Search results

1 – 10 of over 2000
Open Access
Book part
Publication date: 1 May 2019

Sondre Evjen, Gustav Gunnerud, Ola Lædre, Rune Søfting and Jardar Lohne

Reports from the Norwegian police indicate that actors in the architecture, engineering and construction industry face severe competition from criminal actors. Sub-contractors

Abstract

Purpose

Reports from the Norwegian police indicate that actors in the architecture, engineering and construction industry face severe competition from criminal actors. Sub-contractors working within the law struggle to be competitive compared to dubious sub-contractors. This study aims to examine (1) what the sub-contractors’ perceptions of current contracting practices are, (2) what problems they face and (3) what countermeasures can be used to improve the situation.

Design/Methodology/Approach

The research was carried out on the basis of a qualitative approach. A literature review and a document study of reports from the sub-contractors, public agencies and other relevant organisations were conducted. In addition, in-depth interviews were conducted with the management of eight sub-contractors in the Norwegian architecture, engineering and construction industry.

Findings

There is a significant difference in the perception of the reality between contractors’ management and the blue-collar workers. Management among the contractors maintain that their control systems work; however, the result from this study shows that it is easy for the sub-contractors to take advantage of loopholes or avoid the countermeasures.

Research Limitations/Implications

This paper is limited to Norway and use only the paint industry as a case study.

Practical Implications

This study shows that sub-contractors constitute an important source of information in the effort to prevent dubious sub-contractors as they are the actors who experience the greatest pressure and competition from them. Therefore, contractors should include the sub-contractors in the process of developing measures to prevent this misconduct.

Originality/Value

A very little research has been carried out within this field of study in Norway.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Content available
Article
Publication date: 4 October 2018

Denis S. Clayson, Alfred E. Thal, Jr and Edward D. White III

The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the…

1008

Abstract

Purpose

The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the literature. CPI is defined as the earned value of work performed divided by the actual cost of the work, and CPI stability represents the point in time in a project after which the CPI varies by less than 20 percent (measured in different ways).

Design/methodology/approach

After collecting monthly earned value management (EVM) data for 136 environmental remediation projects from a United States federal agency in fiscal years 2012 and 2013, the authors used the nonparametric Wilcoxon signed-rank test to analyze CPI stability. The authors also used nonparametric statistical comparisons to identify any significant relationships between CPI stability and independent variables representing project and contract characteristics.

Findings

The CPI for environmental projects did not stabilize until the projects were 41 percent complete with respect to project duration. The most significant factors contributing to CPI stability were categorized into the following managerial insights: contractor qualifications, communication, stakeholder engagement, contracting strategy, competition, EVM factors, and macro project factors.

Originality/value

As CPI stability for environmental remediation projects has not been reported in the literature, this research provides new insights to help project managers understand when the CPIs of environmental remediation projects stabilize and which factors have the most impact on CPI stability.

Details

Journal of Defense Analytics and Logistics, vol. 2 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Open Access
Article
Publication date: 25 January 2024

Joseph Kuruneri and Wiston Zivanai

Governments worldwide seek to optimize value in public project bids. Social procurement (SP) has become a global tool for achieving project goals. The purpose of this study is to…

Abstract

Purpose

Governments worldwide seek to optimize value in public project bids. Social procurement (SP) has become a global tool for achieving project goals. The purpose of this study is to assess the understanding of SP among contractors and identify its drivers to optimize the value associated with public projects.

Design/methodology/approach

A total of 15 major contractors were interviewed to obtain their views on SP, appreciate their current practices and identify the main drivers of SP in projects. A semistructured interview was used to gather relevant data. Neo-institutional theory is the lens of the study used to provide the focus of the research. The collected data were analyzed using the thematic data analysis technique.

Findings

The study found that SP is understood as corporate social responsibility and is not handled in a structured manner guided by policies or clearly defined procedures. Additionally, research has shown that compliance requirements, rather than value and goodwill, are the main inspiration for SP practices.

Research limitations/implications

The study’s limitation is the fact that it was conducted in the context of Botswana and only used the interview technique as the solo data collection method. The other limitation is the lack of empirical literature on SP concerning the lack of SP policy in Botswana.

Originality/value

This study raises awareness of the concept of SP among contractors in Botswana and eases its implementation within the industry.

Details

Modern Supply Chain Research and Applications, vol. 6 no. 1
Type: Research Article
ISSN: 2631-3871

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 12 September 2022

Na Zhang and Ke Bin Lu

This research studies the behavior choice of key actors in the construction supply chain and constructs a model which includes the benefit function of the government, contractors

Abstract

Purpose

This research studies the behavior choice of key actors in the construction supply chain and constructs a model which includes the benefit function of the government, contractors and owners, aiming at improving the coverage of green buildings.

