1 – 10 of over 5000Udani Chathurika Edirisinghe, Md Moazzem Hossain and Manzurul Alam
This study aims to explore the managerial conception of the determinants and barriers of sustainability integration into management control systems (MCS) of manufacturing…
Abstract
Purpose
This study aims to explore the managerial conception of the determinants and barriers of sustainability integration into management control systems (MCS) of manufacturing companies in Sri Lanka. Although existing literature has explored the factors that influence the adoption of specific management controls to handle environmental and social issues, the role of management conception has been underrepresented. Specifically, literature is scarce in identifying contextual and organisational factors that influence corporates beyond mere adoption of controls but to integrate with regular controls, especially in developing countries such as Sri Lanka.
Design/methodology/approach
A multiple case study approach has been used to identify the management conception of barriers and enablers for sustainability control integration. The analysis is conducted based on a theoretical framework extending the work of Gond et al. (2012) and George et al. (2016). To obtain an in-depth and multifaceted view, semi-structured interviews were conducted with managers in charge of different functional departments of five manufacturing companies.
Findings
The findings identified managers’ perceived factors, such as environmental impact, stakeholder pressure (customer, competitor and regulatory authorities) and top management commitment, showing a clear difference between strongly and weakly integrated companies. Contrary to the literature, domestic regulatory pressure and multinational ownership do not sufficiently drive MCS sustainability integration.
Practical implications
The findings have implications for managers and practitioners to anticipate the potential barriers and determinants of sustainability integration and provide guidance to take proper measures to deal with them when designing and implementing their MCS.
Originality/value
The study adds value to the literature by presenting a theoretical framework based on the triangulation of different theories to recognise the significance of management idea in sustainable integration. Furthermore, because sustainable integration of MCS is a novel idea, this research is one of the earlier attempts to highlight problems from the perspective of developing countries.
Details
Keywords
Mojdeh Naderi, Ahad Nazari, Ali Shafaat and Sepehr Abrishami
This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of…
Abstract
Purpose
This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of enhancing the accuracy of cost performance indicators in construction project management.
Design/methodology/approach
An innovative approach is proposed, employing the activity-based costing (ABC) accounting method combined with building information modelling (BIM) to assign real overhead costs to project activities. This study, distinguished by its incorporation of a real case study, focuses on an administrative building with a four-story concrete structure. It establishes an automated method for evaluating project cost performance through the detailed analysis of earned value management (EVM) cost indicators derived from ABC results and BIM data.
Findings
The results show that the ABC integration improves the accuracy of cost performance indicators by over 9%, revealing the project's true cost index for the first time and demonstrating the substantial value of the approach in construction engineering and management.
Research limitations/implications
The current study highlights a notable gap in the existing literature, addressing the challenges in onsite overhead cost estimation and offering a solution that incorporates the state-of-the-art techniques.
Practical implications
The proposed method has significant implications for project managers and practitioners, enabling better-informed decisions based on precise cost data, ultimately leading to enhanced project outcomes.
Originality/value
This research uniquely combines ABC and BIM, presenting a pioneering solution for the accurate estimation and management of COCs in construction projects, adding significant value to the current body of knowledge in this field.
Details
Keywords
Sahar Jawad, Ann Ledwith and Rashid Khan
There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…
Abstract
Purpose
There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.
Design/methodology/approach
This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.
Findings
Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.
Practical implications
The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.
Originality/value
This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.
Details
Keywords
Lipeng Pan, Yongqing Li, Xiao Fu and Chyi Lin Lee
This paper aims to explore the pathways of carbon transfer in 200 US corporations along with the motivations that drive such transfers. The particular focus is on each firm’s…
Abstract
Purpose
This paper aims to explore the pathways of carbon transfer in 200 US corporations along with the motivations that drive such transfers. The particular focus is on each firm’s embeddedness in the global value chain (GVC) and the influence of environmental law, operational costs and corporate social responsibility (CSR). The insights gleaned bridge a gap in the literature surrounding GVCs and corporate carbon transfer.
Design/methodology/approach
The methodology comprised a two-step research approach. First, the authors used a two-sided fixed regression to analyse the relationship between each firm’s embeddedness in the GVC and its carbon transfers. The sample consisted of 217 US firms. Next, the authors examined the influence of environmental law, operational costs and CSR on carbon transfers using a quantitative comparison analysis. These results were interpreted through the theoretical frameworks of the GVC and legitimacy theory.
Findings
The empirical results indicate positive relationships between carbon transfers and GVC embeddedness in terms of both a firm’s position and its degree. From the quantitative comparison, the authors find that the pressure of environmental law and operational costs motivate these transfers through the value chain. Furthermore, CSR does not help to mitigate transfers.
Practical implications
The findings offer insights for policymakers, industry and academia to understand that, with globalised production and greater value creation, transferring carbon to different parts of the GVC – largely to developing countries – will only become more common. The underdeveloped nature of environmental technology in these countries means that global emissions will likely rise instead of fall, further exacerbating global warming. Transferring carbon is not conducive to a sustainable global economy. Hence, firms should be closely regulated and given economic incentives to reduce emissions, not simply shunt them off to the developing world.
Social implications
Carbon transfer is a major obstacle to effectively reducing carbon emissions. The responsibilities of carbon transfer via GVCs are difficult to define despite firms being a major consideration in such transfers. Understanding how and why corporations engage in carbon transfers can facilitate global cooperation among communities. This knowledge could pave the way to establishing a global carbon transfer monitoring network aimed at preventing corporate carbon transfer and, instead, encouraging emissions reduction.
Originality/value
This study extends the literature by investigating carbon transfers and the GVC at the firm level. The authors used two-step research approach including panel data and quantitative comparison analysis to address this important question. The authors are the primary study to explore the motivation and pathways by which firms transfer carbon through the GVC.
Details
Keywords
Dilan Weerasooriya, K.A.T.O Ranadewa and B.A.K.S Perera
Cyber-physical systems (CPS) enable the synergistic integration of virtual models with the physical environment. This integration is gaining recognition for its potential to…
Abstract
Purpose
Cyber-physical systems (CPS) enable the synergistic integration of virtual models with the physical environment. This integration is gaining recognition for its potential to enhance construction project information management, thereby contributing to improved cost management in construction. Similarly, quantity surveyor (QS) plays a key role in construction projects by estimating and monitoring construction costs. Consequently, this research aims to explore redefining the role of QSs by integrating CPS.
Design/methodology/approach
The research adopted an interpretivism stance to collect and analyse data. Two rounds of 21 and 19 semi-structured interviews were conducted, with experts selected through heterogeneous purposive sampling. Code-based content analysis was used to analyse the data using NVivo12. MS Visio data visualisation tool was used to present the findings.
Findings
It is empirically proven the potential of CPS to facilitate nine key roles of QSs in all stages of the RIBA plan of work through the identification of 15 CPS applications and technologies. Nine key roles of QSs that CPS can facilitate were identified as preliminary estimation, measurement and quantification, contract administration, preparation of BOQ, interim valuation and payments, tender and contract documentation, cost planning, cost control and procurement advice. The study explored how adopting CPS technologies can transform traditional quantity surveying practices and enhance their value within the construction industry.
Originality/value
The findings add to the body of knowledge by redefining the role of QS through the integration of CPS for the first time and then by highlighting the usages of CPS in the construction industry rather than limiting it to a specific sector of the construction industry, as previous studies have done. This research uncovers several other research arenas on CPS as being the very first research to evaluate CPS to facilitate key roles of QSs. The findings can enhance the awareness and the practical implementation of CPS by intervening to form more partnerships among application developers and industry leaders.
Details
Keywords
Jing An, Suicheng Li and Xiao Ping Wu
Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…
Abstract
Purpose
Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.
Design/methodology/approach
It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.
Findings
The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.
Originality/value
The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.
Details
Keywords
This study aims to investigate the relationship between boardroom gender diversity (BoGD) and risk-taking by property-liability (P-L) stock insurers from an analytical framework…
Abstract
Purpose
This study aims to investigate the relationship between boardroom gender diversity (BoGD) and risk-taking by property-liability (P-L) stock insurers from an analytical framework that control for organizational form and ownership structure. It relies on the behavioral agency model, the resource dependency theory and the concept of socioemotional wealth (SEW).
Design/methodology/approach
This study builds on an unbalanced panel of 2,285 firm-year observations from 232 European and US P-L stock insurers covering the period 2010–2019 and measure risk-taking by using four proxies: total risk (TR), upside risk (UpR), downside risk (DwR) and default risk (DR). Reverse causality and endogeneity concerns are treated by applying different approaches.
Findings
Findings suggest that BoGD mitigates the TR, DwR and DR but does not interfere with the UpR, which conceptualizes firm expectations to enhance patrimony and safeguard SEW for heirs, especially in family-owned insurers. The findings hold in various robustness checks including endogeneity and alternative specifications of BoGD and risk-taking.
Practical implications
This study contributes to practice by contrasting the role of female directors’ bevahior when assuming risk, which seems significantly different depending on the risk-taking specification and the organizational form. The author advises policyholders and policymakers to look at closely on BoGD and ownership structure as they affect insurance company risk-taking.
Originality/value
This study takes a more direct approach to highlight the BoGD’s effect on corporate risk-taking by focusing on the insurance sector which is characterized by risk and uncertainty bearing. To the best of the author’s knowledge, this is the first study to consider the full range of the stock organizational forms and the degree of family control in displaying this effect in both widely traded and closely traded insurers and to assess risk-taking from both market-based and accounting-based aspects.
Details
Keywords
Francis Nuako, Frank Ato Ghansah and Thomas Adusei
It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…
Abstract
Purpose
It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”
Design/methodology/approach
This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.
Findings
This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.
Practical implications
When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.
Originality/value
The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.
Details
Keywords
The article addresses the optimization of safety stock service levels for parts in a repair kit. The work was undertaken to assist a public transit entity that stores thousands of…
Abstract
Purpose
The article addresses the optimization of safety stock service levels for parts in a repair kit. The work was undertaken to assist a public transit entity that stores thousands of parts used to repair equipment acquired over many decades. Demand is intermittent, procurement lead times are long, and the total inventory investment is significant.
Design/methodology/approach
Demand exists for repair kits, and a repair cannot start until all required parts are available. The cost model includes holding cost to carry the part being modeled as well as shortage cost that consists of the holding cost to carry all other repair kit parts for the duration of the part’s lead time. The model combines deterministic and stochastic approaches by assuming a fixed ordering cycle with Poisson demand.
Findings
The results show that optimal service levels vary as a function of repair demand rate, part lead time, and cost of the part as a percentage of the total part cost for the repair kit. Optimal service levels are higher for inexpensive parts and lower for expensive parts, although the precise levels are impacted by repair demand and part lead time.
Social implications
The proposed model can impact society by improving the operational performance and efficiency of public transit systems, by ensuring that home repair technicians will be prepared for repair tasks, and by reducing the environmental impact of electronic waste consistent with the right-to-repair movement.
Originality/value
The optimization model is unique because (1) it quantifies shortage cost as the cost of unnecessary holding other parts in the repair kit during the shortage time, and (2) it determines a unique service level for each part in a repair kit bases on its lead time, its unit cost, and the total cost of all parts in the repair kit. Results will be counter-intuitive for many inventory managers who would assume that more critical parts should have higher service levels.
Details
Keywords
This research aims to examine the effects of corporate digital transformation on firm value, with a particular focus on the mediating roles played by cost leadership and…
Abstract
Purpose
This research aims to examine the effects of corporate digital transformation on firm value, with a particular focus on the mediating roles played by cost leadership and differentiation strategies.
Design/methodology/approach
This study employs word frequency analysis to create corporate digital transformation indicators and determine how corporate digital transformation impacts firm value. The data used in the analysis comes from 2,056 listed manufacturing enterprises in China between 2010 and 2019.
Findings
This study demonstrates that digital transformation has a favorable impact on firm value, and that cost leadership strategy and differentiation strategy significantly mediate the relationship between both of them.
Research limitations/implications
This study utilized word frequency analysis to assess the state of corporate digital transformation. It lacked a more thorough description of internal production processes, operational efficiency, and the pace of digital transformation.
Practical implications
The results of this study can not only promote the digital transformation and firm value, but also provide a theoretical basis for enterprises to choose a reasonable competitive strategy in the digital transformation.
Originality/value
This study contributes significantly to the field of firm value research by including digital transformation as a fundamental component. Furthermore, it investigates how cost leadership strategy and differentiation strategy play mediating roles, providing a new perspective and explanatory mechanism for understanding the influence of digital transformation on firm value.
Details