Search results

1 – 10 of over 9000
Article
Publication date: 6 September 2021

Bahareh Shafipour-Omrani, Alireza Rashidi Komijan, Seyed Jafar Sadjadi, Kaveh Khalili-Damghani and Vahidreza Ghezavati

One of the main advantages of the proposed model is that it is flexible to generate n-day pairings simultaneously. It means that, despite previous researches, one-day to n-day…

Abstract

Purpose

One of the main advantages of the proposed model is that it is flexible to generate n-day pairings simultaneously. It means that, despite previous researches, one-day to n-day pairings can be generated in a single model. The flexibility in generating parings causes that the proposed model leads to better solutions compared to existing models. Another advantage of the model is minimizing the risk of COVID-19 by limitation of daily flights as well as elapsed time minimization. As airports are among high risk places in COVID-19 pandemic, minimization of infection risk is considered in this model for the first time. Genetic algorithm is used as the solution approach, and its efficiency is compared to GAMS in small and medium-size problems.

Design/methodology/approach

One of the most complex issues in airlines is crew scheduling problem which is divided into two subproblems: crew pairing problem (CPP) and crew rostering problem (CRP). Generating crew pairings is a tremendous and exhausting task as millions of pairings may be generated for an airline. Moreover, crew cost has the largest share in total cost of airlines after fuel cost. As a result, crew scheduling with the aim of cost minimization is one of the most important issues in airlines. In this paper, a new bi-objective mixed integer programming model is proposed to generate pairings in such a way that deadhead cost, crew cost and the risk of COVID-19 are minimized.

Findings

The proposed model is applied for domestic flights of Iran Air airline. The results of the study indicate that genetic algorithm solutions have only 0.414 and 0.380 gap on average to optimum values of the first and the second objective functions, respectively. Due to the flexibility of the proposed model, it improves solutions resulted from existing models with fixed-duty pairings. Crew cost is decreased by 12.82, 24.72, 4.05 and 14.86% compared to one-duty to four-duty models. In detail, crew salary is improved by 12.85, 24.64, 4.07 and 14.91% and deadhead cost is decreased by 11.87, 26.98, 3.27, and 13.35% compared to one-duty to four-duty models, respectively.

Originality/value

The authors confirm that it is an original paper, has not been published elsewhere and is not currently under consideration of any other journal.

Details

Kybernetes, vol. 51 no. 12
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 1 March 1989

M.T. Tabucanon and M.D.E. Estraza

Production planning requires that consideration be given to the various aspirations of management, customers and workers. These multiple goals, however, tend to be conflicting in…

Abstract

Production planning requires that consideration be given to the various aspirations of management, customers and workers. These multiple goals, however, tend to be conflicting in nature. A multiple goal model structure is formulated for a garment factory based on the objectives of the company including minimisation of lateness, maximisation of revenue, minimisation of production cost, and minimisation of overtime. The model was applied using real data obtained from the subject company and was run using the Sequential Linear Goal Programming (SLGP) algorithm implemented with the use of the MPSX package in an IBM computer. Sensitivity analysis was performed to give insights to the decision makers concerning trade‐offs that exist among the conflicting objectives.

Details

International Journal of Clothing Science and Technology, vol. 1 no. 3
Type: Research Article
ISSN: 0955-6222

Keywords

Article
Publication date: 13 December 2022

Jimut Bahan Chakrabarty, Soumya Roy and Shovan Chowdhury

In order to reduce avoidably lengthy duration required to test highly reliable products under usage stress, accelerated life test sampling plans (ALTSPs) are employed. This paper…

Abstract

Purpose

In order to reduce avoidably lengthy duration required to test highly reliable products under usage stress, accelerated life test sampling plans (ALTSPs) are employed. This paper aims to build a decision model for obtaining optimal sampling plan under accelerated life test setting using Type-I hybrid censoring scheme for products covered under warranty.

Design/methodology/approach

The primary decision model proposed in this paper determines ALTSP by minimizing the relevant costs involved. To arrive at the decision model, the Fisher information matrix for Type-I hybrid censoring scheme under accelerated life test setting is derived. The optimal solution is attained by utilizing appropriate techniques following a nonlinear constrained optimization approach. As a special case, ALTSP for Type-I censoring is obtained using the same approach. ALTSP under Type-I hybrid censoring using the variance minimization approach is also derived.

