Search results

1 – 10 of over 4000
Article
Publication date: 5 August 2022

Abdul Wahab, Jun Wang, Alireza Shojaei and Junfeng Ma

Smart contracts using blockchain technology (BCT) is a tool that decentralizes authority and makes it easier to upgrade the contract administration process by providing an…

Abstract

Purpose

Smart contracts using blockchain technology (BCT) is a tool that decentralizes authority and makes it easier to upgrade the contract administration process by providing an efficient system. Current literature provides a good overview of contracts in the construction industry; however, the specific details of BCT's smart contracts applications in the three categories have not been addressed adequately: (1) information quality, (2) enhancing project schedule and progress payment time and (3) reducing conflicts among project stakeholders. Thus, this study aims to analyze smart contracts using BCT by creating a computerized contract model, specifically evaluating its impact on the three identified categories.

Design/methodology/approach

In this paper BCT-SmContract was developed through an automated program that utilizes blockchain to define the contractual agreements between different parties in a construction project. BCT-SmContract model provides a new technique to overcome the current challenges associated with factors identified in this study, i.e. (1) information quality, (2) enhancing project schedule and progress payment time and (3) reducing conflicts among project stakeholders. Afterward, the model was tested to ensure validity and reliability through a construction project.

Findings

The findings indicated that BCT-SmContract was approximately 90% faster to execute the contract and 100% accurate in reflecting the correct information about the project status, resulting in reduced conflicts.

Originality/value

This study has contributed in upgrading the traditional contracting method in construction by developing an automated smart contract model to enhance the processes and achieve higher accuracy.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Hong Zhou, Binwei Gao, Shilong Tang, Bing Li and Shuyu Wang

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly…

Abstract

Purpose

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly promote the overall performance of the project life cycle. The miss of clauses may result in a failure to match with standard contracts. If the contract, modified by the owner, omits key clauses, potential disputes may lead to contractors paying substantial compensation. Therefore, the identification of construction project contract missing clauses has heavily relied on the manual review technique, which is inefficient and highly restricted by personnel experience. The existing intelligent means only work for the contract query and storage. It is urgent to raise the level of intelligence for contract clause management. Therefore, this paper aims to propose an intelligent method to detect construction project contract missing clauses based on Natural Language Processing (NLP) and deep learning technology.

Design/methodology/approach

A complete classification scheme of contract clauses is designed based on NLP. First, construction contract texts are pre-processed and converted from unstructured natural language into structured digital vector form. Following the initial categorization, a multi-label classification of long text construction contract clauses is designed to preliminary identify whether the clause labels are missing. After the multi-label clause missing detection, the authors implement a clause similarity algorithm by creatively integrating the image detection thought, MatchPyramid model, with BERT to identify missing substantial content in the contract clauses.

Findings

1,322 construction project contracts were tested. Results showed that the accuracy of multi-label classification could reach 93%, the accuracy of similarity matching can reach 83%, and the recall rate and F1 mean of both can reach more than 0.7. The experimental results verify the feasibility of intelligently detecting contract risk through the NLP-based method to some extent.

Originality/value

NLP is adept at recognizing textual content and has shown promising results in some contract processing applications. However, the mostly used approaches of its utilization for risk detection in construction contract clauses predominantly are rule-based, which encounter challenges when handling intricate and lengthy engineering contracts. This paper introduces an NLP technique based on deep learning which reduces manual intervention and can autonomously identify and tag types of contractual deficiencies, aligning with the evolving complexities anticipated in future construction contracts. Moreover, this method achieves the recognition of extended contract clause texts. Ultimately, this approach boasts versatility; users simply need to adjust parameters such as segmentation based on language categories to detect omissions in contract clauses of diverse languages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 April 2024

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…

Abstract

Purpose

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.

Findings

The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.

Originality/value

This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 February 2024

Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…

Abstract

Purpose

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.

Design/methodology/approach

The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.

Findings

Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.

Originality/value

Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 January 2022

Guus Keusters, Hans Bakker and Erik-Jan Houwing

Civil engineering projects around the world have been underperforming for a long time. While the complexity of these projects will continue to increase, there is an urgent need to…

Abstract

Purpose

Civil engineering projects around the world have been underperforming for a long time. While the complexity of these projects will continue to increase, there is an urgent need to perform better. Although the integrated design process is critical for project success, the literature lacks studies describing the link to project performance. Therefore, this study aims to investigate the dominant variables that affect the integrated design process and consequently project performance.

Design/methodology/approach

A multiple case study was conducted to determine the dominant variables that affect the integrated design process and project performance. The research included four projects. Semi-structured interviews were the main source of data.

Findings

The cases indicated that the extent to which an integrated approach is achieved in the design process is essential for project performance. This applies to the integration of stakeholders’ interests as well as the integration of disciplines. Above all, it was concluded that the project team participants’ competencies for integration are a dominant factor for project performance, as the integrated design process has changed from a technical challenge to an integrative one.

Originality/value

This study provides insights into the dominant variable of the integrated design process that affects project performance, which is underexposed in the literature. The study results reveal the importance of competencies related to integration and adoption of the design problem context, which are not yet included in civil engineering design methods. In this respect, empathy is introduced as a new and critical competence for the civil engineering industry, which needs further research.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 7 December 2023

Nakayima Farida, Ntayi Joseph, Namagembe Sheila, Kabagambe Levi and Muhwezi Moses

This study investigates how asset specificity, relational governance and firm adaptability relate with supply chain integration (SCI), considering selected food processing firms…

Abstract

Purpose

This study investigates how asset specificity, relational governance and firm adaptability relate with supply chain integration (SCI), considering selected food processing firms (FPFs) in Uganda.

Design/methodology/approach

This study applies a quantitative research methodology. This research draws on a sample of 103 FPFs that have been selected from a population of 345 FPFs located in Kampala district. Hypothesis testing was done using Smart PLS version 3.

Findings

Asset specificity has a significant positive relationship with SCI, and firm adaptability partially mediates this relationship. Also, there is a full mediation impact of firm adaptability on the relationship between relational governance and SCI.

Research limitations/implications

This study focused on perceptual measures to get responses from managers on the level of integration with key suppliers and customers, yet firms deal with a number of suppliers and customers.

Originality/value

This study contributes to existing literature on SCI by applying the transaction cost theory. The study focuses on the influence of asset specificity, relational governance and firm adaptability on SCI in the food processing sector. Literature on relational governance in supply chain using the transaction cost theory remains scanty. Few studies have also focused on firm adaptability as a mediator in the FPS with specific focus on Uganda, yet the sector is highly faced with uncertain events. The uncertain events in the sector and in developing countries call for adaptive strategies. Additionally, this study is the first to use firm adaptability to mediate the influence of asset specificity and relational governance on SCI more so in a developing country like Uganda where the FPS is one of the most important in the economy.

Details

Modern Supply Chain Research and Applications, vol. 6 no. 1
Type: Research Article
ISSN: 2631-3871

Keywords

Article
Publication date: 13 February 2024

Cong Cao, Chengxiang Chu, Xinyi Ding and Yangyan Shi

As live streaming becomes a widely used online sales mode, previously content-centred anchors are attempting to switch to e-commerce live streaming. The purpose of this research…

Abstract

Purpose

As live streaming becomes a widely used online sales mode, previously content-centred anchors are attempting to switch to e-commerce live streaming. The purpose of this research was to explore the mechanisms that prompt consumers to stay or leave after content anchors transfer to live e-commerce broadcasts. In addition, we explored the factors affecting consumption from the perspectives of anchors, consumers and the external environment.

Design/methodology/approach

We distributed questionnaires to a group of fans who had experienced the transition of content anchors to live streaming and received back 375 valid questionnaires. Using psychological contract theory, we constructed a theoretical model for the scenario in which content anchors transition to live e-commerce broadcasting and analysed the data using partial least squares structural equation modelling (PLS-SEM).

Findings

The results show that circle culture, mainstream culture, initial trust and live streaming content all positively influenced consumers’ attitudes, whilst consumers’ past shopping experiences negatively influenced consumers’ attitudes. The personal charm of the content anchors did not have a significant effect on consumers’ attitudes. Additionally, we found that only anchors with a significant circle culture and good trust levels amongst fans were able to transition to live e-commerce streaming successfully.

Originality/value

This study extends the application of psychological contract theory to the field of e-commerce and describes the transformation of different types of psychological contracts. The paper’s conclusions provide a reference for decision-making and the implementation of transformation by content-based anchors to live streaming, helping them to coordinate their relationships with fans more effectively.

Details

Asia Pacific Journal of Marketing and Logistics, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1355-5855

Keywords

Article
Publication date: 14 July 2023

Kiran Patil, Vipul Garg, Janeth Gabaldon, Himali Patil, Suman Niranjan and Timothy Hawkins

This paper aims to examine how interfirm transactional and relational assets drive firm performance (FP) in digitally integrated supply chains.

Abstract

Purpose

This paper aims to examine how interfirm transactional and relational assets drive firm performance (FP) in digitally integrated supply chains.

Design/methodology/approach

The authors combine the Transaction Cost Economics (TCE) and Relational Exchange Theory (RET) frameworks to hypothesize that FP will be a function of Asset Specificity (AS), Digital Technology Usage (DTU) and Collaborative Information Sharing (CIS). In addition, the authors hypothesize that Supply Chain Integration (SCI) will partially mediate the effect of DTU and fully mediate the impact of AS and CIS on FP. A cross-sectional survey of supply chain managers is used to test the hypotheses.

Findings

Findings indicate that specific investments in digitally integrated supply chains would increase FP. In addition, SCI fully mediates the relationships between AS and FP and CIS and FP, while SCI partially mediates the influence of DTU on FP.

Practical implications

Managers could strategically engage in the technologies that effectively fit within the firm’s supply chain strategies and seek to develop a pragmatic expertise that enables the effective use of technology in a comprehensive setting.

Originality/value

The study enriches the extant literature by incorporating TCE and RET as contradictory viewpoints on AS and investigating how transactional and relational assets affect FP in digitally integrated supply chains.

Details

Journal of Enterprise Information Management, vol. 37 no. 2
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 30 October 2023

Qiang Lu, Yu Jiang and Yu Wang

This study investigates the impact of supply chain governance (SCG, which includes relational governance and contractual governance) on supply chain resilience (SCR) using the…

Abstract

Purpose

This study investigates the impact of supply chain governance (SCG, which includes relational governance and contractual governance) on supply chain resilience (SCR) using the information processing theory. Moreover, the study also examines the mediating role of information processing capability and the moderating role of digital technology (DT) deployment.

Design/methodology/approach

A total of 288 questionnaires were collected from the Chinese manufacturing industry, and hierarchical regression was used to empirically test the proposed model.

Findings

This study reveals that SCG positively impacts SCR. Moreover, information processing capability plays a mediating role between SCG and SCR. Furthermore, the breadth of DT deployment positively moderates the effect of relational governance on information processing capability, and the depth of DT deployment positively moderates the effects of both relational governance and contractual governance on information processing capability.

Originality/value

This study offers a novel perspective that helps to understand the importance of the supply chain-wide information acquired by SCG in respect of improving SCR. Furthermore, this article extends the application of information processing theory by providing empirical evidence of the mediating role of information processing capability and elucidating the moderating role of DT deployment.

Details

Industrial Management & Data Systems, vol. 124 no. 1
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 9 August 2023

Mohamad Tannir, Grant Mills, Ilias Krystallis and Jas Kalra

This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and…

Abstract

Purpose

This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and coordination in inter-organisational projects (IOPs) on sub-system and project levels.

Design/methodology/approach

The authors use the Viable Systems Model as a framework to analyse inter-organisational project governance, cooperation and coordination by adopting a multiple-case study.

Findings

The findings illustrate how governance and coordination mechanisms exhibit a filter-down effect on lower sub-systems while cooperation influence is confined within each sub-system. While remarking the importance of specific sub-systems on the overall project performance, the interplay of governance, cooperation and coordination across sub-systems appears to be complex, with governance influencing cooperation and coordination, whereas cooperation and coordination influence each other with an incremental effect.

Originality/value

This study defines two propositions that explain how multiple levels of analysis (project and sub-systems) can support the governance of large inter-organisational projects. The authors elaborate theory on the interplay of inter-organisational project governance, cooperation and coordination.

Details

International Journal of Operations & Production Management, vol. 44 no. 3
Type: Research Article
ISSN: 0144-3577

Keywords

1 – 10 of over 4000