Article
Publication date: 27 December 2022

Bright Awuku, Eric Asa, Edmund Baffoe-Twum and Adikie Essegbey

Challenges associated with ensuring the accuracy and reliability of cost estimation of highway construction bid items are of significant interest to state highway transportation…

Abstract

Purpose

Challenges associated with ensuring the accuracy and reliability of cost estimation of highway construction bid items are of significant interest to state highway transportation agencies. Even with the existing research undertaken on the subject, the problem of inaccurate estimation of highway bid items still exists. This paper aims to assess the accuracy of the cost estimation methods employed in the selected studies to provide insights into how well they perform empirically. Additionally, this research seeks to identify, synthesize and assess the impact of the factors affecting highway unit prices because they affect the total cost of highway construction costs.

Design/methodology/approach

This paper systematically searched, selected and reviewed 105 papers from Scopus, Google Scholar, American Society of Civil Engineers (ASCE), Transportation Research Board (TRB) and Science Direct (SD) on conceptual cost estimation of highway bid items. This study used content and nonparametric statistical analyses to determine research trends, identify, categorize the factors influencing highway unit prices and assess the combined performance of conceptual cost prediction models.

Findings

Findings from the trend analysis showed that between 1983 and 2019 North America, Asia, Europe and the Middle East contributed the most to improving highway cost estimation research. Aggregating the quantitative results and weighting the findings using each study's sample size revealed that the average error between the actual and the estimated project costs of Monte-Carlo simulation models (5.49%) performed better compared to the Bayesian model (5.95%), support vector machines (6.03%), case-based reasoning (11.69%), artificial neural networks (12.62%) and regression models (13.96%). This paper identified 41 factors and was grouped into three categories, namely: (1) factors relating to project characteristics; (2) organizational factors and (3) estimate factors based on the common classification used in the selected papers. The mean ranking analysis showed that most of the selected papers used project-specific factors more when estimating highway construction bid items than the other factors.

Originality/value

This paper contributes to the body of knowledge by analyzing and comparing the performance of highway cost estimation models, identifying and categorizing a comprehensive list of cost drivers to stimulate future studies in improving highway construction cost estimates.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 August 2023

Mengkai Liu and Meng Luo

The poor capacity of prefabricated construction cost estimation is the essential reason for the low profitability of the general contractor. Therefore, this study aims to focus on…

Abstract

Purpose

The poor capacity of prefabricated construction cost estimation is the essential reason for the low profitability of the general contractor. Therefore, this study aims to focus on the cost estimation of prefabricated construction as the research object. This research aims to enhance the accuracy of total project cost estimation for general contractors, ultimately leading to improved profitability.

Design/methodology/approach

This study used Vensim PLE software to establish a system dynamics model. In the modeling process, a systematic research review was used to identify cost-influencing factors; ABC classification and the analytic hierarchy process were used to score and determine the weights of influencing factors.

Findings

The total cost error obtained by the model is less than 2% compared with the actual value. It can be used to cost estimation and analysis. The analysis results indicate that there are 7 key factors, among which the prefabrication rate has the most significant impact. Furthermore, the model can provide the extreme range cost; the minimum cost can reduce by 13% from the value in the case. The factor's value can compose a cost control strategy for general contractors.

Practical implications

The cost of prefabricated buildings can be estimated well, and deciding the prefabrication rate is crucial. The cost can be declined by correct cost control strategies when bidding and subcontracting are in process. The strategies can follow the direction of the model.

Originality/value

A systemic, quantitative and qualitative analysis of cost estimation of prefabricated buildings for general contractors has been conducted. A mathematical model has been developed and validated to facilitate more effective cost-control measures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 June 2023

Chinthaka Niroshan Atapattu, Niluka Domingo and Monty Sutrisna

Cost overrun is one of the critical issues faced in construction projects, as nine out of ten projects will likely go over the budget. In particular, transportation infrastructure…

Abstract

Purpose

Cost overrun is one of the critical issues faced in construction projects, as nine out of ten projects will likely go over the budget. In particular, transportation infrastructure (TI) projects, such as roads and bridges, are vastly affected by cost overruns, which can delay the entire project. This research intends to identify the factors affecting the cost overruns in New Zealand (NZ) TI projects.

Design/methodology/approach

The research was conducted using a questionnaire survey involving ninety-two participants experienced in infrastructure project estimation in NZ. Quantitative methods were used to analyse the data.

Findings

Fifty-three factors were identified through literature under ten categories. Based on the survey, ten significant factors were identified with a high grade of importance. The three most critical factors were “frequent design changes,” “poor planning and scheduling” and “inadequate tender documentation.” It was found that the cost overrun is primarily affected by the pre-contract stage causes.

Research limitations/implications

The data were collected from professionals involved in NZTI projects. Therefore, the implications may be different for other contexts.

Practical implications

The results will improve the current estimation practice by developing a new statistical model considering all the significant variables for NZTI projects.

Originality/value

Although much research is done to identify these factors, they are only considered in a few statistical cost models. These new statistical models mainly focused on technical variable factors similar to the current standard estimation process. However, the results of this research, qualitative and quantitative factors, will be used for the future cost model.

Details

Built Environment Project and Asset Management, vol. 13 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 13 July 2022

Soud Mohammad Almahamid, Nehal Almurbati, Adel Ismail Al-Alawi and Mohammed Al Fataih

The study aims to develop an integrated model for three-dimensional (3D) printing adoption in the Gulf Cooperation Council (GCC) context to form a baseline for more theoretical…

Abstract

Purpose

The study aims to develop an integrated model for three-dimensional (3D) printing adoption in the Gulf Cooperation Council (GCC) context to form a baseline for more theoretical and empirical debate from emerging markets.

Design/methodology/approach

A qualitative approach with a convenience sample is adopted since there is no formal body that has accurate data about the number of companies, governmental bodies, nongovernmental organizations, universities, labs, etc. that already have adopted 3D printing.

Findings

The results indicate that the technological usefulness of 3D printing and its ease-of-use factor were found to be lacking among community members and governmental officials. Yet, these factors were the most influential factor affecting the spread of 3D printing technology adoption in the GCC countries. Nevertheless, the adaptation of 3D printing is not yet at the level of its global markets, nor is it used within leading companies’ assembly lines. In addition, the 3D printing awareness and use increased during the COVID-19 pandemic. Yet, the adaptation rate is still below expectations due to several challenges that face the growth of the 3D printing market in the GCC countries. The most vital challenge facing 3D printing growth is manifested in governmental policies and regulations.

Practical implications

Companies’ managers can benefit from the current study results by focusing on the factors that facilitate 3D adoption and avoiding bottle-neck factors that hinder the speed of the 3D adoption. 3D providers can also benefit by understanding the factors that affect 3D adoption and designing their machine and marketing strategy in a way that helps the intended companies to easily adopt 3D printing.

Originality/value

To the best of the authors’ knowledge, this is the first study that explored 3D printing adoption on the GCC countries’ level. It also adds a new flavor to the literature by exploring 3D adoption during the COVID-19 crisis.

Details

Journal of Science and Technology Policy Management, vol. 14 no. 5
Type: Research Article
ISSN: 2053-4620

Keywords

Article
Publication date: 1 December 2021

Kassim Slim Zeni and Geraldine John Kikwasi

The state of public buildings in Tanzania exhibits evidence of a lack of maintenance and repair. Despite efforts to raise the performance of public buildings, little emphasis is…

Abstract

Purpose

The state of public buildings in Tanzania exhibits evidence of a lack of maintenance and repair. Despite efforts to raise the performance of public buildings, little emphasis is placed on maintenance works and related factors affecting maintenance costs of public buildings, which are often high. This study aims to examine factors affecting maintenance costs of public buildings.

Design/methodology/approach

This was a case study involving two government building agencies – Tanzania Buildings Agency (TBA) and National Housing Corporation (NHC). A total of 387 tenants and 29 experts participated in the study. Data were collected using questionnaires and analyzed using Stata version 16 – descriptive statistics feature reporting absolute numbers and frequencies.

Findings

Both tenants and experts ranked building age, poor quality control, building material used, execution of work when it is urgent and inadequate financial resources as major factors affecting maintenance costs of public buildings. In the distinctive rating, tenants ranked resource management as a major factor, while experts ranked ignorance about the property of materials, misuse of buildings and faulty maintenance as major factors.

Research limitations/implications

The study has some limitations such as geographical coverage which is limited to Dar es Salaam and Dodoma regions, hence missing information from other regions may have different experiences. Additionally, data were collected in a self-reported manner which could bring about information bias.

