Search results

1 – 10 of over 1000
Article
Publication date: 31 July 2023

Mohammad A. Hassanain, Abdullah Ehtesham Akbar, Muizz O. Sanni-Anibire and Adel Alshibani

This paper aims to present an assessment of the challenges of using building information modeling (BIM) in the facilities management (FM) practice in Saudi Arabia.

Abstract

Purpose

This paper aims to present an assessment of the challenges of using building information modeling (BIM) in the facilities management (FM) practice in Saudi Arabia.

Design/methodology/approach

A review of the relevant literature was conducted, resulting in identifying 31 potential challenges to BIM utilization in FM, which were grouped into five main categories. These challenges were used to design a five-point Likert scale questionnaire survey to obtain the feedback of experts in the FM domain in Saudi Arabia. The professionals that participated in the survey consisted of facilities managers, maintenance managers and BIM experts. The results obtained were analyzed based on the Effect Index (EI) approach. The questionnaire also contained an open-ended section for more qualitative data.

Findings

The results of the EI revealed that the top most influential challenges include “integration of the building systems design with BIM”, “definition of handover requirements and integration requirements between FM and BIM” and “getting appropriate and accurate information”. The category with the highest EI was the “challenges pertaining to the execution of BIM in FM”.

Practical implications

The paper outlines the critical challenges influencing the utilization of BIM in FM in Saudi Arabia and, as a result, could facilitate the development of implementation plans for BIM utilization. Thus, the study results have practical implications for stakeholders in the building industry.

Originality/value

The study contributes to the building industry through its discussion of the challenges of BIM utilization in FM and thus has the potential to increase the level of awareness of stakeholders in the industry.

Details

Facilities , vol. 41 no. 13/14
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 20 March 2024

Ki-Hyun Um

This study aims to (1) validate the efficacy of contractual and relational governance in enhancing operational performance and (2) explore the influence of product complexity on…

Abstract

Purpose

This study aims to (1) validate the efficacy of contractual and relational governance in enhancing operational performance and (2) explore the influence of product complexity on the effectiveness of these governance mechanisms, thereby determining the optimal approach for varying levels of product complexity.

Design/methodology/approach

By utilizing a comprehensive theoretical framework encompassing transaction cost economics, social exchange theory and contingency theory, this research explores the intricate interplay between governance mechanisms, product complexity and operational performance, drawing insights from a dataset comprising 246 responses within Mainland China’s manufacturing sector. To rigorously test the proposed hypotheses, this study employed a hierarchical regression analysis.

Findings

The findings of this study are summarized as follows: (1) while both contractual governance and relational governance have a significant impact on operational performance, relational governance is found to be more effective than contractual governance in enhancing operational performance; and (2) the moderation effect of product complexity is evident, as it weakens the impact of contractual governance while simultaneously enhancing the positive influence of relational governance on operational performance.

Originality/value

The study uncovers a moderation effect of product complexity on the relationship between governance mechanisms and operational performance. This finding adds an original contribution to the literature by highlighting how product complexity can interact with governance strategies, providing practical insights for industries dealing with varying levels of product complexity.

Details

Journal of Manufacturing Technology Management, vol. 35 no. 3
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 27 January 2023

Farooq Ali and Harri Haapasalo

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by…

3216

Abstract

Purpose

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by developing a conceptual framework. From this, the authors aim to describe the links among these concepts in terms of development levels of stakeholder relationships. In addition, the authors aim to identify challenges and preconditions in relation to developing relationships at different levels.

Design/methodology/approach

The authors have adopted the directed approach of qualitative content analysis method to validate and extend the conceptual framework of this study. The context of this study is a large hospital construction project located in northern Finland.

Findings

The findings of this study suggest that collaboration is a multilevel process of active engagement of multiple stakeholders. These stakeholders must have a high degree of shared understanding in terms of cooperation, control and coordination to achieve the mutually desired outcomes. This study also identifies the challenges that project stakeholders could face in developing collaborative relationships and propose preconditions for the same.

Practical implications

This study provides a better understanding for project managers to manage interorganisational collaborative construction projects successfully. The outcome of this research would be beneficial to project management team to deliver dispute-free construction projects.

Originality/value

Existing practical research on the development of relationships at different levels in collaborative construction projects is limited. This study offers a framework for the same which is validated in a real-life project.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 30 May 2023

Sharifah Nur Aina Syed Alwee, Umi Kalsum Zolkafli and Hafez Salleh

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in…

Abstract

Purpose

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project.

Design/methodology/approach

The exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings.

Findings

Findings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements.

Practical implications

The study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation.

Originality/value

This paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.

Details

Facilities , vol. 41 no. 11/12
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 14 August 2023

Murali Jagannathan and Venkata Santosh Kumar Delhi

Judiciary plays a pivotal role in the overall development of a nation's economy and its involvement assures process transparency and impartiality. However, litigation is often…

Abstract

Purpose

Judiciary plays a pivotal role in the overall development of a nation's economy and its involvement assures process transparency and impartiality. However, litigation is often expensive, uncertain and prone to delays. Notwithstanding such inherent challenges associated with litigation, it is observed that parties in construction disputes do resort to litigation. This study attempts to understand the potential paths triggering litigation of contractual disputes in construction. While extant researchers have identified focus areas or factors influencing litigation, the underlying paths connecting these focus areas, leading parties to litigation, is explored in this study.

Design/methodology/approach

Considering the framework of Rachlinski's “framing theory of litigation” and the mixed-methods approach (qualitative and quantitative approaches), this study proposes and validates a model that identifies the paths to litigation of contractual disputes in construction.

Findings

The results of in-depth interviews, followed by validation through structural equation modelling (SEM), reveal four critical paths, namely positional focus (PF) – contract and dispute characteristics (CDC) – decision to litigate (DTL), milieu influence (MI) – CDC – DTL, MI-PF-DTL and CDC-DTL.

Practical implications

The identified paths highlight the areas policymakers can consider while developing policy interventions to mitigate litigation.

Originality/value

Researchers have identified factors causing litigation in construction. However, attempts to examine the existence of multi-factor “paths” on the decision to litigate (DTL) have hitherto received a muted response, so this study focuses on identifying the project-level path(s) leading to the litigation of contractual disputes in construction.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 4 August 2022

Christopher Amoah and Hlatshwayo Nkosazana

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study…

4853

Abstract

Purpose

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.

Design/methodology/approach

A quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.

Findings

The findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.

Research limitations/implications

Even though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.

Practical implications

To effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.

Originality/value

The study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 18 August 2022

Gulden Gumusburun Ayalp and Tülay Çivici

The construction industry is a crucial industry for national development worldwide. Because the construction industry is tied to national and international economic activities…

Abstract

Purpose

The construction industry is a crucial industry for national development worldwide. Because the construction industry is tied to national and international economic activities, the COVID-19 outbreak has limited construction projects. Therefore, this study investigates the most influential factors regarding COVID-19 and their effects on the construction industry.

Design/methodology/approach

The potential impacts of COVID-19 on the construction industry were identified through a realistic literature review and interviews with professionals. A questionnaire was distributed via e-mail to architects, civil engineers and contractors who play vital roles during the construction processes. The data were analysed using SPSS 22 and LISREL 8.7 software to quantify the most influential pandemic-related factors faced by the construction industry.

Findings

Ten influential pandemic factors affecting the construction industry in Turkey were identified. Among them, “increased costs and price escalations due to shortage of raw materials and supply chain disruption” and “challenges with payment and cash flows” were determined as the most influential pandemic factors.

Research limitations/implications

This research aims to advance comprehension of pandemic impacts and contributes an incipient assessment framework based on 10 determined pandemic factors. Therefore, contractors, architects and civil engineers may analyse their weaknesses and organise precise priorities so that their firms may remain competitive, thus minimising the adverse impact of COVID-19 and possible forthcoming waves.

Originality/value

Few studies have identified the effect of pandemics on the construction industry qualitatively, forcing management to make projections to the current situation. Moreover, no study has provided insights into the influential factors of pandemics using quantitative methods. Therefore, this study comprehensively and quantitatively determines the relevant COVID-19 pandemic factors using exploratory factor analysis (EFA) and utilises confirmatory factor analysis (CFA) and structural equation modelling to present a structural model of how pandemic factors affect the Turkish construction industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2024

Nodirbek Bakhromzhon Ugli Anvarjonov, Ki-Hyun Um, DeYu Zhong and Eun-Kyu Shine

The principal research objective entails examining the nexus between green supplier selection and green performance while scrutinizing the moderating role of governance…

Abstract

Purpose

The principal research objective entails examining the nexus between green supplier selection and green performance while scrutinizing the moderating role of governance mechanisms, specifically process control and outcome control, in shaping this association.

Design/methodology/approach

To assess our hypotheses, this study obtained data from Chinese manufacturing sectors and utilized regression analysis on a dataset consisting of 295 samples.

Findings

This study enriches the sustainable supply chain management literature by emphasizing the influence of green supplier selection on a firm’s green performance and the moderating effects of outcome and process control, offering practical insights for industry professionals.

Originality/value

This study enriches the sustainable supply chain management literature by emphasizing the influence of supplier selection on a firm’s environmental performance and the moderating effects of outcome and process control, offering practical insights for industry professionals.

Details

Journal of Manufacturing Technology Management, vol. 35 no. 3
Type: Research Article
ISSN: 1741-038X

Keywords

Expert briefing
Publication date: 15 May 2023

Russia's share of Austrian gas imports was cut sharply in the wake of the February 2022 invasion of Ukraine but has now returned to pre-war levels. Austria’s ability to accelerate…

Open Access
Article
Publication date: 5 December 2023

Jacopo Ballerini, Daniele Giordino, Luboš Smrčka and Francesca Culasso

Food and beverage (F&B) small and medium-sized enterprises (SMEs) must diversify their markets and obtain predictable sources of revenues to withstand difficult and volatile…

Abstract

Purpose

Food and beverage (F&B) small and medium-sized enterprises (SMEs) must diversify their markets and obtain predictable sources of revenues to withstand difficult and volatile periods such as the post-pandemic geopolitical scenario, recently burdened by the Russian-Ukrainian conflict. On the other hand, another strand of the literature suggests that public procurement could be considered a great source of income, enabling solid contracts, revenues and cash-flow stability. Therefore, this paper aims to explore the role of public procurement, the adoption of e-commerce platforms and their interactions in affecting the exporting performances of SMEs operating in the F&B sector.

Design/methodology/approach

The study retrieves data from 2,186 Italian F&B manufacturing SMEs relying on Margò by Cribis database. Therefore, it conducts a structured equational model (SEM) to test the developed hypotheses empirically.

Findings

The findings reveal that digital selling platforms positively affect exports, whereas public procurement negatively affects F&B SMEs exports. Nonetheless, findings underline that the interaction between public procurement and the adoption of digital selling platforms dampens public procurement's negative effects on exports.

Originality/value

This study brings an original contribution to the F&B literature by conducting empirical research on an extensive sample of firms from one of the most influential countries in the F&B vertical, Italy, with officially registered data. More importantly, to the best of the authors' knowledge, this study pioneers the investigation of the relationship between public procurement and e-commerce platforms in affecting F&B SMEs' export performances.

Details

European Journal of Innovation Management, vol. 26 no. 7
Type: Research Article
ISSN: 1460-1060

Keywords

1 – 10 of over 1000