Search results

1 – 10 of 959
Open Access
Article
Publication date: 27 September 2021

Monique Rieger Rodrigues and Søren Munch Lindhard

The traditional construction delivery method is challenged by low trust and collaboration issues, resulting in increased project costs. The integrated project delivery (IPD…

5779

Abstract

Purpose

The traditional construction delivery method is challenged by low trust and collaboration issues, resulting in increased project costs. The integrated project delivery (IPD) method is developed, through a contractual agreement, to overcome these challenges by creating a common set of terms, expectations and project goals.

Design/methodology/approach

A singular construction case was followed during a four-month period. Data collection consisted of contract documents and a series of semi-structured interviews with representatives from the owner, design-group and contractors.

Findings

The IPD contract was found to have a number of positive effects; it improved project behavior (e.g. trust, collaboration and communication), increased ownership among project participants and improved buildability of the design, leading to fewer surprises and interruptions in the construction phase. The study also revealed a number of challenges including contractual and legal challenges and involving too many participants in the early phases. Moreover, co-location was identified as a particular important supporting element, to build relations and improve collaboration.

Originality/value

This research identified lessons learned from the application, as well as initial barriers and persistent barriers for implementing IPD. To improve IPD application the top three lessons were as follows: 1) the contractual documents should be adapted and signed at an early stage as this increases financial transparency, 2) cost estimates should be carried as an iterative process and project main concept be freezed at an early stage to increase understanding and minimize risks, 3) only the most important project developers should be involved in the early phases, to avoid going into detailed design issues before the main concept is completed.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 27 January 2023

Farooq Ali and Harri Haapasalo

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by…

3216

Abstract

Purpose

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by developing a conceptual framework. From this, the authors aim to describe the links among these concepts in terms of development levels of stakeholder relationships. In addition, the authors aim to identify challenges and preconditions in relation to developing relationships at different levels.

Design/methodology/approach

The authors have adopted the directed approach of qualitative content analysis method to validate and extend the conceptual framework of this study. The context of this study is a large hospital construction project located in northern Finland.

Findings

The findings of this study suggest that collaboration is a multilevel process of active engagement of multiple stakeholders. These stakeholders must have a high degree of shared understanding in terms of cooperation, control and coordination to achieve the mutually desired outcomes. This study also identifies the challenges that project stakeholders could face in developing collaborative relationships and propose preconditions for the same.

Practical implications

This study provides a better understanding for project managers to manage interorganisational collaborative construction projects successfully. The outcome of this research would be beneficial to project management team to deliver dispute-free construction projects.

Originality/value

Existing practical research on the development of relationships at different levels in collaborative construction projects is limited. This study offers a framework for the same which is validated in a real-life project.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 7 July 2022

Kirsi Aaltonen and Virpi Turkulainen

In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large…

2108

Abstract

Purpose

In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large project governance model was institutionalized at an industrial sector-level through both industry-level activities and “institutional projects”.

Design/methodology/approach

This study builds on the foundations of institutional fields and institutional change, suggesting that projects are not only shaped by their contexts but also produce institutional change themselves. We conducted extensive fieldwork on the institutionalization of a collaborative project governance model in Finland.

Findings

The findings illustrate how institutional change in governance of large and complex inter-organizational projects is created at the institutional field level. The institutionalized collaborative project governance model includes aspects of both relational and contractual governance. The change was facilitated by temporal links between the institutional projects as well as vertical links between the institutional projects and the field-level development programs.

Originality/value

This is one of the first studies to address how a collaborative large project governance model becomes the norm at the institutional field level beyond the boundaries of an individual project or organization.

Details

International Journal of Operations & Production Management, vol. 42 no. 8
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 4 August 2022

Christopher Amoah and Hlatshwayo Nkosazana

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study…

4853

Abstract

Purpose

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.

Design/methodology/approach

A quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.

Findings

The findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.

Research limitations/implications

Even though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.

Practical implications

To effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.

Originality/value

The study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 18 February 2022

Kimmo Keskiniva, Arto Saari and Juha-Matti Junnonen

This study aims to provide a foundation for the development of subcontracts that suit takt production in construction.

Abstract

Purpose

This study aims to provide a foundation for the development of subcontracts that suit takt production in construction.

Design/methodology/approach

This is a non-empiric conceptual study, which integrates takt production and general construction literature into new proposals for subcontract clauses suitable for takt production in construction. This study uses literature reviews, from which proposals regarding takt production viable subcontract clauses are conducted via logical reasoning.

Findings

A total of 13 proposals for takt production applicable subcontracts are provided in this study. The proposals emphasize detailed and collaborative planning, suitable payment methods and flexibility for takt plan modification.

Originality/value

Previous takt literature has not properly addressed the development of subcontracts for takt production, despite regular attempts to use subcontracting in takt production. This study aims to aid main contractors to create fair and suitable subcontracts, so that adhering to takt schedules could be more viable in practice. This study also acts as a foundation for further empirical studies regarding the subject.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 17 September 2020

Ruth Dixon

This paper investigates how outcomes-based performance management (PM) regimes operate in the partnerships known as social impact bonds (SIBs), which bring together partners from…

1587

Abstract

Purpose

This paper investigates how outcomes-based performance management (PM) regimes operate in the partnerships known as social impact bonds (SIBs), which bring together partners from the public, private and third sectors. The findings are analysed in the light of the different cultural world views of the partners.

Design/methodology/approach

Published evaluations of 25 UK SIBs were analysed by a qualitative multiple case study approach. This study of secondary sources permitted the analysis of a wide range of SIB partnerships from near contemporary accounts.

Findings

Outcomes frameworks led to rigorous PM regimes that brought the cultural differences between partners into focus. While partnerships benefitted from the variety of viewpoints and expertise, the differences in outlook simultaneously led to strains and tensions. In order to mitigate such tensions, some stakeholders conformed to the outlooks of others.

Practical implications

The need to achieve a predefined set of payable outcomes embeds a “linear” view of intervention and effect on the SIB partners and a performance regime in which some partners dominate. In designing accountability systems for partnerships such as SIBs, commissioners should consider how the performance regime will affect the interests of all stakeholders.

Originality/value

This study adds to the cultural theory literature which has rarely considered three-way partnerships embodying hierarchical, individualist and egalitarian world views and how performance regimes operate in such partnerships. Three-way partnerships are thought to be rare and short-lived, but this empirical study shows that they can be successful albeit over a predefined lifespan.

Details

International Journal of Public Sector Management, vol. 34 no. 3
Type: Research Article
ISSN: 0951-3558

Keywords

Content available
924

Abstract

Details

International Journal of Operations & Production Management, vol. 34 no. 2
Type: Research Article
ISSN: 0144-3577

Open Access
Article
Publication date: 5 December 2023

Jacopo Ballerini, Daniele Giordino, Luboš Smrčka and Francesca Culasso

Food and beverage (F&B) small and medium-sized enterprises (SMEs) must diversify their markets and obtain predictable sources of revenues to withstand difficult and volatile…

Abstract

Purpose

Food and beverage (F&B) small and medium-sized enterprises (SMEs) must diversify their markets and obtain predictable sources of revenues to withstand difficult and volatile periods such as the post-pandemic geopolitical scenario, recently burdened by the Russian-Ukrainian conflict. On the other hand, another strand of the literature suggests that public procurement could be considered a great source of income, enabling solid contracts, revenues and cash-flow stability. Therefore, this paper aims to explore the role of public procurement, the adoption of e-commerce platforms and their interactions in affecting the exporting performances of SMEs operating in the F&B sector.

Design/methodology/approach

The study retrieves data from 2,186 Italian F&B manufacturing SMEs relying on Margò by Cribis database. Therefore, it conducts a structured equational model (SEM) to test the developed hypotheses empirically.

Findings

The findings reveal that digital selling platforms positively affect exports, whereas public procurement negatively affects F&B SMEs exports. Nonetheless, findings underline that the interaction between public procurement and the adoption of digital selling platforms dampens public procurement's negative effects on exports.

Originality/value

This study brings an original contribution to the F&B literature by conducting empirical research on an extensive sample of firms from one of the most influential countries in the F&B vertical, Italy, with officially registered data. More importantly, to the best of the authors' knowledge, this study pioneers the investigation of the relationship between public procurement and e-commerce platforms in affecting F&B SMEs' export performances.

Details

European Journal of Innovation Management, vol. 26 no. 7
Type: Research Article
ISSN: 1460-1060

Keywords

Open Access
Article
Publication date: 29 June 2020

Andreas Norrman and Andreas Wieland

This invited article explores current developments in supply chain risk management (SCRM) practices by revisiting the classical case of Ericsson (Norrman and Jansson, 2004) after…

12607

Abstract

Purpose

This invited article explores current developments in supply chain risk management (SCRM) practices by revisiting the classical case of Ericsson (Norrman and Jansson, 2004) after 15 years, and updating its case description and analysis of its organizational structure, processes and tools for SCRM.

Design/methodology/approach

An exploratory case study is conducted with a longitudinal focus, aiming to understand both proactive and reactive SCRM practices using a holistic perspective of a real-life example.

Findings

The study demonstrates how Ericsson's SCRM practices have developed, indicating that improved functional capabilities are increasingly combined across silos and leveraged by formalized learning processes. Important enablers are IT capabilities, a fine-grained and cross-functional organization, and a focus on monitoring and compliance. Major developments in SCRM are often triggered by incidents, but also by requirements from external stakeholders and new corporate leaders actively focusing on SCRM and related activities.

Research limitations/implications

Relevant areas for future research are proposed, thereby increasing the knowledge of how companies can develop SCRM practices and capabilities further.

Practical implications

Being one of few in-depth holistic case studies of SCRM, decision-makers can learn about many practices and tools. Of special interest is the detailed description of how Ericsson reactively responded to the Fukushima incident (2011), and how it proactively engaged in monitoring and assessment activities. It is also exemplified how SCRM practices could continuously be developed to make them “stick” to the organization, even in stable times.

Originality/value

This is one of the first case studies to delve deeper into the development of SCRM practices through taking a longitudinal approach.

Details

International Journal of Physical Distribution & Logistics Management, vol. 50 no. 6
Type: Research Article
ISSN: 0960-0035

Keywords

Open Access
Article
Publication date: 8 November 2022

Inimbom Walter Isang and David Ojimaojo Ebiloma

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction…

2856

Abstract

Purpose

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction sector. By integrating the principle of sustainable construction, it can minimise the environmental and socio-economic impact of Covid-19. This research therefore aims at developing strategies to achieve sustainable project performance in the post-Covid era in Nigeria.

Design/methodology/approach

A qualitative research method was used. Data was collected from 13 stakeholders in the built environment. Percentages and thematic analysis were used to analyse data from the interviews.

Findings

The study reveals that stakeholders are encountering operational and financial challenges: Increased price of materials, labour and material shortage and project delays were key operational challenges. The financial challenges were related to increased construction cost, reduced profit and payment delays. To address these challenges, the study developed managerial, contractual and governmental strategies: Market survey and bulk purchase, remote working and adherence to Covid-19 protocols were among the key managerial strategies. For the contractual strategies: contracts reviews, smart contracts, working overtime and night shift were developed, while governmental strategies included provision of funds, loans and incentives for workers.

Originality/value

The study deduced that while environmental sustainability was employed to address the Covid-19 challenges, the economic and social aspects were found to be under-utilized. Therefore, the study concluded that a holistic application of environmental, economic and social sustainability themes while incorporating managerial, contractual and governmental strategies is significant for achieving sustainable project performance in the post-Covid era in Nigeria.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

1 – 10 of 959