Article
Publication date: 19 February 2024

Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…

Abstract

Purpose

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.

Design/methodology/approach

The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.

Findings

Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.

Originality/value

Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 9 November 2023

Abdulmohsen S. Almohsen, Naif M. Alsanabani, Abdullah M. Alsugair and Khalid S. Al-Gahtani

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the…

Abstract

Purpose

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the quality of the owner's estimation for predicting precisely the contract cost at the pre-tendering phase and avoiding future issues that arise through the construction phase.

Design/methodology/approach

This paper integrated artificial neural networks (ANN), deep neural networks (DNN) and time series (TS) techniques to estimate the ratio of a low bid to the OEC (R) for different size contracts and three types of contracts (building, electric and mechanic) accurately based on 94 contracts from King Saud University. The ANN and DNN models were evaluated using mean absolute percentage error (MAPE), mean sum square error (MSSE) and root mean sums square error (RMSSE).

Findings

The main finding is that the ANN provides high accuracy with MAPE, MSSE and RMSSE a 2.94%, 0.0015 and 0.039, respectively. The DNN's precision was high, with an RMSSE of 0.15 on average.

Practical implications

The owner and consultant are expected to use the study's findings to create more accuracy of the owner's estimate and decrease the difference between the owner's estimate and the lowest submitted offer for better decision-making.

Originality/value

This study fills the knowledge gap by developing an ANN model to handle missing TS data and forecasting the difference between a low bid and an OEC at the pre-tendering phase.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 January 2024

Dilan Weerasooriya, K.A.T.O Ranadewa and B.A.K.S Perera

Cyber-physical systems (CPS) enable the synergistic integration of virtual models with the physical environment. This integration is gaining recognition for its potential to…

Abstract

Purpose

Cyber-physical systems (CPS) enable the synergistic integration of virtual models with the physical environment. This integration is gaining recognition for its potential to enhance construction project information management, thereby contributing to improved cost management in construction. Similarly, quantity surveyor (QS) plays a key role in construction projects by estimating and monitoring construction costs. Consequently, this research aims to explore redefining the role of QSs by integrating CPS.

Design/methodology/approach

The research adopted an interpretivism stance to collect and analyse data. Two rounds of 21 and 19 semi-structured interviews were conducted, with experts selected through heterogeneous purposive sampling. Code-based content analysis was used to analyse the data using NVivo12. MS Visio data visualisation tool was used to present the findings.

Findings

It is empirically proven the potential of CPS to facilitate nine key roles of QSs in all stages of the RIBA plan of work through the identification of 15 CPS applications and technologies. Nine key roles of QSs that CPS can facilitate were identified as preliminary estimation, measurement and quantification, contract administration, preparation of BOQ, interim valuation and payments, tender and contract documentation, cost planning, cost control and procurement advice. The study explored how adopting CPS technologies can transform traditional quantity surveying practices and enhance their value within the construction industry.

Originality/value

The findings add to the body of knowledge by redefining the role of QS through the integration of CPS for the first time and then by highlighting the usages of CPS in the construction industry rather than limiting it to a specific sector of the construction industry, as previous studies have done. This research uncovers several other research arenas on CPS as being the very first research to evaluate CPS to facilitate key roles of QSs. The findings can enhance the awareness and the practical implementation of CPS by intervening to form more partnerships among application developers and industry leaders.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 February 2024

M.K.S. Al-Mhdawi, Alan O'connor, Abroon Qazi, Farzad Rahimian and Nicholas Dacre

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Abstract

Purpose

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Design/methodology/approach

In this research, a three-step systematic literature review methodology was employed to analyse 55 selected articles on Critical Infrastructure Risks (CIRs) from well-regarded and relevant academic journals published from 2011 to 2023.

Findings

The findings highlight a growing research focus on CIRs from 2011 to 2023. A total of 128 risks were identified and grouped into ten distinct categories: construction, cultural, environmental, financial, legal, management, market, political, safety and technical risks. In addition, literature reviews combined with questionnaire surveys were more frequently used to identify CIRs than any other method. Moreover, oil and gas projects were the subjects most often explored in the reviewed papers. Furthermore, it was observed that publications from Iran, the USA and China dominated CIRs research, making significant contributions, accounting for 49.65% of the analysed articles.

Research limitations/implications

This research specifically focuses on five types of CIPs (i.e. roadways, bridges, water supply systems, dams and oil and gas projects). Other CIPs like cyber-physical systems or electric power systems, were not considered in this research.

Practical implications

Governments and contracting firms can benefit from the findings of this study by understanding the significant risks associated with the execution of CIPs, irrespective of the nation, industry or type of project. The results of this investigation can offer construction professionals valuable insights to formulate and implement risk response plans in the early stages of a project.

Originality/value

As a novel literature review related to CIRs, it lays the groundwork for future research and deepens the understanding of the multi-faceted effects of these risks, as well as sets practical response strategies.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 9 August 2023

Mohamad Tannir, Grant Mills, Ilias Krystallis and Jas Kalra

This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and…

Abstract

Purpose

This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and coordination in inter-organisational projects (IOPs) on sub-system and project levels.

Design/methodology/approach

The authors use the Viable Systems Model as a framework to analyse inter-organisational project governance, cooperation and coordination by adopting a multiple-case study.

Findings

The findings illustrate how governance and coordination mechanisms exhibit a filter-down effect on lower sub-systems while cooperation influence is confined within each sub-system. While remarking the importance of specific sub-systems on the overall project performance, the interplay of governance, cooperation and coordination across sub-systems appears to be complex, with governance influencing cooperation and coordination, whereas cooperation and coordination influence each other with an incremental effect.

Originality/value

This study defines two propositions that explain how multiple levels of analysis (project and sub-systems) can support the governance of large inter-organisational projects. The authors elaborate theory on the interplay of inter-organisational project governance, cooperation and coordination.

Details

International Journal of Operations & Production Management, vol. 44 no. 3
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 2 April 2024

Erfan Shakibaei Bonakdeh, Amrik Sohal, Koorosh Rajabkhah, Daniel Prajogo, Angela Melder, Dinh Quy Nguyen, Gordon Bingham and Erica Tong

Adoption of Clinical Decision Support Systems (CDSS) is a crucial step towards the digital transition of the healthcare sector. This review aims to determine and synthesise the…

Abstract

Purpose

Adoption of Clinical Decision Support Systems (CDSS) is a crucial step towards the digital transition of the healthcare sector. This review aims to determine and synthesise the influential factors in CDSS adoption in inpatient healthcare settings in order to grasp an understanding of the phenomenon and identify future research gaps.

Design/methodology/approach

A systematic literature search of five databases (Medline, EMBASE, PsycINFO, Web of Science and Scopus) was conducted between January 2010 and June 2023. The search strategy was a combination of the following keywords and their synonyms: clinical decision support, hospital or secondary care and influential factors. The quality of studies was evaluated against a 40-point rating scale.

Findings

Thirteen papers were systematically reviewed and synthesised and deductively classified into three main constructs of the Technology–Organisation–Environment theory. Scarcity of papers investigating CDSS adoption and its challenges, especially in developing countries, was evident.

Practical implications

This study offers a summative account of challenges in the CDSS procurement process. Strategies to help adopters proactively address the challenges are: (1) Hospital leaders need a clear digital strategy aligned with stakeholders' consensus; (2) Developing modular IT solutions and conducting situational analysis to achieve IT goals; and (3) Government policies, accreditation standards and procurement guidelines play a crucial role in navigating the complex CDSS market.

Originality/value

To the best of the authors’ knowledge, this is the first review to address the adoption and procurement of CDSS. Previous literature only addressed challenges and facilitators within the implementation and post-implementation stages. This study focuses on the firm-level adoption phase of CDSS technology with a theory refining lens.

