Search results

1 – 10 of over 5000
Article
Publication date: 27 December 2022

Bright Awuku, Eric Asa, Edmund Baffoe-Twum and Adikie Essegbey

Challenges associated with ensuring the accuracy and reliability of cost estimation of highway construction bid items are of significant interest to state highway transportation…

Abstract

Purpose

Challenges associated with ensuring the accuracy and reliability of cost estimation of highway construction bid items are of significant interest to state highway transportation agencies. Even with the existing research undertaken on the subject, the problem of inaccurate estimation of highway bid items still exists. This paper aims to assess the accuracy of the cost estimation methods employed in the selected studies to provide insights into how well they perform empirically. Additionally, this research seeks to identify, synthesize and assess the impact of the factors affecting highway unit prices because they affect the total cost of highway construction costs.

Design/methodology/approach

This paper systematically searched, selected and reviewed 105 papers from Scopus, Google Scholar, American Society of Civil Engineers (ASCE), Transportation Research Board (TRB) and Science Direct (SD) on conceptual cost estimation of highway bid items. This study used content and nonparametric statistical analyses to determine research trends, identify, categorize the factors influencing highway unit prices and assess the combined performance of conceptual cost prediction models.

Findings

Findings from the trend analysis showed that between 1983 and 2019 North America, Asia, Europe and the Middle East contributed the most to improving highway cost estimation research. Aggregating the quantitative results and weighting the findings using each study's sample size revealed that the average error between the actual and the estimated project costs of Monte-Carlo simulation models (5.49%) performed better compared to the Bayesian model (5.95%), support vector machines (6.03%), case-based reasoning (11.69%), artificial neural networks (12.62%) and regression models (13.96%). This paper identified 41 factors and was grouped into three categories, namely: (1) factors relating to project characteristics; (2) organizational factors and (3) estimate factors based on the common classification used in the selected papers. The mean ranking analysis showed that most of the selected papers used project-specific factors more when estimating highway construction bid items than the other factors.

Originality/value

This paper contributes to the body of knowledge by analyzing and comparing the performance of highway cost estimation models, identifying and categorizing a comprehensive list of cost drivers to stimulate future studies in improving highway construction cost estimates.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 11 August 2022

Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on…

2086

Abstract

Purpose

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on personal preferences and the evaluation of direct costs. Researchers and practitioners have debated appropriate measurement systems for evaluating the impacts of prefabricated products and for comparing them with conventional on-site construction practices. The more advanced, cost–benefit approach to evaluating prefabricated products often inspires controversy because it may generate inaccurate results when converting non-monetary effects into costs. As prefabrication may affect multiple organisations and product subsystems, the method used to decide on production methods should consider multiple direct and indirect impacts, including nonmonetary ones. Thus, this study aims to develop a multi-criteria method to evaluate both the monetary and non-monetary impacts of prefabrication solutions to facilitate decision-making on whether to use prefabricated products.

Design/methodology/approach

Drawing upon a literature review, this research suggests a multi-criteria method that combines the choosing-by-advantage approach with a cost–benefit analysis. The method was presented for validation in focus group discussions and tested in a case involving a prefabricated bathroom.

Findings

The analysis indicates that the method helps a project’s stakeholders communicate about the relative merits of prefabrication and conventional construction while facilitating the final decision of whether to use prefabrication.

Originality/value

This research contributes a method of evaluating the monetary and non-monetary impacts of prefabricated products. The research underlines the need to evaluate the diverse benefits and sacrifices that stakeholder face when considering production methods in construction.

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 February 2024

Nandini Sharma and Boeing Laishram

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of…

Abstract

Purpose

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of quality (COQ) is one such method used to address the concern. However, the absence of measurable COQ factors to monitor quality costs hampers the implementation of COQ framework in the construction industry. Therefore, this study aims to identify COQ factors focused on visible factors (VF) and hidden factors (HF) and the current requirements to achieve it.

Design/methodology/approach

This study is based on Preferred Reporting Items for Systematic Review and Meta-Analyses protocol guidelines. The present study identified 57 articles published between 1992 and 2023 in peer-reviewed journals.

Findings

The findings reveal 22 factors, which are grouped into four categories based on COQ. Through systematic review, the authors observed limited methodological and theoretical diversity. In fact, there are no quantitative frameworks to calculate COQ. The study, therefore, developed a framework comprising four major routes/paths of COQ factors within the framework.

Practical implications

The COQ routes developed through this study will enable the practitioners to meticulously categorise VF and HF, facilitating quantifying of quality throughout the lifecycle of project, which is currently absent from the existing quality assurance/quality control (QA/QC) approach. In addition, these COQ routes stand as essential construction strategies, significantly enhancing outcomes related to time, cost, quality, sustainability and fostering closer relationships within project frameworks.

Originality/value

The current study contributes significantly to the existing body of knowledge by developing various COQ routes and proposing future research directions to address gaps in the literature.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 18 April 2024

P. Pragha, Krantiraditya Dhalmahapatra, Murali Sambasivan, Pradeep Rathore and Esha Saha

The study intends to evaluate students’ intention to shift from cash payment to mobile payment system for academic fee payments through push, pull and mooring framework. Push…

Abstract

Purpose

The study intends to evaluate students’ intention to shift from cash payment to mobile payment system for academic fee payments through push, pull and mooring framework. Push factors comprise risk and service-related factors, pull factors consist of subjective and aspect-based factors and mooring factors include cost and cognitive factors.

Design/methodology/approach

Sample of the study consists of around 296 undergraduate and postgraduate students from different higher educational institutions located in India. The questionnaire for data collection comprises 21 Likert scale-based items distributed among seven constructs. Partial least square structural equation modeling is used to identify the significant factors influencing students’ intentions.

Findings

Five of the factors, namely, risk, service, subjective, aspect and cognitive significantly influence student’s intention to switch to mobile payment system for academic fee payments. Moderation analysis indicates that the impact of the push and pull factors on switching intention towards mobile payments has a more positive influence among male students.

Originality/value

This study is probably the only study that tested the specific push, pull and mooring factors influencing intention to switch to mobile payment from cash payment in the Indian education system based on the incentive, Fogg behavior and status quo bias theory for academic fee payment.

Details

Journal of Applied Research in Higher Education, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2050-7003

Keywords

Article
Publication date: 29 February 2024

Kármen Kovács

The purpose of this paper is to develop a systematic literature review on the sunk cost effect from consumers’ perspectives. By applying a comprehensive approach, this paper aims…

Abstract

Purpose

The purpose of this paper is to develop a systematic literature review on the sunk cost effect from consumers’ perspectives. By applying a comprehensive approach, this paper aims to synthesise and discuss the impact of financial and behavioural sunk costs on consumers’ decisions, judgements and behaviour before and after purchasing. This study also identifies potential research avenues to inspire further studies.

Design/methodology/approach

Following a search in the Scopus and Web of Science databases, a systematic literature review was conducted by identifying and analysing 56 peer-reviewed articles published between 1985 and 2022 (November). Descriptive and content analysis was implemented based on the selected papers to examine and synthesise the effect of sunk costs on consumers’ choices, evaluations and actions in a comprehensive approach; uncover research gaps; and recommend paths for future research.

Findings

The research results found in the literature are discussed according to five related themes: factors affecting the sunk cost effect; the impact of past investments on purchasing decisions; consumers’ post-purchasing evaluation, behaviour and choices; the mental amortisation of price; and the sunk cost effect on loyalty and switching.

Originality/value

The originality of this study lies in the comprehensive approach to the sunk cost effect from consumers’ perspectives. This review paper synthesises and discusses the research results found in the literature related to financial and behavioural sunk costs that can influence consumers’ decisions, judgements and behaviour before and after paying for a good or service.

Details

Journal of Consumer Marketing, vol. 41 no. 2
Type: Research Article
ISSN: 0736-3761

Keywords

Article
Publication date: 23 September 2022

Hossein Sohrabi and Esmatullah Noorzai

The present study aims to develop a risk-supported case-based reasoning (RS-CBR) approach for water-related projects by incorporating various uncertainties and risks in the…

Abstract

Purpose

The present study aims to develop a risk-supported case-based reasoning (RS-CBR) approach for water-related projects by incorporating various uncertainties and risks in the revision step.

Design/methodology/approach

The cases were extracted by studying 68 water-related projects. This research employs earned value management (EVM) factors to consider time and cost features and economic, natural, technical, and project risks to account for uncertainties and supervised learning models to estimate cost overrun. Time-series algorithms were also used to predict construction cost indexes (CCI) and model improvements in future forecasts. Outliers were deleted by the pre-processing process. Next, datasets were split into testing and training sets, and algorithms were implemented. The accuracy of different models was measured with the mean absolute percentage error (MAPE) and the normalized root mean square error (NRSME) criteria.

Findings

The findings show an improvement in the accuracy of predictions using datasets that consider uncertainties, and ensemble algorithms such as Random Forest and AdaBoost had higher accuracy. Also, among the single algorithms, the support vector regressor (SVR) with the sigmoid kernel outperformed the others.

Originality/value

This research is the first attempt to develop a case-based reasoning model based on various risks and uncertainties. The developed model has provided an approving overlap with machine learning models to predict cost overruns. The model has been implemented in collected water-related projects and results have been reported.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 March 2024

Morten Jakobsen

The purpose of this paper is to gain insight into how management accountants can become relevant business partners out of respect for existing locally developed accounts of…

Abstract

Purpose

The purpose of this paper is to gain insight into how management accountants can become relevant business partners out of respect for existing locally developed accounts of economic performance for decision-making.

Design/methodology/approach

The paper is based on qualitative semi-structured interviews with local business actors, in this case, families from seven financially successful Danish dairy farms. The casework and the analysis have been informed by pragmatic constructivism.

Findings

The local business actors do not use the official accounting system for ongoing cost-management-related decision-making. Instead, they use several epistemic methods that include locally developed decision models, experiences, rules of thumb and intuition. The farmers use these vernacular accountings to compensate for the cost management illusion that the formal accounting system tends to create. What the study suggests is that when management accountants engage as business partners, they are likely to enter a space where accounting is already present.

Originality/value

This paper argues that local business actors practice epistemic methods where they develop and use vernacular accountings to support their managerial practice, also in the absence of a professional management accountant. These vernacular accountings may lead the local actors into an illusion because the vernacular accountings do not necessarily have an inherent economic logic and theoretical reliability. The role of the management accountant in such a setting is hence to understand, support and advance local epistemic methods. Becoming a business partner requires a combination of management accounting analytical skills and a sense of empathy and sensitivity regarding what is already at play and how this can become an object of discussion without violating the values of the other.

Details

Qualitative Research in Accounting & Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1176-6093

Keywords

Open Access
Article
Publication date: 29 March 2024

Haihan Li, Per Hilletofth, David Eriksson and Wendy Tate

This study aims to investigate the manufacturing reshoring decision-making content from an Eclectic Paradigm perspective.

299

Abstract

Purpose

This study aims to investigate the manufacturing reshoring decision-making content from an Eclectic Paradigm perspective.

Design/methodology/approach

Data were collected through a six-step systematic literature review on factors influencing manufacturing reshoring decision-making. The review is based on 100 peer-reviewed journal papers discussing reshoring decision-making contents published from 2009 to 2022.

Findings

In total, 80 decision factors were extracted and then categorized into resource-seeking (8%), market-seeking (11%), efficiency-seeking (41%) and strategic asset-seeking (16%) advantages. Additionally, 24% of these were identified as hybrid, which means that they were classified into multiple categories. Some decision factors were further identified as reshoring influencing factors (i.e. drivers, enablers and barriers).

Research limitations/implications

Scholars need to consider what other theories can be used or developed to identify and evaluate the decision factors (determinants) of manufacturing reshoring as well as how currently adopted theory can be further advanced to create clearer and comprehensive theoretical frameworks.

Practical implications

This research underscores the importance of developing clearer and more comprehensive theoretical frameworks. For practitioners, understanding the multifaceted nature of decision factors could enhance strategic decision-making regarding reshoring initiatives.

Originality/value

To the best of the authors’ knowledge, this is the first study to investigate the value and practicality of the Eclectic Paradigm in categorizing factors in manufacturing reshoring decision-making content and presents in-depth theoretical classifications. In addition, it bridges the gap between decision factors and influencing factors in the decision-making content research realm.

Details

European Business Review, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0955-534X

Keywords

1 – 10 of over 5000