Findings

On comparing the optimal results obtained using the above mentioned approaches, it is found that the cost minimization approach does better in reducing the total cost incurred. Results also show that the proposed ALTSP model under cost function setting has considerably lower expected testing time. Interesting findings from the sensitivity analysis conducted using a newly introduced failure dataset pertaining to locomotive controls are highlighted.

Originality/value

The research introduces a model to design optimum ALTSP for Type-I hybrid censoring scheme. The practical viability of the model makes it valuable for real-life situations. The practical application of the proposed model is exemplified using a real-life case.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 7
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 25 July 2019

Tritos Laosirihongthong, Premaratne Samaranayake and Sev Nagalingam

The purpose of this paper is to propose a holistic approach for supplier evaluation and purchasing order allocation among the ranked suppliers who meet acceptable levels of…

2130

Abstract

Purpose

The purpose of this paper is to propose a holistic approach for supplier evaluation and purchasing order allocation among the ranked suppliers who meet acceptable levels of economic, environmental and social measures.

Design/methodology/approach

A mixed research method of case study and analytical approach is adopted in this research. A fuzzy analytical hierarchical process (FAHP) is applied for ranking of suppliers. Supplier ranks are validated using judgements from multiple decision makers. Purchasing order allocation among the ranked suppliers is determined using cost minimization subject to multiple criteria of economic, environmental and social conditions. A cement manufacturing case example demonstrates and validates the proposed approach.

Findings

The research shows that both economic and environmental considerations are significant when suppliers are evaluated for sustainable procurement within the best practice of supply management process. Ranking of suppliers, based on experts’ opinions, indicates varying degrees of importance for each criterion. Adoption of sustainable procurement criteria for evaluating supplier in a cement manufacturing organization is explained by three organizational theories including resource-based, institutional and dynamic capabilities theories. Preferred suppliers from FAHP method are confirmed by judgements from multiple decision-makers. The analysis reveals that purchasing order allocation is different when suppliers are evaluated based on their relative importance and overall ranking.

Research limitations/implications

Currently, individual performance measures and decision-makers are selected from a limited set. The purchasing allocation among ranked suppliers, subjected to cost minimization, incorporates environmental objective of acceptable carbon dioxide emission and social perspective of health and safety of workers, and provides a new approach for dual supplier evaluation and purchasing allocation problem in cement industry. Adopting the proposed supplier evaluation and order allocation approach in practice needs to be guided by the operational principles and an overall methodology which is appropriate for the specific industry with sustainability objectives.

Practical implications

This research enables decision-makers to incorporate sustainability analysis in the supplier evaluation as the basis for best practice with an industry-friendly holistic approach. Using organizational theories, the research re-enforces the importance of not only the energy consumption and environmental management systems of environmental dimension as driving forces/factors from Institutional theory perspective, but also pollution controls and prevention as purchasing capabilities from resource-based theory perspective. The proposed approach is expected to motivate decision-makers to consider sustainable perspectives in supplier evaluation and order allocation processes in a global supply chain and can become a benchmarking tool.

Social implications

Suppliers’ information on health and safety of their truck drivers are used in order allocation, thus emphasizing the importance of social dimension and encouraging better conditions and benchmarking for delivery drivers.

Originality/value

This paper extends the contribution to the literature by providing guidelines for managers to set strategies, benchmarks and policies within broader sustainable supply chain practices and demonstrates the applicability of the approach using a cement-manufacturing scenario in an emerging economy.

Content available
Book part
Publication date: 12 March 2019

Hamed Fazlollahtabar and Mohammad Saidi-Mehrabad

Abstract

Details

Cost Engineering and Pricing in Autonomous Manufacturing Systems
Type: Book
ISBN: 978-1-78973-469-0

Article
Publication date: 27 April 2010

Krystsina Bakhrankova

The purpose of this paper is to develop energy optimizer (ENEO) – a model‐based decision support system (DSS) for an existing European chemical plant with a multi‐stage continuous…

2457

Abstract

Purpose

The purpose of this paper is to develop energy optimizer (ENEO) – a model‐based decision support system (DSS) for an existing European chemical plant with a multi‐stage continuous production process. The system comprises two modules – energy cost minimization and joined energy cost minimization and output maximization. Following the description of the researched production, the paper presents a gist of the underlying formulations. Then, it tests the DSS on real data instances with a focus on its configuration, practical implications and implementation challenges.

Design/methodology/approach

The design of the planning tool is consistent with that of the model‐based DSS and based on the existing information systems. The defined research problems are explored with the use of quantitative methods – the operations research methodology.

Findings

The findings show that ENEO reflects the essence of the researched production process and can provide benefits in practical business operations.

Research limitations/implications

Both the proposed system configuration and the formulated models lay a foundation to further research within the described industrial setting.

Practical implications

The system can be utilized in daily operations to provide substantial cost savings, improved capacity utilization and reactivity.

Originality/value

This paper contributes to research by bridging the gap between theory and practice. On the one hand, it describes an unexplored problem and its subsequent solution embodied in the DSS. On the other hand, it emphasizes the importance of applying the operations research methodology to the real‐world issues. Therefore, this work is valuable to both academics and practitioners.

Details

Industrial Management & Data Systems, vol. 110 no. 4
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 8 August 2016

Janya Chanchaichujit, Jose Saavedra-Rosas, Mohammed Quaddus and Martin West

The purpose of this paper is to take the first step in solving environmental supply chain management issues. It proposes a green supply chain management (GSCM) model which would…

1259

Abstract

Purpose

The purpose of this paper is to take the first step in solving environmental supply chain management issues. It proposes a green supply chain management (GSCM) model which would provide environmental benefits to the Thai rubber industry. To this end, a GSCM optimisation model was formulated, whereby the manufacturing processes of rubber products, along with their distribution and transportation, could be improved. The expected result is that total greenhouse gas emissions would be minimised and environmental performance maximised.

Design/methodology/approach

Linear programming was chosen as the mathematical programming for investigation into the problem of finding the association of quantity of rubber product flow between the supply chain entities (farmer, trader group, and factory) and the transportation mode and route, with a view to minimise total greenhouse gas emissions.

Findings

The results indicate that by using the proposed model, GHG emissions could be minimised to 1.08 tons of GHGs per ton of product.

Practical implications

A GSCM model developed in this research can be used as a decision support tool for Thai rubber policy makers. This would allow them to better manage the Thai rubber industry to achieve environmental benefit.

Originality/value

This research is among the first attempts to develop a GSCM model for the Thai rubber industry. It can contribute to providing a basis for a GSCM modelling framework, along with a formulation for research development in this area.

Details

The International Journal of Logistics Management, vol. 27 no. 2
Type: Research Article
ISSN: 0957-4093

Keywords

Abstract

Details

Cost Engineering and Pricing in Autonomous Manufacturing Systems
Type: Book
ISBN: 978-1-78973-469-0

Article
Publication date: 1 June 2010

Mohammed Nurul Alam

The purpose of the paper is to present the result of an empirical review as to how and to what extent the interest‐free microfinance to micro entrepreneurs contributes in…

Abstract

The purpose of the paper is to present the result of an empirical review as to how and to what extent the interest‐free microfinance to micro entrepreneurs contributes in minimising different cots of both the lender and the borrowers. An institutional‐network theoretical approach is used to study the phenomenon. A qualitative nature of research methodology is used while studying this particular phenomenon. A multiple explanatory case study was adopted as a research strategy in order to focus on contemporary phenomenon within the real life context of different rural‐based micro entrepreneurs and their relationships with the lending organisations. Interest‐free microfinance by Islamic banks is characterised by a close supervision and an in‐kind type of financing, which contributes greatly in promoting lender‐borrower network relationships between the bank and the rural based micro entrepreneurs. Such network relationships result in minimising exchange costs and other business related costs of both the borrowers and the lending organisations. The study was mainly concerned with rural‐based micro entrepreneurs who are engaged in grass‐root type entrepreneurs like poultry and diary firm, handloom industry, etc. Particular reference is made here to the facts of rural‐based micro entrepreneurs and their relationships with Islamic banks in Bangladesh.

Details

World Journal of Entrepreneurship, Management and Sustainable Development, vol. 6 no. 3
Type: Research Article
ISSN: 2042-5961

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of over 9000