Practical implications

Findings of this study provide an insight on recent developments on the factors affecting maintenance cost of buildings using two cases of NHC and TBA which are single entities owning a substantial amount of housing units in Tanzania. Factors affecting the maintenance cost of public buildings identified in this study is a threshold for experts to devise strategies for minimizing maintenance costs.

Originality/value

To the best of the authors’ knowledge, this is the first study that assessed factors affecting maintenance cost in public buildings run by TBA and NHC from the tenant and expert perspectives.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 5
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 8 June 2023

Jean C. Essila and Jaideep Motwani

This study aims to focus on the supply chain (SC) cost drivers of healthcare industries in the USA, as SC costs have increased 40% over the last decade. The second-most…

Abstract

Purpose

This study aims to focus on the supply chain (SC) cost drivers of healthcare industries in the USA, as SC costs have increased 40% over the last decade. The second-most significant expense, the SC, accounts for 38% of total expenses in a typical hospital, while most other industries can operate within 10% of their operating cost. This makes healthcare centers supply-chain-sensitive organizations with limited facilities for high-quality healthcare services. As the cost drivers of healthcare SC are almost unknown to managers, their jobs become more complex.

Design/methodology/approach

Guided by pragmatism and positivism paradigms, a cross-sectional study has been designed using quantitative and deductive approaches. Both primary and secondary data were used. Primary data were collected from health centers across the country, and secondary data were from healthcare-related databases. This study examined the attributes that explain the most significant variation in each contributing factor. With multiple regression analysis for predicting cost and Student's t-tests for the significance of contributing factors, the authors of this study examined different theories, including the market-based view and five-forces, network and transaction cost analysis.

Findings

This study revealed that supply, materials and services represent the most significant expenses in primary care. Supply-chain cost breakdown results in four critical factors: facility, inventory, information and transportation.

Research limitations/implications

This study examined the data from primary and secondary care institutions. Tertiary and quaternary care systems were not included. Although tertiary and quaternary care systems represent a small portion of the healthcare system, future research should address the supply chain costs of highly specialized organizations.

Practical implications

This study suggests methods that can help to improve supply chain operations in healthcare organizations worldwide.

Originality/value

This study presents an empirically proven methodology for testing the statistical significance of the primary factors contributing to healthcare supply chain costs. The results of this study may lead to positive policy changes to improve healthcare organizations' efficiency and increase access to high-quality healthcare.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 2 May 2022

Shima Amini, Alireza Rezvani, Mohsen Tabassi and Seyed Saeed Malek Sadati

Cost overruns have been identified as the most significant challenge for construction sector stakeholders. Like many developing countries, the Iranian construction industry…

1370

Abstract

Purpose

Cost overruns have been identified as the most significant challenge for construction sector stakeholders. Like many developing countries, the Iranian construction industry suffers from poor cost performance. So, the current research aims to investigate the causes of cost overrun in Iranian construction projects. This paper also reviews the findings of similar studies conducted in several Asian countries.

Design/methodology/approach

This paper includes a literature review and a quantitative method with a questionnaire survey. The review is limited to the studies investigating the causes of cost overrun in an Asian country in the last decade. Moreover, the current research was conducted through a questionnaire prepared based on 43 common factors identified through the literature review. The required data were gathered from the representatives involved in handling construction activities in Iran. The collected data were analyzed based on relative importance index (RII), using the SPSS software package.

Findings

The results showed that poor site management, improper planning, fluctuation of prices of materials, lack of experience, and poor economic condition are the critical reasons for cost overrun in Iranian construction projects. The findings also indicated that among the studies conducted in Asian countries, the first three factors have the highest frequency.

Originality/value

This paper highlighted most studies concerning the cost overrun factors in construction projects in different Asian countries in recent years. Up-to-date knowledge helps to understand the complexity of this field in various periods and therefore minimizes the risk of cost overrun. This research can also be used as a benchmark for further studies to clarify similar issues in other developing countries.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 May 2023

Sanjib Chowdhury

This paper aims to deal with a real-life strategic conflict in joint operations (JOs) for facility location decision and planning in an oil and gas field that stretches over two…

Abstract

Purpose

This paper aims to deal with a real-life strategic conflict in joint operations (JOs) for facility location decision and planning in an oil and gas field that stretches over two countries and tries to develop a basis for mitigating such conflict.

