Search results

1 – 10 of 10
Content available
Article
Publication date: 24 February 2012

Ronald McCaffer

306

Abstract

Details

Engineering, Construction and Architectural Management, vol. 19 no. 2
Type: Research Article
ISSN: 0969-9988

Content available
Article
Publication date: 21 November 2016

Timo Hartmann

411

Abstract

Details

Engineering, Construction and Architectural Management, vol. 23 no. 6
Type: Research Article
ISSN: 0969-9988

Content available
Article
Publication date: 28 June 2013

Ronald McCaffer

48

Abstract

Details

Engineering, Construction and Architectural Management, vol. 20 no. 4
Type: Research Article
ISSN: 0969-9988

Open Access
Article
Publication date: 7 August 2017

Per Erik Eriksson

The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.

12327

Abstract

Purpose

The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.

Design/methodology/approach

This paper is based on a literature review of organizational research and construction management literature together with a brief interview study of Swedish clients and contractors.

Findings

The theoretical and empirical findings propose that small and simple projects with low uncertainty and scarce resources may focus on exploitation to enhance short-term efficiency through traditional procurement strategies including delivery systems that separate the actors and their activities (i.e. pure design-build- or design-bid-build-contracts), fixed price payment and price focus in bid evaluation. Large complex projects with high uncertainty and customization benefit from combining exploration and exploitation to enhance sustainable performance. This requires collaborative procurement strategies including joint specification through early contractor involvement, cost reimbursement coupled with incentive-based payment, bid evaluation based on multiple criteria and collaborative tools and activities in partnering arrangements.

Research limitations/implications

This paper contributes to organizational learning literature by pinpointing the need for integrating procurement strategies that enhance combination of exploration and exploitation. The main contribution to the construction management literature involves the investigation of how procurement strategies may affect exploration and exploitation, as identified and articulated in the propositions developed in this paper.

Practical implications

From a practical perspective, the findings highlight the importance of tailoring procurement strategies to project characteristics to enhance a suitable balance between exploration and exploitation in construction projects.

Originality/value

The explicit focus on the operational project-level is uncommon but relevant in organizational learning literature.

Details

Journal of Financial Management of Property and Construction, vol. 22 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Open Access
Article
Publication date: 4 August 2023

Hezekiah Farayola Olaniran and Bolatito Folasade Akinbile

Despite the contributions of both the oil and gas and construction industries to the gross domestic product (GDP) of the country, both industries are still marred by incessant…

1190

Abstract

Purpose

Despite the contributions of both the oil and gas and construction industries to the gross domestic product (GDP) of the country, both industries are still marred by incessant accidents. Therefore, the aim of this study is to compare the health and safety practises of the construction and oil and gas industries in Nigeria in order to suggest the best approach to health and safety practices.

Design/methodology/approach

A survey questionnaire was developed and administered to professionals working in the construction and oil and gas industries. Data were analysed using the relative importance index (RII). An independent sample t-test was also conducted to determine whether there was a significant difference in the construction and oil and gas industries.

Findings

The study revealed that the rate at which health and safety are practised in the oil and gas industry is comparatively high compared to how they are practised in the construction industry. Proper site layout and planning, provision of a safe working environment, proper health and safety risk assessment were more predominantly practised in the oil and gas industry, while proper site layout and planning, disallowing unauthorised entry into site and the provision of a safe working environment were predominantly practised in the construction industry.

Originality/value

This study is the first to compare the health and safety practises of the construction and oil and gas industries in Nigeria. This study was significant because it would provide insight into construction and oil and gas managers, as well as other decision-makers in both industries, on how to improve health and safety practices.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 4
Type: Research Article
ISSN: 2634-2499

Keywords

Content available
Article
Publication date: 29 July 2014

Akintola Peadar Gary Akintoye Davis Holt

91

Abstract

Details

Journal of Financial Management of Property and Construction, vol. 19 no. 2
Type: Research Article
ISSN: 1366-4387

Open Access
Article
Publication date: 5 December 2019

Timo Gossler, Ioanna Falagara Sigala, Tina Wakolbinger and Renate Buber

The purpose of this paper is to determine best practices of aid agencies for outsourcing logistics to commercial logistics service providers (LSPs) in disaster relief. Moreover…

6252

Abstract

Purpose

The purpose of this paper is to determine best practices of aid agencies for outsourcing logistics to commercial logistics service providers (LSPs) in disaster relief. Moreover, it evaluates the application of the Delphi method for research in humanitarian logistics.

Design/methodology/approach

The paper is based on a two-round Delphi study with 31 experts from aid agencies and a complementary full-day focus group with 12 experts from aid agencies and LSPs.

Findings

The study revealed 12 best practices for outsourcing logistics in disaster relief and a compilation of more than 100 activities for putting these practices into action. Experts consider a proper balance between efficiency and compliance, a detailed contract and a detailed service request most important. Additionally, the Delphi method was found to be a promising technique for research on humanitarian logistics.

Research limitations/implications

By critically examining the Delphi method, this study establishes the basis for a wider application of the technique in the field of humanitarian logistics. Furthermore, it can help to prioritize future research as the ranking of practices reflects the priorities of practitioners.

Practical implications

The paper provides guidance to practitioners at aid agencies in charge of outsourcing logistics.

Originality/value

This research is one of the first in the field of humanitarian logistics to apply the Delphi method. Moreover, it addresses the lack of literature dealing with approaches for building successful cross-sectoral partnerships.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 9 no. 3
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 22 February 2022

AbdulLateef Olanrewaju and Hui Jing Alice Lee

Poor quality in building projects is high and increasing. Poor quality can increase the cost of a building by up to more than 50% and can delay a project by up to 50%. This…

6720

Abstract

Purpose

Poor quality in building projects is high and increasing. Poor quality can increase the cost of a building by up to more than 50% and can delay a project by up to 50%. This research investigated the poor quality of building elements/components.

Design/methodology/approach

The site operatives were requested to rate the frequency of poor quality in 25 building elements/components. The frequencies of the poor quality were scored on a five-point Likert scale, ranging from least often to extremely often. The survey forms were administered to construction site operatives by hand delivery.

Findings

The data revealed that poor quality occurred in more than 80% of the building projects completed. Approximately 40% of the cost of a building project is attributed to poor quality. In total, 70% of the respondents measured the poor quality of building elements as being high and frequent. The size and frequency of poor quality are higher in concrete, plaster, brick, foundations and roof trusses.

Practical implications

The research findings would help to reduce claims, disputes, maintenance costs and waste on sites.

Originality/value

This research provides fresh information on poor quality in building projects and provides a systemic process for anticipating poor quality in building projects. The findings also provide an option to increase maintenance span and a means to reduce claims and disputes in the construction sector.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 30 May 2022

John Bruen, John P. Spillane, Jim Bradley and Tara Brooks

This study aims to uncover managerial representations of achieving competitive advantage in architectural practices operating within the United Kingdom (UK).

1333

Abstract

Purpose

This study aims to uncover managerial representations of achieving competitive advantage in architectural practices operating within the United Kingdom (UK).

Design/methodology/approach

A sequential qualitative methodology is applied, underpinned by nine managerial interviews in five architectural practices, which are analysed using computer-assisted qualitative data analysis software.

Findings

In all, 108 representations are identified, with highly rated concepts including reputation, client satisfaction, fees and staff resources discussed in detail. The need for architectural practices to develop a competitive advantage within their sector is increasingly apparent, particularly during times of market turbulence. A total of 20 themes identified are clustered into four main groups focused on People (including Calibre of Staff, Attract Graduates; Qualified Staff); Product (including Emphasis on design, Specialisation, Competitive Fees): Process (including Low Overheads, Office Efficiency) and Potential (Reputation, Ability to Undertake Large Projects, Repeat clients, Ability to expand, Parent Company, Market Understanding and New Offices).

Originality/value

Despite numerous studies conducted on this subject, there has been no research to date documenting managerial representation on achieving competitive advantage in the context of architectural practices in the UK. This paper closes this gap in knowledge by contributing to underlying research on competitive advantage, focusing on the managerial representations within UK architectural practices.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. 17 no. 2
Type: Research Article
ISSN: 2631-6862

Keywords

1 – 10 of 10