Design/methodology/approach

In this paper, tripartite dynamic game is studied and simulated based on duplicate dynamic equation. The tripartite game under government intervention is rarely considered, and government punishment measures are seldom introduced into the research.

Findings

According to the simulation results, the practical insights in line with the development of green supply chain are put forward. Rewards and punishments affect the development of the supply chain. New technologies and new materials accelerate the development of green supply chain and then improve the coverage of green buildings.

Research limitations/implications

This paper constructs a dynamic model based on complete information rationality, which is difficult to realize in practice, for information is incomplete and human rationality is limited.

Originality/value

In fact, the government has not issued a punishment document to introduce a new variable adjustment model.

Details

Modern Supply Chain Research and Applications, vol. 4 no. 3
Type: Research Article
ISSN: 2631-3871

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2033

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 21 May 2018

Zul-Atfi Bin Ismail

A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites…

1890

Abstract

Purpose

A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites. Contractor social networking is particularly problematic on industrialised building system (IBS) infrastructure maintenance projects where contractor’s certified quality product and firms are not matched with maintenance specialisation services. The paper aims to discuss this issue.

Design/methodology/approach

This paper reports on the early stages of research which is developing a new information and communications technology (ICT)-based approach to managing contractor social networking on IBS infrastructure maintenance schemes. As a precursor to this work, the paper reviews current contractor social networking websites practices on IBS infrastructure maintenance projects and explores the ICT tools and techniques currently being employed on such projects.

Findings

The findings reveal the need for more sophisticated contractor social networking websites solutions which accord with the needs of IBS infrastructure maintenance schemes.

Originality/value

The paper concludes by presenting a research framework for developing such a system in the future.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 20 April 2020

Sinikka Lepistö, Justyna Dobroszek, Lauri Lepistö and Ewelina Zarzycka

This paper aims to explore controls within an inter-organisational relationship involving outsourced management accounting services from the contractor’s perspective.

3035

Abstract

Purpose

This paper aims to explore controls within an inter-organisational relationship involving outsourced management accounting services from the contractor’s perspective.

Design/methodology/approach

Qualitative data from within the relationship are analysed in a legitimacy-theory framework, illustrating how controls within the relationship are intended to build the contractor’s legitimacy and what kinds of implications the controls have in relation to conflicts between interests inherent in the relationship.

Findings

The legitimacy perspective clarifies that while controls are aimed at ensuring efficiency for the client, they may also provide symbolic displays of the appropriateness of the contractor’s actions both at an inter-organisational level for the client and at an individual level for the contractor’s employees. While the contractor intends to build legitimacy with the client by demonstrating utility in the form of efficiency, the process also gives the client influence and allows the disposition in terms of shared values to be demonstrated. However, this process has some negative consequences for the contractor’s employees as it is insufficient for serving the boundary-spanning employees’ interests connected with the nature of their work. Hence, the same controls need to yield benefits and fair outcomes for employees. The controls simultaneously foster interconnections that contribute to permanence and formalise the outsourcing of complex services, thereby rendering such processes comprehensible and transferable to other settings, which can be seen to serve the contractor’s continuity interests.

Originality/value

The paper contributes to academic research by illustrating how controls within inter-organisational relationships not only steer boundary-spanners’ work to conform to a client’s needs but may also help to build legitimacy via symbolic properties in the presence of conflicting interests at both an inter-organisational and individual level. It specifically highlights the important role of boundary-spanners lower in the organisational structure, who both affect and are influenced by the intentions to build legitimacy with the client.

Details

Qualitative Research in Accounting & Management, vol. 17 no. 3
Type: Research Article
ISSN: 1176-6093

Keywords

Open Access
Article
Publication date: 3 February 2020

Paulos A. Wondimu, Ole Jonny Klakegg and Ola Lædre

Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must…

9325

Abstract

Purpose

Early contractor involvement (ECI) faces many barriers because it differs from traditional business practices. Public owners, especially, face a major challenge because they must comply with international and national legislation. The purpose of this paper is to develop a framework that illustrates the various approaches that public project owners can take to implement ECI.

Design/methodology/approach

In addition to a literature review, three groups of case studies were carried out. The case studies were based on 54 semi-structured in-depth interviews with key personnel from 21 Norwegian public projects and document study.

Findings

In all, 25 approaches to ECI were identified during the research. Twelve of these were used in the cases studied.

Social implications

There are several approaches to ECI that are suitable for public owners. However, the contractor’s contribution depends on which approach is implemented and how it is implemented.

Originality/value

As original contribution, this study presents a novel framework that defines options for implementing ECI in public projects. Furthermore, this paper provides insights on how ECI can be implemented in public projects based on Norwegian experiences. Although the empirical data of the study is limited to Norwegian public projects, this study contributes to knowledge about how to implement ECI internationally.

Details

Journal of Public Procurement, vol. 20 no. 1
Type: Research Article
ISSN: 1535-0118

Keywords

1 – 10 of over 2000