Search results

1 – 10 of over 3000
Open Access
Article
Publication date: 6 December 2019

Irit Talmor

This paper aims to examine the time it would take to provide medical prophylaxis for a large urban population in the wake of an airborne anthrax attack and the effect that various…

1017

Abstract

Purpose

This paper aims to examine the time it would take to provide medical prophylaxis for a large urban population in the wake of an airborne anthrax attack and the effect that various parameters have on the total logistical time.

Design/methodology/approach

A mathematical model that evaluates key parameters and suggests alternatives for improvement is formulated. The objective of the model is to minimize the total logistical time required for prophylaxis by balancing three cycles as follows: the loading cycle, the shipping cycle and the service cycle.

Findings

Applying the model to two representative cases reveals the effect of various parameters on the process. For example, the number of distribution centers and the number of servers in each center are key parameters, whereas the number of central depots and the local shipping method is less important.

Research limitations/implications

Various psychological factors such as mass panic are not included in the model.

Originality/value

There are few papers analyzing the logistical response to an anthrax attack, and most focus mainly on the strategic level. The study deals with the tactical logistical level. The authors focus on the distribution process of prophylaxis and other medical supplies during the crisis, analyze it and identify the parameters that influence the time between the detection of the attack and the provision of effective medical treatment to the exposed population.

Details

Journal of Defense Analytics and Logistics, vol. 3 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Open Access
Article
Publication date: 4 September 2020

Mingjie Hao, Yiming Bie, Le Zhang and Chengyuan Mao

The purpose of this paper is to develop a dynamic control method to improve bus schedule adherence under connected bus system.

Abstract

Purpose

The purpose of this paper is to develop a dynamic control method to improve bus schedule adherence under connected bus system.

Design/methodology/approach

The authors developed a dynamic programming model that optimally schedules the bus operating speed at road sections and multiple signal timing plans at intersections to improve bus schedule adherence. First, the bus route was partitioned into three types of sections: stop, road and intersection. Then, transit agencies can control buses in real time based on all collected information; i.e. control bus operating speed on road sections and adjust the signal timing plans through signal controllers to improve the schedule adherence in connected bus environment. Finally, bus punctuality at the downstream stop and the saturation degree deviations of intersections were selected as the evaluation criteria in optimizing signal control plans and bus speeds jointly.

Findings

An illustrative case study by using a bus rapid transit line in Jinan city was performed to verify the proposed model. It revealed that based on the proposed strategy, the objective value could be reduced by 73.7%, which indicated that the punctuality was highly improved but not to incur excessive congestion for other vehicular traffic.

Originality/value

In this paper, the authors applied speed guidance and the adjustment of the signal control plans for multiple cycles in advance to improve the scheduled stability; furthermore, the proposed control strategy can reduce the effect on private traffics to the utmost extend.

Details

Journal of Intelligent and Connected Vehicles, vol. 3 no. 2
Type: Research Article
ISSN: 2399-9802

Keywords

Open Access
Article
Publication date: 31 March 2023

Yong Chen, Zhixian Zhan and Wei Zhang

As the strategy of 5G new infrastructure is deployed and advanced, 5G-R becomes the primary technical system for future mobile communication of China’s railway. V2V communication…

Abstract

Purpose

As the strategy of 5G new infrastructure is deployed and advanced, 5G-R becomes the primary technical system for future mobile communication of China’s railway. V2V communication is also an important application scenario of 5G communication systems on high-speed railways, so time synchronization between vehicles is critical for train control systems to be real-time and safe. How to improve the time synchronization performance in V2V communication is crucial to ensure the operational safety and efficiency of high-speed railways.

Design/methodology/approach

This paper proposed a time synchronization method based on model predictive control (MPC) for V2V communication. Firstly, a synchronous clock for V2V communication was modeled based on the fifth generation mobile communication-railway (5G-R) system. Secondly, an observation equation was introduced according to the phase and frequency offsets between synchronous clocks of two adjacent vehicles to construct an MPC-based space model of clock states of the adjacent vehicles. Finally, the optimal clock offset was solved through multistep prediction, rolling optimization and other control methods, and time synchronization in different V2V communication scenarios based on the 5G-R system was realized through negative feedback correction.

Findings

The results of simulation tests conducted with and without a repeater, respectively, show that the proposed method can realize time synchronization of V2V communication in both scenarios. Compared with other methods, the proposed method has faster convergence speed and higher synchronization precision regardless of whether there is a repeater or not.

Originality/value

This paper proposed an MPC-based time synchronization method for V2V communication under 5G-R. Through the construction of MPC controllers for clocks of adjacent vehicles, time synchronization was realized for V2V communication under 5G-R by using control means such as multistep prediction, rolling optimization, and feedback correction. In view of the problems of low synchronization precision and slow convergence speed caused by packet loss with existing synchronization methods, the observer equation was introduced to estimate the clock state of the adjacent vehicles in case of packet loss, which reduces the impact of clock error caused by packet loss in the synchronization process and improves the synchronization precision of V2V communication. The research results provide some theoretical references for V2V synchronous wireless communication under 5G-R technology.

Details

Railway Sciences, vol. 2 no. 1
Type: Research Article
ISSN: 2755-0907

Keywords

Open Access
Article
Publication date: 17 July 2023

Maha A. Alrawi

Many problems occur when assigning tasks to work centres, especially in determining the required number of workstations for line balancing which requires a minimum theoretical…

Abstract

Many problems occur when assigning tasks to work centres, especially in determining the required number of workstations for line balancing which requires a minimum theoretical number of workstations. The most common problem is bottleneck. In this paper, a method is proposed to solve floating tasks problem in single-model line when the actual required number of workstations exceeds the minimum theoretical number, and the standard time of the floating task (work center) exceeds the cycle time. The floating task will represent a critical bottleneck activity in line. The proposed method depends on minimizing the standard time of critical bottleneck and non-critical activities by a minimum free-floating time depends on the average of slack times of the non-critical activities, and it will increase the line efficiency from (77%) to (88%), and balance delay is minimized from (23%) to (12%).

Details

Emerald Open Research, vol. 1 no. 4
Type: Research Article
ISSN: 2631-3952

Keywords

Open Access
Article
Publication date: 31 March 2021

Mei Sha, Theo Notteboom, Tao Zhang, Xin Zhou and Tianbao Qin

This paper presents a generic simulation model to determine the equipment mix (quay, yard and intra-terminal transfer) for a Container Terminal Logistics Operations System…

Abstract

This paper presents a generic simulation model to determine the equipment mix (quay, yard and intra-terminal transfer) for a Container Terminal Logistics Operations System (CTLOS). The simulation model for the CTLOS, a typical type of discrete event dynamic system (DEDS), consists of three sub-models: ship queue, loading-unloading operations and yard-gate operations. The simulation model is empirically applied to phase 1 of the Yangshan Deep Water Port in Shanghai. This study considers different scenarios in terms of container throughput levels, equipment utilization rates, and operational bottlenecks, and presents a sensitivity analysis to evaluate and choose reasonable equipment ratio ranges under different operational conditions.

Details

Journal of International Logistics and Trade, vol. 19 no. 1
Type: Research Article
ISSN: 1738-2122

Keywords

Open Access
Article
Publication date: 28 November 2022

Bo Liu, Jingwen Hou, Xiaoping Ma, Mengtong Shi, Sibo Lu and Ruoxuan Wang

Due to the conflicts between left turn traffic and opposite straight-going traffic in urban traffic network, some of the traffic lanes cannot be used to discharge vehicles during…

Abstract

Purpose

Due to the conflicts between left turn traffic and opposite straight-going traffic in urban traffic network, some of the traffic lanes cannot be used to discharge vehicles during its green phases and the intersection capacity can be greatly reduced. This study/paper aims to reduce the effect of conflicts and increase its capacity through the reasonable pre-signal phase time with the exchangeable lanes.

Design/methodology/approach

This paper took into consideration various influence factors to intersection capacity and formulated the capacity optimization model based on 0-1 mixed-integer programming model. This model is efficiently solved by standard branch-and-bound algorithms.

Findings

The authors took an intersection as an example and solved the optimal signal timing and entrance lane capacity via this model. Then, simulations were carried out to verify the effect of the exchangeable lanes strategy of this intersection through the simulation software VISSIM and take the traffic volume and delay as outputs, which indicated that this model has better performance.

Originality/value

The front-end control strategy can not only exploit the full potential of the intersection but also significantly improve the operational efficiency of the intersection. It plays a positive role in improving urban intersection congestion.

Details

Smart and Resilient Transportation, vol. 4 no. 3
Type: Research Article
ISSN: 2632-0487

Keywords

Open Access
Article
Publication date: 16 March 2022

Liang Xu, Sheng Jin, Bolin Li and Jiaming Wu

This study aims to make full use of the advantages of connected and autonomous vehicles (CAVs) and dedicated CAV lanes to ensure all CAVs can pass intersections without stopping.

Abstract

Purpose

This study aims to make full use of the advantages of connected and autonomous vehicles (CAVs) and dedicated CAV lanes to ensure all CAVs can pass intersections without stopping.

Design/methodology/approach

The authors developed a signal coordination model for arteries with dedicated CAV lanes by using mixed integer linear programming. CAV non-stop constraints are proposed to adapt to the characteristics of CAVs. As it is a continuous problem, various situations that CAVs arrive at intersections are analyzed. The rules are discovered to simplify the problem by discretization method.

Findings

A case study is conducted via SUMO traffic simulation program. The results show that the efficiency of CAVs can be improved significantly both in high-volume scenario and medium-volume scenario with the plan optimized by the model proposed in this paper. At the same time, the progression efficiency of regular vehicles is not affected significantly. It is indicated that full-scale benefits of dedicated CAV lanes can only be achieved with signal coordination plans considering CAV characteristics.

