green building technology, increased potential for economic growth, increased resource efficiency and creation of green building market) and longevity contribution (i.e. increased life span of buildings). It was evident that CBM make significant contributions in the transition towards green economy and as such, policymakers and other stakeholders within the construction industry must adopt these models to maximize their green credentials and accrue inherent benefits associated with transitioning towards a green economy.

Originality/value

This paper presents a novel and comprehensive study that explores the contributions of CBM towards engendering a green economy. The study’s results provide construction industry stakeholders and policymakers with clear insight into the contributions of CBM towards the transition into a green economy. In practice, this study provides much needed guidance to support construction practitioners to transition towards a green economy in alignment with the United Nations' Sustainable Development Goals (SDGs).

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 December 2022

De-Graft Owusu-Manu, Emmanuel Ofori-Yeboah, Edward Badu, Augustine Senanu Komla Kukah and David John Edwards

This study aims to investigate the effects of moral hazard on quality and satisfaction of public–private–partnership (PPP) construction projects in Ghana.

Abstract

Purpose

This study aims to investigate the effects of moral hazard on quality and satisfaction of public–private–partnership (PPP) construction projects in Ghana.

Design/methodology/approach

After undertaking a literature review, questionnaires were used to elicit responses from respondents. Population consisted of quantity surveyors, project managers, procurement officers, consultants, public agency officers involved in PPP projects, private partners and contractors. A total of 211 questionnaires were received from 250 distributed. Purposive and snowballing sampling techniques were adopted. Analytical tools were Cronbach’s alpha for testing reliability, regression, mean score ranking and relative importance index.

Findings

Reduced mutual trust and respect, poor clarity of project objectives; consequence on decision-making; less effective construction process; and increased construction risks were the significant effects of moral hazard on satisfaction of PPP construction projects. Value-based effects; manufacturer-based effects; product-based effects; user-based effects; and transcendent-based effects were the significant effects of moral hazard on quality of PPP construction projects.

Practical implications

Construction stakeholders involved in delivering PPP projects ought to take note of the findings and recommendations arising. Further studies should explore the effects on other project performance indicators apart from satisfaction and quality.

Originality/value

This paper extends knowledge in the area of exploring the effects of moral hazard on PPP project satisfaction and quality. The findings are beneficial to both academia and industry practitioners.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 2 January 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

This study aims to identify the critical success factors of public private partnership (PPP) power projects in Ghana and further evaluates the most significant critical success…

Abstract

Purpose

This study aims to identify the critical success factors of public private partnership (PPP) power projects in Ghana and further evaluates the most significant critical success factors (CSFs) influencing both the public and private sector participation in PPP power projects.

Design/methodology/approach

Ranking-type Delphi survey in two rounds was conducted to establish a comprehensive list of critical success factors of PPP power projects. Using purposive and snowball sampling techniques, experts were targeted for the Delphi survey. Mean score ranking, Cronbach’s alpha coefficient and Kendall’s concordance were used for analysis.

Findings

From the list of 37 critical success factors, 9 CSFs were deemed to be extremely significant. The five topmost CSFs were as follows: shared authority, trust and communication between public and private sectors; necessity of power project; debt guarantee to enable private partner to raise funds from the local or international financial markets; appropriate risk allocation and risk sharing; and thorough and realistic assessment of cost, projections and benefits.

Originality/value

The CSFs identified and prioritized in this study have the propensity to trigger policy development towards the PPP power sector in Ghana and developing countries that shares similar context. This is because the study has wide implications for financing, politics, procurement, regulations, legal and capacity building.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 30 March 2023

Ashish Rastogi and Harish Kumar Singla

The purpose of this study is to examine the effect of job, organizational and personal factors on exhaustion (EXH) in early career construction professionals in India.

Abstract

Purpose

The purpose of this study is to examine the effect of job, organizational and personal factors on exhaustion (EXH) in early career construction professionals in India.

Design/methodology/approach

A survey questionnaire was developed and circulated among early career construction professionals in India. The responses on job, organizational and personal demands (role ambiguity, stakeholder management and work-family conflict respectively) and job, organizational and personal resources (job autonomy (JA), perceived organizational support and emotional intelligence respectively) were sought using standard measures. The valid data (N = 187) thus collected, was analysed using structural equation modelling (SEM).

Findings

The study finds that in terms of demands, stakeholder management and work family conflict have a significant positive effect on EXH. In other words, EXH level increases with the increase in these two. With respect to resources, JA has a negative effect on EXH. This implies that as JA increases, the EXH level goes down.

Originality/value

This study is the first to examine factors causing EXH in early career construction professionals in India. This study is significant on two counts. First, it proposes a comprehensive theoretical model based in job demands-resources (JD-R) theory customized for construction sector. Second, the empirical examination is situated in the Indian context, which remains underexplored despite its economic and demographic significance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 April 2023

Rebeca Lambers, Fiona Lamari, Martin Skitmore and Darmicka Rajendra

Construction defects are one of the primary causes of deficient quality performance and constantly yield project cost and schedule overruns mostly because of rework. This study…

Abstract

Purpose

Construction defects are one of the primary causes of deficient quality performance and constantly yield project cost and schedule overruns mostly because of rework. This study aims to propose a new method for identifying a bespoke checklist of the most recurrent defects in residential construction work and their correlated causes as a basis for developing a framework for practical improvements in managing defect risks.

