Search results

1 – 10 of 15
Article
Publication date: 23 November 2022

Suhair Alkilani and Martin Loosemore

This research uses contingency theory and Venkatraman’s concept of moderating fit to explore how key project stakeholders (clients, consultants and suppliers) influence project…

Abstract

Purpose

This research uses contingency theory and Venkatraman’s concept of moderating fit to explore how key project stakeholders (clients, consultants and suppliers) influence project performance from the perspective of small and medium contractors in the Jordanian construction industry.

Design/methodology/approach

An anonymous structured survey was performed comprising 200 key informants including senior project managers, construction managers, engineers and general managers working for small- and medium-sized contractors in the Jordanian construction industry. The Partial Least Squares Structural Equation Modelling (PLS-SEM) was used to analyse the data.

Findings

The results of this study show that consultant-related factors (quality of documentation produced, ability to communicate and technical competencies) are perceived to have the most significant direct effect on project performance, followed by client-related factors (payment promptness, decision certainty and documentation control) and supplier-related factors (supplier performance, defects control and logistics management).

Originality/value

The results contribute new theoretical, empirical and practical insights to existing construction project performance research by highlighting the key performance factors which need to be managed for each stakeholder group to ensure effective project performance from a small- and medium-sized contractor perspective.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 23 November 2022

Andrew Ebekozien and Mohamad Shaharudin Samsurijan

Studies showed that digital technology applications in the construction industry are low, especially in many developing nations. Construction incentivisation (CI) is one of the…

Abstract

Purpose

Studies showed that digital technology applications in the construction industry are low, especially in many developing nations. Construction incentivisation (CI) is one of the long-standing principles adopted to enhance project performance. There is a paucity of studies concerning CI to improve digital technology applications. Thus, this research investigated the relevance and perceived hindrances that may hinder the implementation of CI from promoting digital technologies and proffer ways to improve digital technology applications in the construction sector.

Design/methodology/approach

In Nigeria’s context, this research is exploratory. Twenty-four semi-structured virtual interviews were conducted in Lagos and Abuja, Nigeria, with knowledgeable participants that indicated interest and were interviewed. The engaged interviewees were drawn from government agencies, academicians in construction consultancy, Internet and communication technology experts, construction contracting firms and construction consulting firms. The collected data were coded and analysed through a thematic method.

Findings

Digitalisation of the industry via CI may face some hindrances. The perceived issues that may hinder CI implementation were classified into most severe, severe and fairly severe in Nigeria’s construction industry context. Findings proffer feasible policy solutions that can mitigate these issues and improve digital technology applications in the industry via the CI.

Research limitations/implications

This study covered the relevance and perceived issues that may hinder the implementation of the CI to improve digital technology applications in the industry. Also, the study proffers policy solutions to enhance digital technology applications in the industry via the CI concept.

Practical implications

Findings from this research will support and offer a valuable understanding of the relevance of the “incentivisation concept” to improve digital technology applications in the Nigerian-built environment. Other developing countries with low applications of digital technology in construction may consider the suggested policy solutions from this research. Also, this study will stir policymakers and construction practitioners to support policies tailored towards improving digital technology applications in construction.

Originality/value

This research contributes by exploring the effectiveness of the CI concept and informing construction practitioners and policymakers on how to improve digital technology applications in the Nigerian construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 January 2022

Guus Keusters, Hans Bakker and Erik-Jan Houwing

Civil engineering projects around the world have been underperforming for a long time. While the complexity of these projects will continue to increase, there is an urgent need to…

Abstract

Purpose

Civil engineering projects around the world have been underperforming for a long time. While the complexity of these projects will continue to increase, there is an urgent need to perform better. Although the integrated design process is critical for project success, the literature lacks studies describing the link to project performance. Therefore, this study aims to investigate the dominant variables that affect the integrated design process and consequently project performance.

Design/methodology/approach

A multiple case study was conducted to determine the dominant variables that affect the integrated design process and project performance. The research included four projects. Semi-structured interviews were the main source of data.

Findings

The cases indicated that the extent to which an integrated approach is achieved in the design process is essential for project performance. This applies to the integration of stakeholders’ interests as well as the integration of disciplines. Above all, it was concluded that the project team participants’ competencies for integration are a dominant factor for project performance, as the integrated design process has changed from a technical challenge to an integrative one.

Originality/value

This study provides insights into the dominant variable of the integrated design process that affects project performance, which is underexposed in the literature. The study results reveal the importance of competencies related to integration and adoption of the design problem context, which are not yet included in civil engineering design methods. In this respect, empathy is introduced as a new and critical competence for the civil engineering industry, which needs further research.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 October 2022

Yunis Ali Ahmed, Hafiz Muhammad Faisal Shehzad, Muhammad Mahboob Khurshid, Omayma Husain Abbas Hassan, Samah Abdelsalam Abdalla and Nashat Alrefai

Building information modelling (BIM) has transformed the traditional practices of the Architecture, Engineering and Construction (AEC) industry. BIM creates a collaborative…

Abstract

Purpose

Building information modelling (BIM) has transformed the traditional practices of the Architecture, Engineering and Construction (AEC) industry. BIM creates a collaborative digital representation of built environment data. Competitive advantage can be achieved with collaborative project delivery and rich information modelling. Despite the abundant benefits, BIM’s adoption in the AEC is susceptible to confrontation. A substantial impediment to BIM adoption often cited is data interoperability. Other facets of interoperability got limited attention. Other academic areas, including information systems, discuss the interoperability construct ahead of data interoperability. These interoperability factors have yet to be surveyed in the AEC industry. This study aims to investigate the effect of interoperability factors on BIM adoption and develop a comprehensive BIM adoption model.

Design/methodology/approach

The theoretical foundations of the proposed model are based on the European interoperability framework (EIF) and technology, organization, environment framework (TOE). Quantitative data collection from construction firms is gathered. The model has been thoroughly examined and validated using partial least squares structural equation modelling in SmartPLS software.

Findings

The study’s findings indicate that relative advantage, top management support, government support, organizational readiness and regulation support are determinants of BIM adoption. Financial constraints, complexity, lack of technical interoperability, semantic interoperability, organizational interoperability and uncertainty are barriers to BIM adoption. However, compatibility, competitive pressure and legal interoperability do not affect BIM adoption.

Practical implications

Finally, this study provides recommendations containing the essential technological, organizational, environmental and interoperability factors that AEC stakeholders can address to enhance BIM adoption.

Originality/value

To the best of the authors’ knowledge, this paper is one of the first studies to combine TOE and EIF in a single research model. This research provides empirical evidence for using the proposed model as a guide to promoting BIM adoption. As a result, the highlighted determinants can assist organizations in developing and executing successful policies that support BIM adoption in the AEC industry.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 November 2022

Zhijia You

The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a…

Abstract

Purpose

The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a systematic perspective. The purpose of this paper is to fill this gap.

Design/methodology/approach

This research adopts a deductive research approach.

Findings

This research proposes a reference architecture and related business scenario framework for intelligent construction based on the existing theory and industrial practice.

Originality/value

The main contribution of this research is to provide a useful reference to the Chinese government and industry for formulating digital transformation strategies, as well as suggests meaningful future research directions in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 11 August 2022

Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on…

2051

Abstract

Purpose

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on personal preferences and the evaluation of direct costs. Researchers and practitioners have debated appropriate measurement systems for evaluating the impacts of prefabricated products and for comparing them with conventional on-site construction practices. The more advanced, cost–benefit approach to evaluating prefabricated products often inspires controversy because it may generate inaccurate results when converting non-monetary effects into costs. As prefabrication may affect multiple organisations and product subsystems, the method used to decide on production methods should consider multiple direct and indirect impacts, including nonmonetary ones. Thus, this study aims to develop a multi-criteria method to evaluate both the monetary and non-monetary impacts of prefabrication solutions to facilitate decision-making on whether to use prefabricated products.

Design/methodology/approach

Drawing upon a literature review, this research suggests a multi-criteria method that combines the choosing-by-advantage approach with a cost–benefit analysis. The method was presented for validation in focus group discussions and tested in a case involving a prefabricated bathroom.

Findings

The analysis indicates that the method helps a project’s stakeholders communicate about the relative merits of prefabrication and conventional construction while facilitating the final decision of whether to use prefabrication.

Originality/value

This research contributes a method of evaluating the monetary and non-monetary impacts of prefabricated products. The research underlines the need to evaluate the diverse benefits and sacrifices that stakeholder face when considering production methods in construction.

Article
Publication date: 25 March 2024

Robert Ford and Lindsay Schakenbach Regele

This historical example of the creation of the arms industry in the Connecticut River Valley in the 1800s provides new insights into the value of government venture capital (GVC…

Abstract

Purpose

This historical example of the creation of the arms industry in the Connecticut River Valley in the 1800s provides new insights into the value of government venture capital (GVC) and government demand in creating a new industry. Since current theoretical explanations of the best uses of governmental venture capital are still under development, there is considerable need for further theory development to explain and predict the creation of an industry and especially those industries where failures in private capital supply necessitates governmental involvement in new firm creation. The purpose of this paper is to provide an in depth historical review of how the arms industry evolved spurred by GVC and government created demand.

Design/methodology/approach

This study uses abductive inference as the best way to build and test emerging theories and advancing theoretical explanations of the best uses of GVC and governmental demand to achieve socially required outcomes.

Findings

By observing this specific historical example in detail, the authors add to the understanding of value creation caused by governmental venture capital funding of existing theory. A major contribution of this paper is to advance theory based on detailed observation.

Originality/value

The relatively limited research literature and theory development on governmental venture capital funding and the critical success factors in startups are enriched by this abductive investigation of the creation of the historically important arms industry and its spillover into creating the specialized machine industry.

Details

Journal of Management History, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1751-1348

Keywords

1 – 10 of 15