Details

Industrial Management & Data Systems, vol. 124 no. 4
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 16 June 2022

Kuei-Chen Chiu

This paper aims to answer these questions: “Is the public adopting energy-saving and water-saving facilities because they want to save energy and water in their psychological…

Abstract

Purpose

This paper aims to answer these questions: “Is the public adopting energy-saving and water-saving facilities because they want to save energy and water in their psychological perception?”, “Is it convenient to use energy-saving and water-saving facilities?”, “If the inductive design of energy-saving and water-saving facilities attracts the public’s interest, the public is it more willing to install energy-saving and water-saving facilities in a widespread manner?” and “Can inductive energy-saving and water-saving facilities be introduced into the smart manufacturing system of manufacturing industries that require a lot of water to effectively save water and save costs for the company?”.

Design/methodology/approach

This paper aims to investigate the attitudes of employees toward using energy-saving and water-saving facilities by constructing a questionnaire based on the ABC (Affect, Behavior, Cognition) model to survey the attitudes of employees from the Southern and Eastern of Taiwan and establishing a structural equation modeling (SEM) to examine the relationship between affect, behavior and cognition while using energy-saving and water-saving facilities.

Findings

There are some findings in this paper that the affective design have a strongly significant positive impact for using energy-saving and water-saving facility in the proposed model. People are willing to use energy-saving and water-saving facilities but are more willing to adopt those energy-saving and water-saving products of smart designs, as those take into account the emotional factors. The critical factor for the public to adopt energy-saving and water-saving facilities is smart design, which incorporates emotional elements.

Research limitations/implications

There are still some limitations of this study that the ABC model can only be used as a psychological discussion, and the development and design of related facilities still needs to be jointly developed with professionals in related technical fields. The introduction of induction water supply facilities needs to be considered while the company introduces the design of the smart manufacturing system. Therefore, professionals related to induction water supply should participate in the planning at the initial stage of the company's concept of introducing the smart manufacturing system.

Practical implications

On the practical side, based on preliminary research conclusions, this study proposes to introduce inductive water supply into smart manufacturing systems for manufacturing companies that require a lot of water in their manufacturing processes. In practice, the company can actually save a lot of water, thereby saving costs and reducing waste water discharge.

Social implications

The results of this study show that the public has a cognition of energy-saving and water-saving. However, there is a Chinese proverb that “easy to know and hard to do”, when actually using facilities, convenience is an important consideration for public. Smart facilities of energy-saving and water-saving, in addition to the benefits of energy-saving and water-saving, it is easy to use, and interacts with users through inductive water supply, which can more emotionally attract people's willingness to use.

Originality/value

This study found that smart facilities, which can more emotionally attract people's willingness to use. On the academic side, this study proves that using the ABC theory to explore the public’s psychological affective, behavior and cognition response to the use of facilities is a very suitable method. On the practical side, based on preliminary research conclusions, this study proposes to introduce inductive water supply into smart manufacturing systems for manufacturing companies that require a lot of water in their manufacturing processes. In practice, the company can actually save a lot of water, thereby saving costs and reducing waste water discharge.

Open Access
Article
Publication date: 1 July 2022

Maria Carmela Annosi, Elena Casprini and Hector Parra

The aim of the paper is to analyze how actors in foodservice companies organize for inbound open innovation (OI).

Abstract

Purpose

The aim of the paper is to analyze how actors in foodservice companies organize for inbound open innovation (OI).

Design/methodology/approach

This paper conducted a case analysis of a large and successful foodservice company operating in the Dutch market. Furthermore, drawing on 18 interviews and archive data, we identified the main organizational practices involved in the implementation of inbound innovation activities and the ways they are embraced are defined.

Findings

The results provide a holistic view of the main organizational practices a foodservice company implemented at different organizational levels, to exploit external knowledge coming from third parties and to promote the sharing and recombination of knowledge resources within the organization. The identified organizational practices reveal the main interaction patterns between relevant internal actors and other external parties in the company network, as well as between actors on different hierarchical organizational levels which allows processing relevant innovation information and make relevant decisions about it.

Research limitations/implications

Implications are provided in terms of both theory and practice. This paper helps foodservice companies to create an internal organizational environment that supports the exploitation of customer knowledge.

Originality/value

There are few studies on how companies organize themselves for OI in general, and especially in the foodservice sector.

Details

British Food Journal, vol. 126 no. 5
Type: Research Article
ISSN: 0007-070X

Keywords

Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 10 of over 1000