Search results

21 – 30 of over 271000
Article
Publication date: 14 March 2024

Marcel Peppel, Stefan Spinler and Matthias Winkenbach

The e-commerce boom presents new challenges for last-mile delivery (LMD), which may be mitigated by new delivery technologies. This paper evaluates the impact of mobile parcel…

Abstract

Purpose

The e-commerce boom presents new challenges for last-mile delivery (LMD), which may be mitigated by new delivery technologies. This paper evaluates the impact of mobile parcel lockers (MPL) on costs and CO2 equivalent (CO2e) emissions in existing LMD networks, which include home delivery and shipments to stationary parcel lockers.

Design/methodology/approach

To describe customers’ preferences, we design a multinomial logit model based on recipients’ travel distance to pick-up locations and availability at home. Based on route cost estimation, we define the operating costs for MPLs. We devise a mathematical model with binary decision variables to optimize the location of MPLs.

Findings

Our study demonstrates that integrating MPLs leads to additional cost savings of 8.7% and extra CO2e emissions savings of up to 5.4%. Our analysis of several regional clusters suggests that MPLs yield benefits in highly populous cities but may result in additional emissions in more rural areas where recipients drive longer distances to pick-ups.

Originality/value

This paper designs a suitable operating model for MPLs and demonstrates environmental and economic savings. Moreover, it adds recipients’ availability at home to receive parcels improving the accuracy of stochastic demand. In addition, MPLs are evaluated in the context of several regional clusters ranging from large cities to rural areas. Thus, we provide managerial guidance to logistics service providers how and where to deploy MPLs.

Details

International Journal of Physical Distribution & Logistics Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0960-0035

Keywords

Article
Publication date: 1 March 2024

Yuxuan Chang and Xiaoyang Zhao

This paper examines whether technological changes that promote communications between investors and managers help bridge the gap in the cost of equity capital among firms in…

Abstract

Purpose

This paper examines whether technological changes that promote communications between investors and managers help bridge the gap in the cost of equity capital among firms in different regions.

Design/methodology/approach

We use the online interaction platforms of listed firms in China and utilize brokerage presence (BP) to capture the geographic distribution of financial factors. We explore whether online interactions would reduce the cost of equity to a greater extent for firms located in low brokerage presence regions (hereafter “low-BP firms”) than those in high brokerage presence regions (hereafter “high-BP firms”).

Findings

We find low-BP firms benefit more from an improved information environment created by online interactions. We also find that posts about low-BP firms are more value-relevant and useful in processing corporate disclosures. Further, a higher number of interactions significantly enhances more informational efficiency for low-BP firms, and the effect of reducing the gap in financing costs is more pronounced when corporate information is complex.

Originality/value

We conclude that online interactions alleviate geography-induced information frictions and create a relatively level playing field for firms located in all regions.

Details

Journal of Accounting Literature, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0737-4607

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 13 March 2024

Keanu Telles

The paper provides a detailed historical account of Douglass C. North's early intellectual contributions and analytical developments in pursuing a Grand Theory for why some…

Abstract

Purpose

The paper provides a detailed historical account of Douglass C. North's early intellectual contributions and analytical developments in pursuing a Grand Theory for why some countries are rich and others poor.

Design/methodology/approach

The author approaches the discussion using a theoretical and historical reconstruction based on published and unpublished materials.

Findings

The systematic, continuous and profound attempt to answer the Smithian social coordination problem shaped North's journey from being a young serious Marxist to becoming one of the founders of New Institutional Economics. In the process, he was converted in the early 1950s into a rigid neoclassical economist, being one of the leaders in promoting New Economic History. The success of the cliometric revolution exposed the frailties of the movement itself, namely, the limitations of neoclassical economic theory to explain economic growth and social change. Incorporating transaction costs, the institutional framework in which property rights and contracts are measured, defined and enforced assumes a prominent role in explaining economic performance.

Originality/value

In the early 1970s, North adopted a naive theory of institutions and property rights still grounded in neoclassical assumptions. Institutional and organizational analysis is modeled as a social maximizing efficient equilibrium outcome. However, the increasing tension between the neoclassical theoretical apparatus and its failure to account for contrasting political and institutional structures, diverging economic paths and social change propelled the modification of its assumptions and progressive conceptual innovation. In the later 1970s and early 1980s, North abandoned the efficiency view and gradually became more critical of the objective rationality postulate. In this intellectual movement, North's avant-garde research program contributed significantly to the creation of New Institutional Economics.

Details

EconomiA, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1517-7580

Keywords

Article
Publication date: 4 March 2024

Hemanth Kumar N. and S.P. Sreenivas Padala

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based…

Abstract

Purpose

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based multiobjective optimization (MOO) model integrating the nondominated sorting genetic algorithm III (NSGA-III) to enhance sustainability. The goal is to reduce embodied energy and cost in the design process.

Design/methodology/approach

Through a case study research method, this study uses BIM, NSGA-III and real-world data in five phases: literature review, identification of factors, BIM model development, MOO model creation and validation in the architecture, engineering and construction sectors.

Findings

The innovative BIM-based MOO model optimizes embodied energy and cost to achieve sustainable construction. A commercial building case study validation showed a reduction of 30% in embodied energy and 21% in cost. This study validates the model’s effectiveness in integrating sustainability goals, enhancing decision-making, collaboration, efficiency and providing superior assessment.

Practical implications

This model delivers a unified approach to sustainable design, cutting carbon footprint and strengthening the industry’s ability to attain sustainable solutions. It holds potential for broader application and future integration of social and economic factors.

Originality/value

The research presents a novel BIM-based MOO model, uniquely focusing on sustainable construction with embodied energy and cost considerations. This holistic and innovative framework extends existing methodologies applicable to various buildings and paves the way for additional research in this area.

Article
Publication date: 15 March 2024

Nan Feng, Lei Zhang, Xin Liu and Jing Xie

With the development of digitalization and interconnection, there is a growing need for enterprise customers to ensure the compatibility of the third-party components they are…

Abstract

Purpose

With the development of digitalization and interconnection, there is a growing need for enterprise customers to ensure the compatibility of the third-party components they are using in the manufacturing process, thus raising the integration requirements for the Industrial Internet platform and its third-party developers. Therefore, our study investigates the optimal integration decision of the Industrial Internet platform while considering its access price, the integration cost, and the net utility derived by enterprise customers from the third-party components.

Design/methodology/approach

We model a two-sided Industrial Internet platform that connects customers on the demand side to the developers on the supply side. We then explore the integration decision of the Industrial Internet platform and its important factors by solving the optimal profit function.

Findings

First, despite the high integration cost of third-party developers, the platform still chooses to integrate when enterprise customers derive high utility from the third-party components. Second, due to the compatibility effect, charging the enterprise customers a higher price may reduce the platform profits when these customers derive low utility from the third-party components. Third, the platform profits will increase along with the integration cost of third-party developers when it is low in the case where enterprise customers derive low utility from third-party components.

Originality/value

Our findings offer insightful takeaways for the Industrial Internet platform when making integration decisions.

Details

Industrial Management & Data Systems, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 19 March 2024

John Maleyeff and Jingran Xu

The article addresses the optimization of safety stock service levels for parts in a repair kit. The work was undertaken to assist a public transit entity that stores thousands of…

Abstract

Purpose

The article addresses the optimization of safety stock service levels for parts in a repair kit. The work was undertaken to assist a public transit entity that stores thousands of parts used to repair equipment acquired over many decades. Demand is intermittent, procurement lead times are long, and the total inventory investment is significant.

Design/methodology/approach

Demand exists for repair kits, and a repair cannot start until all required parts are available. The cost model includes holding cost to carry the part being modeled as well as shortage cost that consists of the holding cost to carry all other repair kit parts for the duration of the part’s lead time. The model combines deterministic and stochastic approaches by assuming a fixed ordering cycle with Poisson demand.

Findings

The results show that optimal service levels vary as a function of repair demand rate, part lead time, and cost of the part as a percentage of the total part cost for the repair kit. Optimal service levels are higher for inexpensive parts and lower for expensive parts, although the precise levels are impacted by repair demand and part lead time.

Social implications

The proposed model can impact society by improving the operational performance and efficiency of public transit systems, by ensuring that home repair technicians will be prepared for repair tasks, and by reducing the environmental impact of electronic waste consistent with the right-to-repair movement.

Originality/value

The optimization model is unique because (1) it quantifies shortage cost as the cost of unnecessary holding other parts in the repair kit during the shortage time, and (2) it determines a unique service level for each part in a repair kit bases on its lead time, its unit cost, and the total cost of all parts in the repair kit. Results will be counter-intuitive for many inventory managers who would assume that more critical parts should have higher service levels.

Details

Journal of Quality in Maintenance Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 28 March 2024

Chinthaka Niroshan Atapattu, Niluka Domingo and Monty Sutrisna

The current estimation practice in construction projects greatly needs upgrading, as there has been no improvement in the cost overrun issue over the past 70 years. The purpose of…

Abstract

Purpose

The current estimation practice in construction projects greatly needs upgrading, as there has been no improvement in the cost overrun issue over the past 70 years. The purpose of this research was to develop a new multiple regression analysis (MRA)-based model to forecast the final cost of road projects at the pre-design stage using data from 43 projects in New Zealand (NZ).

Design/methodology/approach

The research used the case study of 43 completed road projects in NZ. Document analysis was conducted to collect data, and statistical tests were used for model development and analysis.

Findings

Eight models were developed, and all models achieved the required F statistics and met the regression assumptions. The models’ mean absolute percentage error (MAPE) was between 21.25% and 22.77%. The model with the lowest MAPE comprised the road length and width, number of bridges, pavement area, cut and fill area, preliminary cost and cost indices change.

Research limitations/implications

The model is based on road projects in NZ. However, it was designed to be able to adapt to other contexts. The findings suggest that the model can be used to improve traditional conceptual estimating methods. Past project data is often stored by the project team but rarely used for analysing and forecasting purposes. This research emphasises that past data can be effectively used to predict the project cost at the pre-design stage with limited information.

Originality/value

No research was conducted to adopt cost modelling techniques into the conceptual estimation practice in the NZ construction industry.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 22 March 2024

Sanaz Khalaj Rahimi and Donya Rahmani

The study aims to optimize truck routes by minimizing social and economic costs. It introduces a strategy involving diverse drones and their potential for reusing at DNs based on…

20

Abstract

Purpose

The study aims to optimize truck routes by minimizing social and economic costs. It introduces a strategy involving diverse drones and their potential for reusing at DNs based on flight range. In HTDRP-DC, trucks can select and transport various drones to LDs to reduce deprivation time. This study estimates the nonlinear deprivation cost function using a linear two-piece-wise function, leading to MILP formulations. A heuristic-based Benders Decomposition approach is implemented to address medium and large instances. Valid inequalities and a heuristic method enhance convergence boundaries, ensuring an efficient solution methodology.

Design/methodology/approach

Research has yet to address critical factors in disaster logistics: minimizing the social and economic costs simultaneously and using drones in relief distribution; deprivation as a social cost measures the human suffering from a shortage of relief supplies. The proposed hybrid truck-drone routing problem minimizing deprivation cost (HTDRP-DC) involves distributing relief supplies to dispersed demand nodes with undamaged (LDs) or damaged (DNs) access roads, utilizing multiple trucks and diverse drones. A Benders Decomposition approach is enhanced by accelerating techniques.

Findings

Incorporating deprivation and economic costs results in selecting optimal routes, effectively reducing the time required to assist affected areas. Additionally, employing various drone types and their reuse in damaged nodes reduces deprivation time and associated deprivation costs. The study employs valid inequalities and the heuristic method to solve the master problem, substantially reducing computational time and iterations compared to GAMS and classical Benders Decomposition Algorithm. The proposed heuristic-based Benders Decomposition approach is applied to a disaster in Tehran, demonstrating efficient solutions for the HTDRP-DC regarding computational time and convergence rate.

Originality/value

Current research introduces an HTDRP-DC problem that addresses minimizing deprivation costs considering the vehicle’s arrival time as the deprivation time, offering a unique solution to optimize route selection in relief distribution. Furthermore, integrating heuristic methods and valid inequalities into the Benders Decomposition approach enhances its effectiveness in solving complex routing challenges in disaster scenarios.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 8 March 2024

Satyajit Mahato and Supriyo Roy

Managing project completion within the stipulated time is significant to all firms' sustainability. Especially for software start-up firms, it is of utmost importance. For any…

Abstract

Purpose

Managing project completion within the stipulated time is significant to all firms' sustainability. Especially for software start-up firms, it is of utmost importance. For any schedule variation, these firms must spend 25 to 40 percent of the development cost reworking quality defects. Significantly, the existing literature does not support defect rework opportunities under quality aspects among Indian IT start-ups. The present study aims to fill this niche by proposing a unique mathematical model of the defect rework aligned with the Six Sigma quality approach.

Design/methodology/approach

An optimization model was formulated, comprising the two objectives: rework “time” and rework “cost.” A case study was developed in relevance, and for the model solution, we used MATLAB and an elitist, Nondominated Sorting Genetic Algorithm (NSGA-II).

Findings

The output of the proposed approach reduced the “time” by 31 percent at a minimum “cost”. The derived “Pareto Optimal” front can be used to estimate the “cost” for a pre-determined rework “time” and vice versa, thus adding value to the existing literature.

Research limitations/implications

This work has deployed a decision tree for defect prediction, but it is often criticized for overfitting. This is one of the limitations of this paper. Apart from this, comparing the predicted defect count with other prediction models hasn’t been attempted. NSGA-II has been applied to solve the optimization problem; however, the optimal results obtained have yet to be compared with other algorithms. Further study is envisaged.

Practical implications

The Pareto front provides an effective visual aid for managers to compare multiple strategies to decide the best possible rework “cost” and “time” for their projects. It is beneficial for cost-sensitive start-ups to estimate the rework “cost” and “time” to negotiate with their customers effectively.

Originality/value

This paper proposes a novel quality management framework under the Six Sigma approach, which integrates optimization of critical metrics. As part of this study, a unique mathematical model of the software defect rework process was developed (combined with the proposed framework) to obtain the optimal solution for the perennial problem of schedule slippage in the rework process of software development.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

21 – 30 of over 271000