Article
Publication date: 27 September 2022

Udara Sachinthana Perera, Chandana Siriwardana and Ishani Shehara Pitigala Liyana Arachchi

Infrastructures become critical with the emerging threats triggering through disasters. Sri Lanka is a country with a higher risk of disaster impacts, in which the eye-opening has…

Abstract

Purpose

Infrastructures become critical with the emerging threats triggering through disasters. Sri Lanka is a country with a higher risk of disaster impacts, in which the eye-opening has widened towards mitigating the damages towards critical infrastructures. Based on this, the purpose of this paper is to develop an index that identifies the significance of critical infrastructure resilience.

Design/methodology/approach

From the initial literature survey, disaster resilience is defined as capacity of three stages, absorptive, adaptive and restorative along with ten indicators to measure capacities. Selected indicators were then checked for suitability for scope of the research based on opinions of seven experts. Subsequently, the critical infrastructure resilience index (CIRI) was introduced such that the numerical values for each indicator are aggregated using the Z score method. Statistical relations between the actual impact against disasters and CIRI calculated for administrative regions in Sri Lanka were used as the final step to validate the developed index.

Findings

Resilience index development is presented in this paper with a comprehensive methodology of developing and validation. Further, the case study results imply the weakness and strengths in each resilience capacities, which are important in decision-making.

Research limitations/implications

Unavailability of disaster impact data and centralized data repository were main constrains in the validation process of this research. Hence proxy data was used to validate resilience index in this research.

Originality/value

This research identified and validated a novel approach of defining disaster resilience index for regional decision-making.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 15 no. 2
Type: Research Article
ISSN: 1759-5908

Keywords

Article
Publication date: 16 February 2024

M.K.S. Al-Mhdawi, Alan O'connor, Abroon Qazi, Farzad Rahimian and Nicholas Dacre

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Abstract

Purpose

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Design/methodology/approach

In this research, a three-step systematic literature review methodology was employed to analyse 55 selected articles on Critical Infrastructure Risks (CIRs) from well-regarded and relevant academic journals published from 2011 to 2023.

Findings

The findings highlight a growing research focus on CIRs from 2011 to 2023. A total of 128 risks were identified and grouped into ten distinct categories: construction, cultural, environmental, financial, legal, management, market, political, safety and technical risks. In addition, literature reviews combined with questionnaire surveys were more frequently used to identify CIRs than any other method. Moreover, oil and gas projects were the subjects most often explored in the reviewed papers. Furthermore, it was observed that publications from Iran, the USA and China dominated CIRs research, making significant contributions, accounting for 49.65% of the analysed articles.

Research limitations/implications

This research specifically focuses on five types of CIPs (i.e. roadways, bridges, water supply systems, dams and oil and gas projects). Other CIPs like cyber-physical systems or electric power systems, were not considered in this research.

Practical implications

Governments and contracting firms can benefit from the findings of this study by understanding the significant risks associated with the execution of CIPs, irrespective of the nation, industry or type of project. The results of this investigation can offer construction professionals valuable insights to formulate and implement risk response plans in the early stages of a project.

Originality/value

As a novel literature review related to CIRs, it lays the groundwork for future research and deepens the understanding of the multi-faceted effects of these risks, as well as sets practical response strategies.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 20 December 2023

Isaac Akomea-Frimpong, Xiaohua Jin, Robert Osei Kyei, Portia Atswei Tetteh, Roksana Jahan Tumpa, Joshua Nsiah Addo Ofori and Fatemeh Pariafsai

The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times…

Abstract

Purpose

The application of circular economy (CE) has received wide coverage in the built environment, including public-private partnership (PPP) infrastructure projects, in recent times. However, current studies and practical implementation of CE are largely associated with construction demolition, waste and recycling management. Few studies exist on circular models and success factors of public infrastructures developed within the PPP contracts. Thus, the main objective of this article is to identify the models and key success factors associated with CE implementation in PPP infrastructure projects.

Design/methodology/approach

A systematic review of the literature was undertaken in this study using forty-two (42) peer-reviewed journal articles from Scopus, Web of Science, Google Scholar and PubMed.

Findings

The results show that environmental factors, sustainable economic growth, effective stakeholder management, sufficient funding, utilization of low-carbon materials, effective supply chain and procurement strategies facilitate the implementation of CE in PPP infrastructure projects. Key CE business models are centered around the extension of project life cycle value, circular inputs and recycling and reuse of projects.

Research limitations/implications

Although the study presents relevant findings and gaps for further investigations, it has a limited sample size of 42 papers, which is expected to increase as CE gain more prominence in PPP infrastructure management in future.

Practical implications

The findings are relevant for decision-making by PPP practitioners to attain the social, economic and environmental benefits of transitioning to circular infrastructure management.

Originality/value

This study contributes to articulating the key models and measures toward sustainable CE in public infrastructure development.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 7 February 2022

Bankole Osita Awuzie, Zwelinzima P. Mcwari, Progress Shingai Chigangacha, Clinton Ohis Aigbavboa, Theo C. Haupt and Lovelin Obi

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project…

Abstract

Purpose

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project failure has continued unabated despite this shift by public-sector entities. Also, there appears to be limited literature focussed on seeking to provide the rationale governing the decision to outsource or insource consultancy services by public-sector organisations. The purpose of this study was to appraise the performance of public-sector projects in which consultancy services have been outsourced or insourced. These are the gaps which this study was undertaken to fill.

Design/methodology/approach

A grounded theory methodology (GTM) research design was adopted based on the nature of evidence sought and gathered from a Provincial Department of Public Works and Infrastructure (PDPWI) in South Africa. Data was obtained from a mixture of semi-structured interviews and project-specific documents spanning a five-year period and was analysed according to the procedures associated with GTM. Accordingly, open coding, axial coding and pattern matching were carried out at several intervals to develop categories and themes.

Findings

The findings of the study showed the absence of a structured approach within the PDPWI for facilitating decisions pertaining to outsourcing or insourcing consultancy services within construction projects. Furthermore, the study established that both approaches yielded similar results across all performance facets of cost, time and quality. In addition, a detailed insight into the steps required for the successful application of GTM in built environment research has been provided in the study.

Originality/value

Limited studies have been undertaken to compare the impact of either outsourced or insourced services on the organisational and project performance. This was the gap to which the study reported in this paper was undertaken to contribute.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 14 December 2022

Bryan Pieterse, Kofi Agyekum, Patrick Manu, Saeed Reza Mohandes, Clara Cheung and Akilu Yunusa-Kaltungo

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto…

Abstract

Purpose

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto been paid to the critical skills required when undertaking these projects. More specifically, the body of relevant knowledge is deprived of a study focusing on maintenance projects within the energy sector. In view of this shortcoming, this research aims to examine the critical project management (PM) skills required to deliver major maintenance projects within the energy sector.

Design/methodology/approach

Based on a quantitative research strategy, this study addressed the knowledge gap through a cross-sectional survey of professionals involved in the delivery of major maintenance projects in the United Kingdom's (UK) energy sector. Data obtained were analyzed via descriptive (e.g. frequencies, mean and standard deviation [SD]) and inferential statistical analyses (One sample t-test and exploratory factor analysis (EFA)).

Findings

Out of the 45 PM skills identified in the literature and examined by the respondents, the results obtained from the One sample t-test (based on p (1-tailed) = 0.05) showed that 37 were considered to be at least “important,” accounting for 80.4% of all the skills identified. EFA revealed a clustering of the PM skills items into seven components: “skills related to work scheduling and coordination”; “communication, risk, safety and stakeholder management skills”; “quality assurance skills”; “people management skills”; “skills related to forecasting scope and duration of outage”; “implementation of processes and time management skills” and “technical/engineering skills and experience pertaining to the outage and local site knowledge.”

Originality/value

This study has identified and contributed to the limited state-of-the-art skills project managers must possess to manage major maintenance projects in the energy sector successfully. The findings would be useful to organizations within the energy sector in ensuring that the organizations have suitable personnel in place to deliver major maintenance projects on the organizations' assets.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Abstract

Details

Urban Resilience: Lessons on Urban Environmental Planning from Turkey
Type: Book
ISBN: 978-1-83549-617-6

Article
Publication date: 11 April 2024

Yun Li, Zhe Cheng, Jiangbin Yin, Zhenshan Yang and Ming Xu

Infrastructure financialization plays a critical role in infrastructure development and urban growth around the world. However, on the one hand, the existing research on the…

Abstract

Purpose

Infrastructure financialization plays a critical role in infrastructure development and urban growth around the world. However, on the one hand, the existing research on the infrastructure financialization focuses on qualitative and lacks quantitative country-specific studies. On the other hand, the spatial heterogeneity and influencing factors of infrastructure financialization are ignored. This study takes China as a typical case to identify and analyze the spatial characteristics, development process and impact factors of infrastructure financialization.

Design/methodology/approach

To assess the development and characteristics of infrastructure financialization in China, this study constructs an evaluation index of infrastructure financialization based on the infrastructure financialization ratio (IFR). This study then analyzes the evolution process and spatial pattern of China's infrastructure financialization through the spatial analysis method. Furthermore, this study identifies and quantitatively analyzes the influencing factors of infrastructure financialization based on the spatial Dubin model. Finally, this study offers a policy suggestion as a governance response.

Findings

The results demonstrate that infrastructure financialization effectively promotes the development of infrastructure in China. Second, there are significant spatial differences in China’s infrastructure financialization. Third, many factors affect infrastructure financialization, with government participation having the greatest impact. In addition, over-financialization of infrastructure has the potential to lead to government debt risks, which is a critical challenge the Chinese Government must address. Finally, this study suggests that infrastructure financialization requires more detailed, tailored,and place-specific policy interventions by the government.

Originality/value

This study not only contributes to enriching the knowledge body of global financialization theory but also helps optimize infrastructure investment and financing policies in China and provides peer reference for other developing countries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 2 January 2024

Eylem Thron, Shamal Faily, Huseyin Dogan and Martin Freer

Railways are a well-known example of complex critical infrastructure, incorporating socio-technical systems with humans such as drivers, signallers, maintainers and passengers at…

Abstract

Purpose

Railways are a well-known example of complex critical infrastructure, incorporating socio-technical systems with humans such as drivers, signallers, maintainers and passengers at the core. The technological evolution including interconnectedness and new ways of interaction lead to new security and safety risks that can be realised, both in terms of human error, and malicious and non-malicious behaviour. This study aims to identify the human factors (HF) and cyber-security risks relating to the role of signallers on the railways and explores strategies for the improvement of “Digital Resilience” – for the concept of a resilient railway.

Design/methodology/approach

Overall, 26 interviews were conducted with 21 participants from industry and academia.

Findings

The results showed that due to increased automation, both cyber-related threats and human error can impact signallers’ day-to-day operations – directly or indirectly (e.g. workload and safety-critical communications) – which could disrupt the railway services and potentially lead to safety-related catastrophic consequences. This study identifies cyber-related problems, including external threats; engineers not considering the human element in designs when specifying security controls; lack of security awareness among the rail industry; training gaps; organisational issues; and many unknown “unknowns”.

Originality/value

The authors discuss socio-technical principles through a hexagonal socio-technical framework and training needs analysis to mitigate against cyber-security issues and identify the predictive training needs of the signallers. This is supported by a systematic approach which considers both, safety and security factors, rather than waiting to learn from a cyber-attack retrospectively.

Details

Information & Computer Security, vol. 32 no. 2
Type: Research Article
ISSN: 2056-4961

Keywords

Article
Publication date: 16 April 2024

Rishabh Rajan, Mukesh Jain and Sanjay Dhir

This study aims to identify the critical factors contributing to India-based non-governmental organizations (NGOs) capacity building and value creation for beneficiaries.

Abstract

Purpose

This study aims to identify the critical factors contributing to India-based non-governmental organizations (NGOs) capacity building and value creation for beneficiaries.

Design/methodology/approach

A total interpretive structural modeling technique has been used to develop a hierarchical model of critical factors and understand their direct and indirect interrelationships. The driving force and dependence force of these factors were determined by using cross-impact matrix multiplication applied to classification analysis.

Findings

This study identifies 12 critical factors influencing NGO capacity building in India’s intellectual disability sector across four dimensions. Internal organizational capabilities include infrastructure, staff qualifications, fundraising, vocational activities and technical resources. Second, coordination and stakeholder engagement highlight government and agency collaboration, dedicated board members and stakeholder involvement. Third, adaptability and responsiveness emphasize adjusting to external trends and seizing opportunities. Finally, impact and value creation emphasis on improving value for persons with disabilities (PWDs).

Practical implications

The findings of this study have practical implications for Indian NGOs working for PWDs. The study provides NGOs with a structural model for improving organizational capacity by identifying and categorizing critical factors into the strategic model.

Originality/value

There is a scarcity of literature on capacity building for disability-focused NGOs in India. This study seeks to identify critical factors and develop a hierarchical model of those factors to assist policymakers in India in building the capacity of NGOs.

Details

Journal of Asia Business Studies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1558-7894

Keywords

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords