Search results

1 – 10 of over 3000
Article
Publication date: 31 October 2023

Hong Zhou, Binwei Gao, Shilong Tang, Bing Li and Shuyu Wang

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly…

Abstract

Purpose

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly promote the overall performance of the project life cycle. The miss of clauses may result in a failure to match with standard contracts. If the contract, modified by the owner, omits key clauses, potential disputes may lead to contractors paying substantial compensation. Therefore, the identification of construction project contract missing clauses has heavily relied on the manual review technique, which is inefficient and highly restricted by personnel experience. The existing intelligent means only work for the contract query and storage. It is urgent to raise the level of intelligence for contract clause management. Therefore, this paper aims to propose an intelligent method to detect construction project contract missing clauses based on Natural Language Processing (NLP) and deep learning technology.

Design/methodology/approach

A complete classification scheme of contract clauses is designed based on NLP. First, construction contract texts are pre-processed and converted from unstructured natural language into structured digital vector form. Following the initial categorization, a multi-label classification of long text construction contract clauses is designed to preliminary identify whether the clause labels are missing. After the multi-label clause missing detection, the authors implement a clause similarity algorithm by creatively integrating the image detection thought, MatchPyramid model, with BERT to identify missing substantial content in the contract clauses.

Findings

1,322 construction project contracts were tested. Results showed that the accuracy of multi-label classification could reach 93%, the accuracy of similarity matching can reach 83%, and the recall rate and F1 mean of both can reach more than 0.7. The experimental results verify the feasibility of intelligently detecting contract risk through the NLP-based method to some extent.

Originality/value

NLP is adept at recognizing textual content and has shown promising results in some contract processing applications. However, the mostly used approaches of its utilization for risk detection in construction contract clauses predominantly are rule-based, which encounter challenges when handling intricate and lengthy engineering contracts. This paper introduces an NLP technique based on deep learning which reduces manual intervention and can autonomously identify and tag types of contractual deficiencies, aligning with the evolving complexities anticipated in future construction contracts. Moreover, this method achieves the recognition of extended contract clause texts. Ultimately, this approach boasts versatility; users simply need to adjust parameters such as segmentation based on language categories to detect omissions in contract clauses of diverse languages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 February 2024

Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…

Abstract

Purpose

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.

Design/methodology/approach

The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.

Findings

Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.

Originality/value

Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 August 2022

Bo Tian, Jiaxin Fu, Yongshun Xu and Longshan Sun

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract…

Abstract

Purpose

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract and transaction cost, may be a viable solution to this issue. The purpose of this study is to investigate the relationship between contract flexibility and the sustainability performance of PPP projects. The multiple mediating roles of justice perception and cooperation efficiency are assessed, thereby allowing the pathways and conditions to be understood more comprehensively for improving the sustainability performance of PPP projects.

Design/methodology/approach

Nine hypotheses in the proposed research model are tested via structural equation modeling using data acquired from 218 Chinese PPP professionals.

Findings

Results show that contract flexibility positively affects PPP project sustainability performance. Justice perception and cooperation efficiency play direct and sequential mediating roles in this effect.

Originality/value

This study validates that contract flexibility positively impacts the sustainability performance of PPP projects, where justice perception and cooperation efficiency serve direct and sequential mediating roles. The findings of this study contribute to an improved understanding of the effect of contract flexibility on the sustainability performance of PPP projects. Furthermore, they provide important theoretical and practical insights into contract management as well as beneficial information and valuable initiatives for improving the sustainability of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 9 November 2023

Abdulmohsen S. Almohsen, Naif M. Alsanabani, Abdullah M. Alsugair and Khalid S. Al-Gahtani

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the…

Abstract

Purpose

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the quality of the owner's estimation for predicting precisely the contract cost at the pre-tendering phase and avoiding future issues that arise through the construction phase.

Design/methodology/approach

This paper integrated artificial neural networks (ANN), deep neural networks (DNN) and time series (TS) techniques to estimate the ratio of a low bid to the OEC (R) for different size contracts and three types of contracts (building, electric and mechanic) accurately based on 94 contracts from King Saud University. The ANN and DNN models were evaluated using mean absolute percentage error (MAPE), mean sum square error (MSSE) and root mean sums square error (RMSSE).

Findings

The main finding is that the ANN provides high accuracy with MAPE, MSSE and RMSSE a 2.94%, 0.0015 and 0.039, respectively. The DNN's precision was high, with an RMSSE of 0.15 on average.

Practical implications

The owner and consultant are expected to use the study's findings to create more accuracy of the owner's estimate and decrease the difference between the owner's estimate and the lowest submitted offer for better decision-making.

Originality/value

This study fills the knowledge gap by developing an ANN model to handle missing TS data and forecasting the difference between a low bid and an OEC at the pre-tendering phase.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 December 2023

Nnedinma Umeokafor, Abimbola Windapo and Oluwole Alfred Olatunji

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health…

Abstract

Purpose

The purpose of this study is to investigate the influences of the characteristics of procurement strategies, in this instance labour-only, on project performance concerning health and safety (H&S), a project performance indicator.

Design/methodology/approach

Using non-probability purposeful and snowballing sampling methods, questionnaires were used to collect data from construction professionals in Nigeria. This was then analysed using descriptive (frequency and mean scores) and inferential statistics (Mann–Whitney-U and Kendall's Tau_b tests).

Findings

The findings indicate a statistically significant negative correlation between ‘the level of client involvement and ‘fatalities' and a positive one with ‘conducting of health and safety risk assessment' and ‘conducting employee surveys on health and safety attitude’. Poor hygiene is found to be the worst lagging indicator, while conducting of inspection is the most adopted leading indicator of project health and safety performance. It also emerged that there is no significant difference in the health and safety performance of projects procured through the procurement strategy in urban and rural areas.

Practical implications

The study provides valuable insight into the complexities in H&S management due to the high level of client involvement in labour-only procurement system (LoPS) projects and the level of diversity in their responsibilities therein. It creates a fundamental direction for developing a detailed framework or guidance notes for client involvement in the integration of H&S into LoPS projects.

Originality/value

This is the first study that examines the influence of the characteristics of procurement strategy on project health and safety performance. Evidence in the literature shows that project delivery outcomes significantly improve if procurement is strategically used, including when it is considered early in projects. However, integrating H&S into procurement strategies has received little attention.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 23 January 2024

Dilan Weerasooriya, K.A.T.O Ranadewa and B.A.K.S Perera

Cyber-physical systems (CPS) enable the synergistic integration of virtual models with the physical environment. This integration is gaining recognition for its potential to…

Abstract

Purpose

Cyber-physical systems (CPS) enable the synergistic integration of virtual models with the physical environment. This integration is gaining recognition for its potential to enhance construction project information management, thereby contributing to improved cost management in construction. Similarly, quantity surveyor (QS) plays a key role in construction projects by estimating and monitoring construction costs. Consequently, this research aims to explore redefining the role of QSs by integrating CPS.

Design/methodology/approach

The research adopted an interpretivism stance to collect and analyse data. Two rounds of 21 and 19 semi-structured interviews were conducted, with experts selected through heterogeneous purposive sampling. Code-based content analysis was used to analyse the data using NVivo12. MS Visio data visualisation tool was used to present the findings.

Findings

It is empirically proven the potential of CPS to facilitate nine key roles of QSs in all stages of the RIBA plan of work through the identification of 15 CPS applications and technologies. Nine key roles of QSs that CPS can facilitate were identified as preliminary estimation, measurement and quantification, contract administration, preparation of BOQ, interim valuation and payments, tender and contract documentation, cost planning, cost control and procurement advice. The study explored how adopting CPS technologies can transform traditional quantity surveying practices and enhance their value within the construction industry.

Originality/value

The findings add to the body of knowledge by redefining the role of QS through the integration of CPS for the first time and then by highlighting the usages of CPS in the construction industry rather than limiting it to a specific sector of the construction industry, as previous studies have done. This research uncovers several other research arenas on CPS as being the very first research to evaluate CPS to facilitate key roles of QSs. The findings can enhance the awareness and the practical implementation of CPS by intervening to form more partnerships among application developers and industry leaders.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 February 2024

M.K.S. Al-Mhdawi, Alan O'connor, Abroon Qazi, Farzad Rahimian and Nicholas Dacre

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Abstract

Purpose

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Design/methodology/approach

In this research, a three-step systematic literature review methodology was employed to analyse 55 selected articles on Critical Infrastructure Risks (CIRs) from well-regarded and relevant academic journals published from 2011 to 2023.

Findings

The findings highlight a growing research focus on CIRs from 2011 to 2023. A total of 128 risks were identified and grouped into ten distinct categories: construction, cultural, environmental, financial, legal, management, market, political, safety and technical risks. In addition, literature reviews combined with questionnaire surveys were more frequently used to identify CIRs than any other method. Moreover, oil and gas projects were the subjects most often explored in the reviewed papers. Furthermore, it was observed that publications from Iran, the USA and China dominated CIRs research, making significant contributions, accounting for 49.65% of the analysed articles.

Research limitations/implications

This research specifically focuses on five types of CIPs (i.e. roadways, bridges, water supply systems, dams and oil and gas projects). Other CIPs like cyber-physical systems or electric power systems, were not considered in this research.

Practical implications

Governments and contracting firms can benefit from the findings of this study by understanding the significant risks associated with the execution of CIPs, irrespective of the nation, industry or type of project. The results of this investigation can offer construction professionals valuable insights to formulate and implement risk response plans in the early stages of a project.

Originality/value

As a novel literature review related to CIRs, it lays the groundwork for future research and deepens the understanding of the multi-faceted effects of these risks, as well as sets practical response strategies.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 9 August 2023

Mohamad Tannir, Grant Mills, Ilias Krystallis and Jas Kalra

This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and…

Abstract

Purpose

This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and coordination in inter-organisational projects (IOPs) on sub-system and project levels.

Design/methodology/approach

The authors use the Viable Systems Model as a framework to analyse inter-organisational project governance, cooperation and coordination by adopting a multiple-case study.

Findings

The findings illustrate how governance and coordination mechanisms exhibit a filter-down effect on lower sub-systems while cooperation influence is confined within each sub-system. While remarking the importance of specific sub-systems on the overall project performance, the interplay of governance, cooperation and coordination across sub-systems appears to be complex, with governance influencing cooperation and coordination, whereas cooperation and coordination influence each other with an incremental effect.

Originality/value

This study defines two propositions that explain how multiple levels of analysis (project and sub-systems) can support the governance of large inter-organisational projects. The authors elaborate theory on the interplay of inter-organisational project governance, cooperation and coordination.

Details

International Journal of Operations & Production Management, vol. 44 no. 3
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

457

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 6 June 2023

Oluwole Alfred Olatunji and Chamil Erik D. Ramanayaka

This study aims to investigate clients' attributes, their key decision variables and causal relationships between the decision variables. In addition, the purpose of the study is…

Abstract

Purpose

This study aims to investigate clients' attributes, their key decision variables and causal relationships between the decision variables. In addition, the purpose of the study is to map-out from these analyses, the attributes of project clients that motivate contractors' bid decision.

Design/methodology/approach

A total of 50 responses were obtained from a questionnaire survey. 50% of participants are contractors. 44% are claims consultants, whilst 6% are manufacturers and clients. Beyond measures of central tendencies, analysis focussed on causal relationships by way of correlation, analysis of variance and reductionism.

Findings

All 20 factors considered have significant correlations with at least one other factor. Findings also show the factors can be clustered into six: reputation, financial strength, relationship with the bidder, organisational attributes, history with project attributes and project organisation.

Practical implications

Evidence suggests stakeholders have often struggled to consider the many decision factors reported in normative literature, numbering hundreds. By clustering the factors into sub-themes, bid decisioning has been made more efficient. The study also explains how client attributes could determine project success and contractor participation. Different stakeholders can use findings of this study for training and further studies.

Originality/value

Previous studies have considered bid decisioning indexically – factors were long, analyses were largely inconclusive, and causal relationships are orthogonal. Findings in this study have shown depth: 20 originating client-specific factors were clustered into six sub-themes, and correlations were established. The methodology used for the study is confirmatory and conclusive.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 10 of over 3000