Design/methodology/approach

A literature review was first used to ground the defects within the existing theory and develop a new framework for ranking the key defects involved. This was demonstrated and tested by an analysis of Queensland Building Construction Commission (QBCC) archival data for 42,000 reported defects in new Queensland residential buildings. A questionnaire survey of 427 construction practitioners from 37 trades was then conducted to determine their causes.

Findings

The developed framework consists of preconditions for defective acts, defective supervision and organizational influences and is found to be suitable for analyzing the QBCC archives to rank the 20 most frequent defects. In the demonstration study, a questionnaire survey identified the highest frequency latent causes of defective acts to be workers taking shortcuts to complete tasks, workers’ lack of skill or knowledge level, challenges and limitations of technical constructability, and incorrect material supply; the failure to correct a known problem and poor supervision for defective supervision; and inadequate employee training, low managerial priority for quality and high time pressure and constraints for organizational influences.

Originality/value

The method is a new approach to identifying the key defects in residential construction work and their correlated causes for developing bespoke checklists as an aid to in managing defect risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 March 2023

Carol K.H. Hon, Chenjunyan Sun, Kïrsten A. Way, Nerina L. Jimmieson, Bo Xia and Herbert C. Biggs

Mental health problems are a grave concern in construction. Although the distinction between high job demands and low job resources, as reflected in the Job Demands-Resources…

Abstract

Purpose

Mental health problems are a grave concern in construction. Although the distinction between high job demands and low job resources, as reflected in the Job Demands-Resources (JD–R) model, has been used to examine the extent to which psychosocial hazards influence mental health for construction practitioners, limited research has reflected on the nature of these psychosocial hazards by exploring experiences of site-based construction practitioners.

Design/methodology/approach

This study adopted a phenomenological approach to examine people’ experiences and thoughts of the complex phenomena of psychosocial hazards and mental health in construction. In total, 33 semi-structured interviews were undertaken with site-based construction practitioners in Australia to unveil construction-focused psychosocial hazards and their effects on mental health. The data were analysed via content analysis, employing an interpretation-focused coding strategy to code text and an individual-based sorting strategy to cluster codes.

Findings

Eighteen psychosocial hazards were identified based on the JD–R model. Six of these represented a new contribution, describing salient characteristics inherent to the construction context (i.e. safety concerns, exposure to traumatic events, job insecurity, task interdependency, client demand and contract pressure). Of particular importance, a number of interrelationships among psychosocial hazards emerged.

Originality/value

The significance of this qualitative research lies in elucidating psychosocial hazards and their complex interrelatedness in the context of the mental health of construction practitioners, enriching the understanding of this central health and safety issue in the high-risk setting of construction work. The findings contribute to addressing mental health issues in the Australian construction industry by identifying higher order control measures, thereby creating a mentally healthy workplace.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 December 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and Eric Asamoah

The demand for power has surged in recent times and continues to increase yearly. In comparison to developed countries, the power industry’s risks, especially in piblic–private…

Abstract

Purpose

The demand for power has surged in recent times and continues to increase yearly. In comparison to developed countries, the power industry’s risks, especially in piblic–private partnership (PPP) projects, are more complex and essential in developing countries. Appreciating the inter relationship among these risk factors is crucial. However, there exist no studies developing quantitative models to explain how various PPP power risk factors influence each other, especially in developing countries like Ghana. This study aims to investigate and model the relationship, the probability of occurrence and severity of impact of PPP power risk factors in Ghana.

Design/methodology/approach

Data were collected through ranking type questionnaire in a two-round Delphi survey with 48 respondents using purposive and snowball sampling techniques. partial least squares structural equation modelling (PLS-SEM) was used for analysis of data.

Findings

A model was developed to investigate the influence the risk factors inherent in PPP power projects have on each other. Validity of the model was tested based on the data collected. PLS-SEM results indicated the various relationships and interdependencies the risk factors had on each other considering their probability and severity. Both significant and insignificant levels of relationships were found among the various risk factors.

Practical implications

The SEM that was developed to assess the relationships among the risk factors has great value for policy makers in the energy sector, industry practitioners, researchers and industry practitioners. Strategies can be mapped out to mitigate and effectively allocate the risks with the high interdependencies.

Originality/value

Regarding the quantitative impact of the interrelationship among risk factors in PPP power projects, the findings of this research are arguably the first to be presented for the construction sector and contribute to knowledge on PPP practice and further has implications toward achieving power sector risk mitigation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 January 2024

Benjamin Boahene Akomah and Prasanna Venkatesan Ramani

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis…

Abstract

Purpose

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis (CFA) model.

Design/methodology/approach

The study adopted a deductive research approach and started by identifying the positive factors that influence construction project performance. This was followed by the modification of the identified factors. After that, a questionnaire was developed out of the factors for data collection. Exploratory factor analysis was used to establish the factor structure of the positive factors, and this was verified using CFA afterwards. A model fit analysis was performed to determine the goodness of fit of the hypothesised model, followed by the development of the confirmatory model.

Findings

The study demonstrated substantial correlation in the data, sufficient unidimensionality and internal reliability. In addition, the estimated fit indices suggested that the postulated model adequately described the sample data.

Practical implications

The paper revealed that performance can be enhanced if stakeholders identify and leverage the positive factors influencing performance. The paper suggests that project stakeholders, particularly government, project owners, consultants and construction firms, can improve project performance by critically examining economic and financial systems (EFS), regulation and policy-making systems (RPS), effective management practices (EMP) and project implementation strategies (PIS).

Originality/value

The contribution of this paper to the present literature is identifying the positive factors and developing the confirmatory factor model. The model comprised 42 positive variables under four indicators: EMP, RPS, PIS and EFS.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 813