Originality/value

To the best of the authors’ knowledge, this is the first research that develops a signal coordination model for arteries with dedicated CAV lanes.

Details

Journal of Intelligent and Connected Vehicles, vol. 5 no. 2
Type: Research Article
ISSN: 2399-9802

Keywords

Open Access
Book part
Publication date: 4 May 2018

Edy Fradinata, Zulnila Marli Kesuma and Siti Rusdiana

Purpose – The purpose of this study is to explore the concept of the economic lot sizing and the time cycle period of reordering. The stochastic demand is quite common in the real…

Abstract

Purpose – The purpose of this study is to explore the concept of the economic lot sizing and the time cycle period of reordering. The stochastic demand is quite common in the real environment of a cement retailer. The study compares three methods to obtain the optimal solution of a lot-sizing ordering from the real case of the previous study where the dataset is collected from the area of some retailers at Banda Aceh Province of Indonesia.

Design/Methodology/Approach – The problem model appears when the retailer with shortage has to fulfill the lot size in the optimal condition to the stochastic demand while at the same time has the backlog condition. Moreover, when the backorder needs the time horizon for replenishment where this condition influences the holding cost at the store, many retailers try to solve this problem to minimize the holding cost, but on the other side, it should fulfill the customer demand. Three methods are explored to identify that condition: a Wagner–Whitin algorithm, the Silver–Meal heuristic, and the holding and ordering costs. The three methods are applied to the lot sizing when there is a backlog.

Findings – The results of this study show that the Wagner–Whitin algorithm outperforms the other two methods. It shows that the performance increases around 27% when compared to the two other methods in this study.

Research Limitations/Implications – All models are almost approximate and useful to determine the cycle period on stochastic demand.

Practical Implications – The calculation of the dataset with the three methods would give the simple example to the retailer when he faces the uncertainty demand models. The prediction of the calculation is done accurately than the constant calculation, which is more economic.

Social Implications – The calculation will contribute to much better predictions in many cases of uncertainty.

Originality/Value – This is a initial comparative model among other methods to achieve the optimal stock and order for a retailer

Open Access
Article
Publication date: 16 March 2022

Cristian Castillo

The purpose of this study is to identify the perception of workers before, during and after the implementation of changes derived from the lean manufacturing (LM) technique called…

2549

Abstract

Purpose

The purpose of this study is to identify the perception of workers before, during and after the implementation of changes derived from the lean manufacturing (LM) technique called value stream mapping (VSM) analysis and the causes that lead to this perception.

Design/methodology/approach

A qualitative methodological research design was adopted, using individual transcribed and coded interviews as the primary method of data collection.

Findings

At the beginning of the VSM changes, this study found strong denial and resistance emotional responses from workers due to the uncertainty and stress generated. The main cause of this resistance was their lack of understanding of the VSM analysis process presenting technical concepts, due to their educational level and the lack of a pre-existing organisational culture oriented toward continuous improvement. However, in the last stage of change, it is found that the workers accepted the new improvement proposals without resignation, improving their productivity and work performance because they saw and understood the improvements as effective.

Practical implications

This study will enable those responsible for organisations to anticipate the negative reactions that may arise from the organisational changes stemming from the implementation of VSM improvements. In addition, it adds new knowledge bases to the literature on the emotional consequences for employees during LM changes through VSM.

Originality/value

This study provides a qualitative analysis of the perceived emotional impact on workers that participated in LM techniques, in this case, focused on VSM analysis. It is an exploratory study that serves as a foundation for future research in the quantitative field.

Details

Journal of Manufacturing Technology Management, vol. 33 no. 9
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 27 January 2023

Anna Trubetskaya, Olivia McDermott and Padraig Brophy

This study aims to propose a tailored Lean Six Sigma framework providing an accessible Lean Six Sigma methodology for compound feed manufacturers with the aim of mitigating rising…

5480

Abstract

Purpose

This study aims to propose a tailored Lean Six Sigma framework providing an accessible Lean Six Sigma methodology for compound feed manufacturers with the aim of mitigating rising costs and increasingly complex demands from customers.

Design/methodology/approach

A Lean Six Sigma framework was designed combining Lean value stream mapping and Six Sigma structured problem-solving with a case study in an Irish compound feed manufacturer.

Findings

The study found that the Lean Six Sigma implementation framework provided a simplified approach, which fitted the resource availability within compound feed manufacturing.

Research limitations/implications

The study is limited by the constraints of a sole case study in providing empirical evidence of the effectiveness of the framework. Nevertheless, a conceptual Lean Six Sigma model is proposed, which will assist compound feed manufacturers implementing a continuous improvement approach.

Originality/value

This paper proposes a simplified approach to the implementation of Lean Six Sigma in agricultural compound feed manufacturers and in small and medium-sized organisations. This is the first such study in Ireland and will add to the body of work on Lean in agriculture and aid other agri-businesses and compound feed manufacturers in understanding how Lean Six Sigma can benefit.

Details

International Journal of Lean Six Sigma, vol. 14 no. 5
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 10 of over 3000