Search results

1 – 10 of 624
Open Access
Article
Publication date: 21 February 2018

Manda Broekhuis and Kirstin Scholten

The purpose of this paper is to investigate purchasing practices in service triads by exploring the link between ex ante contracting and ex post contract management and how these…

5486

Abstract

Purpose

The purpose of this paper is to investigate purchasing practices in service triads by exploring the link between ex ante contracting and ex post contract management and how these practices influence the satisfaction of buyers and suppliers (in concessionary arrangements) with their relationship in terms of meeting the needs of the buyer’s customers.

Design/methodology/approach

An in-depth exploratory multiple case study was carried out in a shop-in-shop context. Multi-method and multi-source data collection included interviews, documents and the contracts between buyer and supplier, providing evidence of the formal and relational structures in both the contracting and contract management stages.

Findings

The case findings provide evidence that behavioural standards established in a social contract are important prerequisites for the establishment and subsequent management of a formal contract. Second, this study shows that, when outsourcing core services in a service triad, a combination of performance-oriented and behavioural-oriented contract terms, covering a mix of topics related to both the customer-experience and to buyer-supplier-oriented aspects, contribute to aligning the buyer’s, suppliers’ and customers’ interests. The main findings are presented in a causal model and formulated as propositions.

Originality/value

This paper is one of the first studies to explore how core services are outsourced in a service triad. It provides evidence that the social contract between buyer and supplier influences the establishment of the formal contract as well as contract management, and a mix of contract topics, some related to the customers’ experience and others purely buyer-supplier oriented, contribute to the alignment of buyer’s, suppliers’ and customers’ interests.

Details

International Journal of Operations & Production Management, vol. 38 no. 5
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 29 April 2021

Anthony Macari and Grace Chun Guo

This conceptual paper focuses on a common observation in the implementation stage of reward-based crowdfunding (RBC) – entrepreneurs' failures and delays in delivery of rewards to…

1101

Abstract

Purpose

This conceptual paper focuses on a common observation in the implementation stage of reward-based crowdfunding (RBC) – entrepreneurs' failures and delays in delivery of rewards to investors, which, in turn, may be perceived as violations of reward delivery obligations.

Design/methodology/approach

Drawing on entrepreneurial personality theory and psychological contract theory, this paper develops propositions and identifies factors related to both entrepreneurs (overconfidence and narcissism) and factors related to investors (types of motivators and psychological contracts) that may explain the perceived violations of reward delivery obligations. Implications for theory and practice are also discussed.

Findings

The theoretical analysis, by wielding two independently developed literatures, has demonstrated that it is important to investigate factors that are related to both investors and entrepreneurs in understanding issues and challenges at different stages of the RBC model. The authors believe that the current analysis provides an integrated understanding and a solid foundation for researchers to further examine these issues by empirically testing these propositions.

Originality/value

The authors examined two previously understudied psychological factors in the context of RBC – entrepreneurial traits, mainly overconfidence and narcissism, and the type of psychological contracts formed between investors and entrepreneurs, both of which, according to McKenny et al. (2017), need greater attention from researchers studying crowdfunding.

Open Access
Article
Publication date: 27 January 2023

Farooq Ali and Harri Haapasalo

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by…

3237

Abstract

Purpose

This article aims to address the confusion related to the meanings of interorganisational cooperation, control, coordination and collaboration in collaborative projects by developing a conceptual framework. From this, the authors aim to describe the links among these concepts in terms of development levels of stakeholder relationships. In addition, the authors aim to identify challenges and preconditions in relation to developing relationships at different levels.

Design/methodology/approach

The authors have adopted the directed approach of qualitative content analysis method to validate and extend the conceptual framework of this study. The context of this study is a large hospital construction project located in northern Finland.

Findings

The findings of this study suggest that collaboration is a multilevel process of active engagement of multiple stakeholders. These stakeholders must have a high degree of shared understanding in terms of cooperation, control and coordination to achieve the mutually desired outcomes. This study also identifies the challenges that project stakeholders could face in developing collaborative relationships and propose preconditions for the same.

Practical implications

This study provides a better understanding for project managers to manage interorganisational collaborative construction projects successfully. The outcome of this research would be beneficial to project management team to deliver dispute-free construction projects.

Originality/value

Existing practical research on the development of relationships at different levels in collaborative construction projects is limited. This study offers a framework for the same which is validated in a real-life project.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 2 June 2023

Jad EL Bizri, Elina Karttunen and Katrina Lintukangas

This study aims to build on social capital theory (SCT) and its dimensions by examining the role of social capital in the public procurement process and by identifying related…

1359

Abstract

Purpose

This study aims to build on social capital theory (SCT) and its dimensions by examining the role of social capital in the public procurement process and by identifying related contingencies that may influence procurement performance.

Design/methodology/approach

A systematic literature review and a thematic analysis regarding social capital in procurement are conducted. The antecedent–behaviour–consequence (ABC) model is used for illuminating linkages between social capital, contingencies and procurement performance.

Findings

The dimensions of social capital are investigated in the procurement process; however, the extent of social capital role can vary between the phases of the process. It is concluded that the contingencies of social dynamics are linked with social capital and may influence the outcomes and performance of the procurement process.

Practical implications

Social capital can ease interactions between public buyers and private suppliers by contributing to effective tendering, improving social interaction in negotiations and balancing rigidity in contract management, supporting the interests of both parties. The provided framework helps decision makers to comprehend the social dynamics in public procurement.

Social implications

Improving social dynamics and solutions in public procurement.

Originality/value

This study extends social capital research in the field of public procurement and creates a framework connecting social capital and prevailing contingency factors to procurement process performance.

Details

Journal of Public Procurement, vol. 23 no. 2
Type: Research Article
ISSN: 1535-0118

Keywords

Open Access
Article
Publication date: 4 July 2022

Shiyu Wan, Yisheng Liu, Grace Ding, Goran Runeson and Michael Er

This article aims to establish a dynamic Energy Performance Contract (EPC) risk allocation model for commercial buildings based on the theory of Incomplete Contract. The purpose…

1553

Abstract

Purpose

This article aims to establish a dynamic Energy Performance Contract (EPC) risk allocation model for commercial buildings based on the theory of Incomplete Contract. The purpose is to fill the policy vacuum and allow stakeholders to manage risks in energy conservation management by EPCs to better adapt to climate change in the building sector.

Design/methodology/approach

The article chooses a qualitative research approach to depict the whole risk allocation picture of EPC projects and establish a dynamic EPC risk allocation model for commercial buildings in China. It starts with a comprehensive literature review on risks of EPCs. By modifying the theory of Incomplete Contract and adopting the so-called bow-tie model, a theoretical EPC risk allocation model is developed and verified by interview results. By discussing its application in the commercial building sector in China, an operational EPC three-stage risk allocation model is developed.

Findings

This study points out the contract incompleteness of the risk allocation for EPC projects and offered an operational method to guide practice. The reasonable risk allocation between building owners and Energy Service Companies can realize their bilateral targets on commercial building energy-saving benefits, which makes EPC more attractive for energy conservation.

Originality/value

Existing research focused mainly on static risk allocation. Less research was directed to the phased and dynamic risk allocation. This study developed a theoretical three-stage EPC risk allocation model, which provided the theoretical support for dynamic EPC risk allocation of EPC projects. By addressing the contract incompleteness of the risk allocation, an operational method is developed. This is a new approach to allocate risks for EPC projects in a dynamic and staged way.

Details

International Journal of Climate Change Strategies and Management, vol. 15 no. 4
Type: Research Article
ISSN: 1756-8692

Keywords

Open Access
Article
Publication date: 30 December 2019

Sandro Cabral, Priscila Fernandes Ribeiro and Sanders Zurdo Romão

This paper aims to analyze the underlying factors of contract renewals in business-to-business (B2B) contracts.

1576

Abstract

Purpose

This paper aims to analyze the underlying factors of contract renewals in business-to-business (B2B) contracts.

Design/methodology/approach

The authors build a unique data set with 296 contracts signed between a major firm supplying petrochemical goods and its 128 customers between 2013 and 2016. They use Insider Econometrics as their methodological approach.

Findings

The econometric results suggest that contracts involving higher volume of trade, higher levels of dedicated assets representing seller’s specific investments in each transaction, and contracts comprising more than one product present an increased likelihood of being renewed.

Research limitations/implications

Although limited to a single organization, this paper contributes to management theories focused on buyer–supplier relationships in which coordination between interdependent parties is required.

Practical implications

Practitioners engaged in B2B relationships may benefit from the findings to shape their bargaining strategies in contexts of high levels of asset specificity and bilateral dependence.

Originality/value

This paper contribute to theories related to the strategic negotiation between buyers and suppliers by emphasizing the importance of asset specificity in a nuanced and multifaceted fashion, by highlighting aspects related to resource dependency, and idiosyncratic characteristics on contract renewal.

Details

RAUSP Management Journal, vol. 55 no. 4
Type: Research Article
ISSN: 2531-0488

Keywords

Open Access
Article
Publication date: 5 December 2019

Timo Gossler, Ioanna Falagara Sigala, Tina Wakolbinger and Renate Buber

The purpose of this paper is to determine best practices of aid agencies for outsourcing logistics to commercial logistics service providers (LSPs) in disaster relief. Moreover…

6259

Abstract

Purpose

The purpose of this paper is to determine best practices of aid agencies for outsourcing logistics to commercial logistics service providers (LSPs) in disaster relief. Moreover, it evaluates the application of the Delphi method for research in humanitarian logistics.

Design/methodology/approach

The paper is based on a two-round Delphi study with 31 experts from aid agencies and a complementary full-day focus group with 12 experts from aid agencies and LSPs.

Findings

The study revealed 12 best practices for outsourcing logistics in disaster relief and a compilation of more than 100 activities for putting these practices into action. Experts consider a proper balance between efficiency and compliance, a detailed contract and a detailed service request most important. Additionally, the Delphi method was found to be a promising technique for research on humanitarian logistics.

Research limitations/implications

By critically examining the Delphi method, this study establishes the basis for a wider application of the technique in the field of humanitarian logistics. Furthermore, it can help to prioritize future research as the ranking of practices reflects the priorities of practitioners.

Practical implications

The paper provides guidance to practitioners at aid agencies in charge of outsourcing logistics.

Originality/value

This research is one of the first in the field of humanitarian logistics to apply the Delphi method. Moreover, it addresses the lack of literature dealing with approaches for building successful cross-sectoral partnerships.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 9 no. 3
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 4 December 2023

Michel Mann, Marco Warsitzka, Joachim Hüffmeier and Roman Trötschel

This study aims to identify effective behaviors in labor-management negotiation (LMN) and, on that basis, derive overarching psychological principles of successful negotiation in…

Abstract

Purpose

This study aims to identify effective behaviors in labor-management negotiation (LMN) and, on that basis, derive overarching psychological principles of successful negotiation in this important context. These empirical findings are used to develop and test a comprehensive negotiation training program.

Design/methodology/approach

Twenty-seven practitioners from one of the world’s largest labor unions were interviewed to identify the requirements of effective LMN, resulting in 796 descriptions of single behaviors from 41 negotiation cases.

Findings

The analyses revealed 13 categories of behaviors critical to negotiation success. The findings highlight the pivotal role of the union negotiator by illustrating how they lead the negotiations with the other party while also ensuring that their own team and the workforce stand united. To provide guidance for effective LMN, six psychological principles were derived from these behavioral categories. The paper describes a six-day training program developed for LMN based on the empirical findings of this study and the related six principles.

Originality/value

This paper has three unique features: first, it examines the requirements for effective LMN based on a systematic needs assessment. Second, by teaching not only knowledge and skills but also general psychological principles of successful negotiation, the training intervention is aimed at promoting long-term behavioral change. Third, the research presents a comprehensive and empirically-based training program for LMN.

Details

International Journal of Conflict Management, vol. 35 no. 2
Type: Research Article
ISSN: 1044-4068

Keywords

Open Access
Book part
Publication date: 1 May 2019

Leif D. Houck

For a public project leader charged with a construction project, it can be crucial to meet the budget, while maximizing the qualities within a construction project. A method to…

Abstract

Purpose

For a public project leader charged with a construction project, it can be crucial to meet the budget, while maximizing the qualities within a construction project. A method to achieve this is to use the “opposite design build” procurement method, in which the price is fixed and the contractors compete on adding a wide range of qualities to the project. However, such procurement approaches are rare, and it is difficult to find models on how to implement such an approach.

Design/Methodology/Approach

This study firstly looks at the literature on design-build, quality-only as the main selection criterion and to some degree on constructors’ bidding behaviour. Secondly, it explains a model for a design-build, quality-only procurement designed within the public tendering legislations. Thirdly, it investigates the outcome of the model applied to a specific case in Norway.

Findings

There seems to be a research gap within literature and cases on design-build, quality-only selection with a fixed price. The developed model allowed for negotiations, which led to more comparable and improved bids. In the investigated case, and the client was able to implement more qualities in the project than expected within the budget.

Research Limitations/Implications

The researcher was himself partly involved in the process as an advisor.

Practical Implications

The developed method is relatively simple and might readily be applied by any client to maximise a project’s qualities within a given fixed price.

Originality/Value

The long-term value should be to widen the range of useful procurement methods.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 14 February 2020

Rod Sheaff, Verdiana Morando, Naomi Chambers, Mark Exworthy, Ann Mahon, Richard Byng and Russell Mannion

Attempts to transform health systems have in many countries involved starting to pay healthcare providers through a DRG system, but that has involved managerial workarounds…

2366

Abstract

Purpose

Attempts to transform health systems have in many countries involved starting to pay healthcare providers through a DRG system, but that has involved managerial workarounds. Managerial workarounds have seldom been analysed. This paper does so by extending and modifying existing knowledge of the causes and character of clinical and IT workarounds, to produce a conceptualisation of the managerial workaround. It further develops and revises this conceptualisation by comparing the practical management, at both provider and purchaser levels, of hospital DRG payment systems in England, Germany and Italy.

Design/methodology/approach

We make a qualitative test of our initial assumptions about the antecedents, character and consequences of managerial workarounds by comparing them with a systematic comparison of case studies of the DRG hospital payment systems in England, Germany and Italy. The data collection through key informant interviews (N = 154), analysis of policy documents (N = 111) and an action learning set, began in 2010–12, with additional data collection from key informants and administrative documents continuing in 2018–19 to supplement and update our findings.

Findings

Managers in all three countries developed very similar workarounds to contain healthcare costs to payers. To weaken DRG incentives to increase hospital activity, managers agreed to lower DRG payments for episodes of care above an agreed case-load ‘ceiling' and reduced payments by less than the full DRG amounts when activity fell below an agreed ‘floor' volume.

Research limitations/implications

Empirically this study is limited to three OECD health systems, but since our findings come from both Bismarckian (social-insurance) and Beveridge (tax-financed) systems, they are likely to be more widely applicable. In many countries, DRGs coexist with non-DRG or pre-DRG systems, so these findings may also reflect a specific, perhaps transient, stage in DRG-system development. Probably there are also other kinds of managerial workaround, yet to be researched. Doing so would doubtlessly refine and nuance the conceptualisation of the ‘managerial workaround’ still further.

Practical implications

In the case of DRGs, the managerial workarounds were instances of ‘constructive deviance' which enabled payers to reduce the adverse financial consequences, for them, arising from DRG incentives. The understanding of apparent failures or part-failures to transform a health system can be made more nuanced, balanced and diagnostic by using the concept of the ‘managerial workaround'.

Social implications

Managerial workarounds also appear outside the health sector, so the present analysis of managerial workarounds may also have application to understanding attempts to transform such sectors as education, social care and environmental protection.

Originality/value

So far as we are aware, no other study presents and tests the concept of a ‘managerial workaround'. Pervasive, non-trivial managerial workarounds may be symptoms of mismatched policy objectives, or that existing health system structures cannot realise current policy objectives; but the workarounds themselves may also contain solutions to these problems.

Details

Journal of Health Organization and Management, vol. 34 no. 3
Type: Research Article
ISSN: 1477-7266

Keywords

1 – 10 of 624