Design/methodology/approach

This paper develops a novel approach using integer linear programming (ILP) to determine optimal facility location considering technical, economic and environmental factors. Strategic decision-making in JOs is also influenced by business priorities of individual partner, sociopolitical issues and other covert factors. The cost-related quantitative factors are normalized using inverse normalization function as these are to be minimized, and qualitative factors that are multi-decision-making criteria are maximized, thus transforming both qualitative and quantitative factors as a single objective of maximization in ILP model.

Findings

The model identifies the most suitable facility location based on a wide range of factors that would provide maximum benefit in the long term, which will help decision-makers and managers.

Research limitations/implications

The model can be expanded incorporating other quantitative and qualitative factors such as tax incentives by the government, local bodies and government regulations.

Practical implications

The applicability of the model is not limited to JOs or oil/gas field, but is applicable to a wide range of sectors.

Originality/value

The model is transparent and based on rational and scientific basis, which would help in building consensus among the dissenting parties and aid in mitigating strategic conflict. Such type of model for mitigating strategic conflict has not been reported/used before.

Details

Journal of Global Operations and Strategic Sourcing, vol. 16 no. 3
Type: Research Article
ISSN: 2398-5364

Keywords

Open Access
Article
Publication date: 11 August 2022

Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on…

2042

Abstract

Purpose

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on personal preferences and the evaluation of direct costs. Researchers and practitioners have debated appropriate measurement systems for evaluating the impacts of prefabricated products and for comparing them with conventional on-site construction practices. The more advanced, cost–benefit approach to evaluating prefabricated products often inspires controversy because it may generate inaccurate results when converting non-monetary effects into costs. As prefabrication may affect multiple organisations and product subsystems, the method used to decide on production methods should consider multiple direct and indirect impacts, including nonmonetary ones. Thus, this study aims to develop a multi-criteria method to evaluate both the monetary and non-monetary impacts of prefabrication solutions to facilitate decision-making on whether to use prefabricated products.

Design/methodology/approach

Drawing upon a literature review, this research suggests a multi-criteria method that combines the choosing-by-advantage approach with a cost–benefit analysis. The method was presented for validation in focus group discussions and tested in a case involving a prefabricated bathroom.

Findings

The analysis indicates that the method helps a project’s stakeholders communicate about the relative merits of prefabrication and conventional construction while facilitating the final decision of whether to use prefabrication.

Originality/value

This research contributes a method of evaluating the monetary and non-monetary impacts of prefabricated products. The research underlines the need to evaluate the diverse benefits and sacrifices that stakeholder face when considering production methods in construction.

Article
Publication date: 11 May 2023

Norsafiah Norazman, Siti Nurul Asma’ Mohd Nashruddin and Adi Irfan Che-Ani

Urban population growth has increased housing density, which has expanded the construction of low-cost low-rise residential in urban areas. Good building performance and effective…

Abstract

Purpose

Urban population growth has increased housing density, which has expanded the construction of low-cost low-rise residential in urban areas. Good building performance and effective low-cost low-rise residential quality lead to higher user satisfaction and improve building sustainability. This study aims to focus on the factors influencing the sustainability of low-cost low-rise residential in the West Malaysia urban area to assess resident satisfaction.

Design/methodology/approach

A mixed-mode approach with both qualitative and quantitative were used in this study. Semi-structured interviews were conducted with 12 stakeholders to identify the common factors influencing sustainability in low-cost low-rise residential. Subsequently, questionnaire surveys were formed and distributed among building users to determine the satisfaction level with low-cost low-rise residential building performance.

Findings

The finding demonstrates that accessibility is the key factor to achieving sustainability of low-cost low-rise residential. The finding also related to the factor that influences both stakeholders and building user satisfaction levels. This study also identifies key areas that require attention to improve user satisfaction with building sustainability and building performance of low-cost low-rise residential.

Originality/value

This study aims to determine stakeholder and building user satisfaction levels in relation to the sustainable building factor. A few indicators have been set up to identify the factors that most influence the sustainability and environment of low-cost low-rise residential buildings. Each subchapter has a few recommendations to improve the performance of low-cost low-rise residential. Each of the factors mentioned is related to social, economic and environmental sustainability. In addition, the study discovered a strong connection between low-cost low-rise residential performance and user satisfaction.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords