Article
Publication date: 6 February 2024

Luwei Zhao, Qing’e Wang, Bon-Gang Hwang and Alice Yan Chang-Richards

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification…

Abstract

Purpose

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification (MICMAC) to investigate the influencing factors of sustainable infrastructure vulnerability (SIV).

Design/methodology/approach

(1) Literature review and case study were used to identify the possible influencing factors; (2) a semi-structured interview was conducted to identify representative factors and the interrelationships among influencing factors; (3) ISM was adopted to identify the hierarchical structure of factors; (4) MICMAC was used to analyze the driving power (DRP) and dependence power (DEP) of each factor and (5) Semi-structured interview was used to propose strategies for overcoming SIV.

Findings

Results indicate that (1) 18 representative factors related to SIV were identified; (2) the relationship between these factors was divided into a five-layer hierarchical structure. The 18 representative factors were divided into driving factors, dependent factors, linkage factors and independent factors and (3) 12 strategies were presented to address the negative effects of these factors.

Originality/value

The findings illustrate the factors influencing SIV and their hierarchical structures, which can benefit the stakeholders and practitioners of an infrastructure project by encouraging them to take effective countermeasures to deal with related SIVs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 November 2022

Suhair Alkilani and Martin Loosemore

This research uses contingency theory and Venkatraman’s concept of moderating fit to explore how key project stakeholders (clients, consultants and suppliers) influence project…

Abstract

Purpose

This research uses contingency theory and Venkatraman’s concept of moderating fit to explore how key project stakeholders (clients, consultants and suppliers) influence project performance from the perspective of small and medium contractors in the Jordanian construction industry.

Design/methodology/approach

An anonymous structured survey was performed comprising 200 key informants including senior project managers, construction managers, engineers and general managers working for small- and medium-sized contractors in the Jordanian construction industry. The Partial Least Squares Structural Equation Modelling (PLS-SEM) was used to analyse the data.

Findings

The results of this study show that consultant-related factors (quality of documentation produced, ability to communicate and technical competencies) are perceived to have the most significant direct effect on project performance, followed by client-related factors (payment promptness, decision certainty and documentation control) and supplier-related factors (supplier performance, defects control and logistics management).

Originality/value

The results contribute new theoretical, empirical and practical insights to existing construction project performance research by highlighting the key performance factors which need to be managed for each stakeholder group to ensure effective project performance from a small- and medium-sized contractor perspective.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 September 2022

Junying Liu, Zhixiu Wang, Jiansheng Tang and Jingcong Song

While there is a general belief that a defective institutional environment will lead to higher compliance risk, the current state of knowledge about how the institutional…

Abstract

Purpose

While there is a general belief that a defective institutional environment will lead to higher compliance risk, the current state of knowledge about how the institutional environment affects enterprises' compliance is equivocal. This study aims to explore how does the host country's institutional environment affect the compliance risk perception of international engineering contractors and how to mitigate this impact.

Design/methodology/approach

This study empirically tests the impact of the institutional environment from the two dimensions of the institutional environment: legal completeness reflects whether the formal regulations are clear, detailed and comprehensive and legal effectiveness reflects whether rules and policies can be implemented effectively when the proper legal codes are provided. Based on 213 questionnaire data, this study uses partial least squares structural equation model (PLS-SEM) and Smart PLS software to test the hypothesis.

Findings

This study finds a negative relationship between the host country's legal completeness (LC) or legal effectiveness (LE) and a contractor's compliance risk perception. Further, the results show potential absorptive capacity (PAC) and realized absorptive capacity (RAC) of a contractor are critical for mitigating the impact of low LC in the host country, but not when LE is low.

Practical implications

The findings will be useful for international engineering contractors to respond to the compliance risk of the host country, both in choices of overseas investment locations and compliance capacity building.

Originality/value

This study reveals the impact of the host country's institutional environment on the compliance risk perception of international contractors, and provides theoretical guidance for how to alleviate the compliance barriers brought by the host country's institutional environment to international engineering contractors.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 13 February 2024

Xiaowei Zhou, Yousong Wang and Enqin Gong

Given the increasing importance of engineering insurance, it is still unclear which specific factors can enhance the role of engineering insurance as a risk transfer tool. This…

Abstract

Purpose

Given the increasing importance of engineering insurance, it is still unclear which specific factors can enhance the role of engineering insurance as a risk transfer tool. This study aims to propose a hybrid approach to identify and analyze the key determinants influencing the consumption of engineering insurance in mainland China.

Design/methodology/approach

The empirical analysis utilizes provincial data from mainland China from 2008 to 2019. The research framework is a novel amalgamation of the generalized method of moments (GMM) model, the quantile regression (QR) technique and the random forest (RF) algorithm. This innovative hybrid approach provides a comprehensive exploration of the driving factors while also allowing for an examination across different quantiles of insurance consumption.

Findings

The study identifies several driving factors that significantly impact engineering insurance consumption. Income, financial development, inflation, price, risk aversion, market structure and the social security system have a positive and significant influence on engineering insurance consumption. However, urbanization exhibits a negative and significant effect on the consumption of engineering insurance. QR techniques reveal variations in the effects of these driving factors across different levels of engineering insurance consumption.

Originality/value

This study extends the research on insurance consumption to the domain of the engineering business, making theoretical and practical contributions. The findings enrich the knowledge of insurance consumption by identifying the driving factors specific to engineering insurance for the first time. The research framework provides a novel and useful tool for examining the determinants of insurance consumption. Furthermore, the study offers insights into the engineering insurance market and its implications for policymakers and market participants.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 8 February 2024

Suhaib Arogundade, Mohammed Dulaimi, Saheed Ajayi and Ali Saad

The decisions of contractors could impact the reduction of construction carbon footprint. These decisions are linked to the belief of contractors which equally affects how they…

Abstract

Purpose

The decisions of contractors could impact the reduction of construction carbon footprint. These decisions are linked to the belief of contractors which equally affects how they behave while delivering projects. This study aims to investigate the behavioural tendencies of contractors that could lead to carbon minimisation during the execution of construction projects.

Design/methodology/approach

An industry survey was performed amongst 41 UK construction professionals. Spearman’s correlation and factor analysis were used to analyse the data.

Findings

The result of the Spearman’s correlation gave rise to 14 contractors’ carbon reduction behaviour (CCRB) variables and their factor analysis yielded two distinct factors, namely, contractors’ consummate carbon reduction behaviour and contractors’ pragmatic carbon reduction behaviour. The findings suggest that in the UK, contractors are willing to take voluntary practical steps to decrease the carbon footprint of construction projects.

Practical implications

This finding might be unexpected to construction stakeholders, especially construction clients who may believe that infusing strict carbon reduction obligations in contracts is sufficient in nudging contractors to lessen the carbon impact of projects.

Originality/value

The study attempted to quantitatively derive CCRB, thereby extending the breadth of knowledge in the construction carbon reduction domain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 January 2024

Frank Ato Ghansah and Weisheng Lu

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the…

Abstract

Purpose

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.

Design/methodology/approach

This is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.

Findings

The study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.

Practical implications

The findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.

Originality/value

The study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 November 2022

Andrew Ebekozien and Mohamad Shaharudin Samsurijan

Studies showed that digital technology applications in the construction industry are low, especially in many developing nations. Construction incentivisation (CI) is one of the…

Abstract

Purpose

Studies showed that digital technology applications in the construction industry are low, especially in many developing nations. Construction incentivisation (CI) is one of the long-standing principles adopted to enhance project performance. There is a paucity of studies concerning CI to improve digital technology applications. Thus, this research investigated the relevance and perceived hindrances that may hinder the implementation of CI from promoting digital technologies and proffer ways to improve digital technology applications in the construction sector.

Design/methodology/approach

In Nigeria’s context, this research is exploratory. Twenty-four semi-structured virtual interviews were conducted in Lagos and Abuja, Nigeria, with knowledgeable participants that indicated interest and were interviewed. The engaged interviewees were drawn from government agencies, academicians in construction consultancy, Internet and communication technology experts, construction contracting firms and construction consulting firms. The collected data were coded and analysed through a thematic method.

Findings

Digitalisation of the industry via CI may face some hindrances. The perceived issues that may hinder CI implementation were classified into most severe, severe and fairly severe in Nigeria’s construction industry context. Findings proffer feasible policy solutions that can mitigate these issues and improve digital technology applications in the industry via the CI.

Research limitations/implications

This study covered the relevance and perceived issues that may hinder the implementation of the CI to improve digital technology applications in the industry. Also, the study proffers policy solutions to enhance digital technology applications in the industry via the CI concept.

Practical implications

Findings from this research will support and offer a valuable understanding of the relevance of the “incentivisation concept” to improve digital technology applications in the Nigerian-built environment. Other developing countries with low applications of digital technology in construction may consider the suggested policy solutions from this research. Also, this study will stir policymakers and construction practitioners to support policies tailored towards improving digital technology applications in construction.

Originality/value

This research contributes by exploring the effectiveness of the CI concept and informing construction practitioners and policymakers on how to improve digital technology applications in the Nigerian construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords