Open Access
Article
Publication date: 27 April 2020

Murat Gunduz and Hesham Ahmed Elsherbeny

This paper covers the development of a multidimensional contract administration performance model (CAPM) for construction projects. The proposed CAPM is intended to be used by the…

14309

Abstract

Purpose

This paper covers the development of a multidimensional contract administration performance model (CAPM) for construction projects. The proposed CAPM is intended to be used by the industry stakeholders to measure the construction contract administration (CCA) performance and identify the strengths and weaknesses of the CCA system for running or completed projects.

Design/methodology/approach

The research design follows a sequential mixed methodology of qualitative and quantitative data collection and analysis. In the first phase, contract administration indicators were collected from relevant literature. In the second phase, an online questionnaire was prepared, and data were collected and analyzed using the crisp value of fuzzy membership function, and structural equation modeling (SEM). The fuzzy set was chosen for this study due to the presence of uncertainty and fuzziness associated with the importance of several key indicators affecting the CCA performance. Finally, SEM was used to test and analyze interrelationships among constructs of CCA performance.

Findings

The data collected from 336 construction professionals worldwide through an online survey was utilized to develop the fuzzy structural equation model. The goodness-of-fit and reliability tests validated the model. The study concluded a significant correlation between CCA performance, CCA operational indicators, and the process groups.

Originality/value

The contribution of this paper to the existing knowledge is the development of a fuzzy structural equation model that serves as a measurement tool for the contract administration performance. This is the first quantitative structural equation model to capture contract administration performance. The model consists of 93 Construction Contract Administration(CCA) performance indicators categorized into 11 project management process groups namely: project governance and start-up; team management; communication and relationship management; quality and acceptance management; performance monitoring and reporting management; document and record management; financial management; changes and control management; claims and dispute resolution management; contract risk management and contract closeout management.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 2 August 2022

Sina Moradi and Kalle Kähkönen

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have…

1977

Abstract

Purpose

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have addressed success factors of various collaborative delivery models (e.g. alliance and partnering). However, there is currently very limited research-based knowledge concerning core success factors for different collaborative delivery models, exploring the commonalities. Thus, this study aims to conceptualize a success model for collaborative construction projects by identifying and structuring their core success factors through the lens of project delivery elements.

Design/methodology/approach

A systematic literature review was conducted, and thematic as well as content analysis of the relevant studies led to the identification of mentioned success factors in the literature for different collaborative delivery models. Then, those common success factors were structured in a model based on factors' relation to project delivery elements.

Findings

The obtained results present eight core success factors (e.g. equality, mutual trust and commitment to win–win philosophy) for collaborative construction projects, structured in a model based on their contribution toward project organization, contractual relationships, and operational system in construction project delivery. Moreover, the differences between success factors for traditional and collaborative construction projects are discussed.

Originality/value

This study's findings provide insightful theoretical contributions on collaborative construction project success and providing a departure point for future studies based on the discussed differences between success factors of collaborative and traditional construction projects. The findings can be also practically insightful for the project professionals in collaborative construction projects to succeed in managing project organization, contractual relationships, and operational system.

Details

Built Environment Project and Asset Management, vol. 12 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 25 November 2022

Silvia Regina Veronezi Correia and Cristina Dai Prá Martens

The purpose of this article is to identify the critical success factors (CSFs) of information technology (IT) projects using cloud computing. CSFs are variables that can influence…

1960

Abstract

Purpose

The purpose of this article is to identify the critical success factors (CSFs) of information technology (IT) projects using cloud computing. CSFs are variables that can influence the success of projects and therefore need to be identified and managed appropriately.

Design/methodology/approach

This is an exploratory qualitative study with 23 experts in cloud computing projects through semi-structured interviews. The data was analyzed using content analysis.

Findings

The results present a list of CSFs for projects in a cloud computing environment. The study demonstrated that the CSF with greater relevance to cloud projects is the team’s technical capacity, followed by the support of senior management and the team’s soft skills. In addition, results demonstrated that contract item management is a limiting factor for cloud projects.

Research limitations/implications

The sample comprised only Brazilian experts, so it may not represent the same scenario as in other locations. The CSF ratio for cloud computing projects may vary depending on the company’s maturity in projects of this nature.

Practical implications

The CSF relationship can guide managers in properly conducting cloud computing projects, contributing to minimizing the risks and challenges that may interfere with the project.

Social implications

The relationship of the CSFs in cloud computing projects proposed fills a gap in studies specifically related to this context and tries to minimize project managers’ stress.

Originality/value

Contract items for the cloud context are added to the CSF literature in IT projects, which have not been addressed so far.

Details

RAUSP Management Journal, vol. 58 no. 1
Type: Research Article
ISSN: 2531-0488

Keywords

Open Access
Article
Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…

14032

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 29 August 2022

Henrik Franke, Finn Wynstra, Fabian Nullmeier and Chloe Nullmeier

Managing projects is an important part of operations management, but many projects fail. This study focuses on attribution processes of such disruption from the underrepresented…

1360

Abstract

Purpose

Managing projects is an important part of operations management, but many projects fail. This study focuses on attribution processes of such disruption from the underrepresented perspective of the project manager. The authors consider two types of causes: the more frequently researched environmental uncertainty (i.e. uncontrollable events) and the scarcely researched uncertainty imposed by non-collaborative project sponsors (i.e. other-controllable events).

Design/methodology/approach

The authors test conceptual arguments grounded in attribution theory and the notion of psychological contracts in a scenario-based experiment among 325 practicing project managers.

Findings

The findings indicate that non-collaborative project sponsors negatively affect project managers' motivation, whereas uncontrollable disruptions leave hope to achieve positive future outcomes. This latter effect is further strengthened when project managers have an internal attribution style. They tend to blame the disruption on themselves and generally feel in control of achieving success even if they are not.

Originality/value

These socio-psychological insights nuance the economic idea that uncertainty reduces motivation per se in the context of project disruption appraisal. The authors contribute to the behavioral project management literature and general attribution theory and help guide the allocation of resources during the recovery of failed projects.

Details

International Journal of Operations & Production Management, vol. 42 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 8 September 2022

Innocent Musonda and Chioma Sylvia Okoro

Business process re-engineering (BPR) initiatives are complex endeavours which require many factors to ensure success. However, most studies focus on the organisational processes…

2985

Abstract

Purpose

Business process re-engineering (BPR) initiatives are complex endeavours which require many factors to ensure success. However, most studies focus on the organisational processes and improvement within the organisation itself and less on the project team and management dynamics. The study aimed to identify factors that enabled the completion of a BPR, in a technical firm, based on reflections on the project management style.

Design/methodology/approach

The study entailed a descriptive and interpretive case study with reflections from project team members. Data were analysed using descriptive statistics and content analysis.

Findings

Findings revealed that critical success factors for BPR in a technical firm include project leadership and sponsorship, organisational culture and attributes, team dynamics and the nature (activities), and duration of the process.

Practical implications

The findings will benefit project managers in improving their competence and project success through reflective practice. The identified factors could be used in future projects of a similar nature and size to improve how organisations execute BPR projects.

Originality/value

The study used reflections to identify success factors for BPR in a technical firm.

Open Access
Article
Publication date: 22 May 2020

Marzenna Cichosz, Carl Marcus Wallenburg and A. Michael Knemeyer

The rapid advancement of digital technologies has fundamentally changed the competitive dynamics of the logistics service industry and forced incumbent logistics service providers…

43999

Abstract

Purpose

The rapid advancement of digital technologies has fundamentally changed the competitive dynamics of the logistics service industry and forced incumbent logistics service providers (LSPs) to digitalize. As many LSPs still struggle in advancing their digital transformation (DT), the purpose of this study is to discover barriers and identify organizational elements and associated leading practices for DT success at LSPs.

Design/methodology/approach

This study utilizes a two-stage approach. Stage 1 is devoted to a literature review. Stage 2, based on multiple case studies, analyzes information collected across nine international and global LSPs.

Findings

This research derives a practice-based definition of DT in the logistics service industry, and it has identified five barriers, eight success factors and associated leading practices for DT. The main obstacles LSPs struggle with, are the complexity of the logistics network and lack of resources, while the main success factor is a leader having and executing a DT vision, and creating a supportive organizational culture.

Practical implications

The results contribute to the emerging field of DT within the logistics and supply chain management literature and provide insights for practitioners regarding how to effectively implement it in a complex industry.

Originality/value

The authors analyze DT from the perspective of LSPs, traditionally not viewed as innovative companies. This study compares their DT with that of other companies.

Details

The International Journal of Logistics Management, vol. 31 no. 2
Type: Research Article
ISSN: 0957-4093

Keywords

Open Access
Article
Publication date: 18 May 2022

Salman Ashkanani and Robert Franzoi

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current…

5306

Abstract

Purpose

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current practices in the industry for the development and execution of megaprojects. Existing literature generally focuses on individual elements applicable to project management in general. This article aims to provide an overview of the project management system components used in industrial megaprojects and identify the gaps between theory and practice, which can be used as input for further research on the topic.

Design/methodology/approach

The topic of megaproject management is reviewed based on available literature sources on megaproject management systems to identify the main gaps in the literature between theory and practice. Based on the findings, an analysis is provided to discuss the improvements required in distinct project management areas and phases.

Findings

There are multiple gaps associated with issues, failures, successes and challenges in industrial megaprojects. Improvements are needed in distinct management areas and over the entire project lifetime. Further guidelines are required for achieving improved megaproject management systems. Such concepts could benefit researchers and practitioners in streamlining their research toward the most relevant and critical areas of improvement of megaproject management systems.

Originality/value

This study addresses the literature gaps between theory and practices on megaproject management systems with an overview that provides helpful guidance for industrial applications and future research. A holistic analysis identifies gaps and critical drives in the body of knowledge, revealing avenues for future research focused on quality as the central pillar that affects the entire megaproject management system.

Details

Management Matters, vol. 19 no. 2
Type: Research Article
ISSN: 2752-8359

Keywords

Open Access
Article
Publication date: 11 August 2023

Guus Keusters, Frédérique Batelaan, Froukje SleeswijkVisser, Erik-Jan Houwing and Hans Bakker

The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design…

1003

Abstract

Purpose

The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design processes that are more closely linked to the relevance of the project context, it is hypothesised that empathic abilities could play an important role in the performance of civil engineering projects. Therefore, this study aims to investigate whether performance can be improved by focusing on empathic abilities during the integrated design phase.

Design/methodology/approach

Semi-structured in-depth interviews with experts were conducted to explore the relevance of empathic abilities and their interaction with performance in a real-life infrastructure project. The project team’s empathy level was measured by means of a survey using Davis’ Interpersonal Reactivity Index method. Finally, differences between expected and measured levels of empathy were analysed.

Findings

The results provide insights into how empathic abilities interact with performance. The measurement indicates that, on average, professionals in the civil engineering industry score relatively low on empathy. In addition, differences were identified between the expected distribution and the measured empathy levels of the team, implying a potential for improvement, in particular by increasing the empathic abilities of the project management and increasing gender diversity.

Originality/value

To the best of the authors’ knowledge, this study is the first to investigate a relationship between empathy and the performance of civil engineering projects. The results provide initial insights into the empathic ability of civil engineering project teams and the potential of empathy to improve performance. Furthermore, from an empathy perspective, this study advocates increasing the gender diversity of project teams to improve performance.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 21 July 2023

Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…

1025

Abstract

Purpose

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.

Design/methodology/approach

Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.

Findings

The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.

Practical implications

The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.

Originality/value

The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords