Article
Publication date: 20 March 2024

Ki-Hyun Um

This study aims to (1) validate the efficacy of contractual and relational governance in enhancing operational performance and (2) explore the influence of product complexity on…

Abstract

Purpose

This study aims to (1) validate the efficacy of contractual and relational governance in enhancing operational performance and (2) explore the influence of product complexity on the effectiveness of these governance mechanisms, thereby determining the optimal approach for varying levels of product complexity.

Design/methodology/approach

By utilizing a comprehensive theoretical framework encompassing transaction cost economics, social exchange theory and contingency theory, this research explores the intricate interplay between governance mechanisms, product complexity and operational performance, drawing insights from a dataset comprising 246 responses within Mainland China’s manufacturing sector. To rigorously test the proposed hypotheses, this study employed a hierarchical regression analysis.

Findings

The findings of this study are summarized as follows: (1) while both contractual governance and relational governance have a significant impact on operational performance, relational governance is found to be more effective than contractual governance in enhancing operational performance; and (2) the moderation effect of product complexity is evident, as it weakens the impact of contractual governance while simultaneously enhancing the positive influence of relational governance on operational performance.

Originality/value

The study uncovers a moderation effect of product complexity on the relationship between governance mechanisms and operational performance. This finding adds an original contribution to the literature by highlighting how product complexity can interact with governance strategies, providing practical insights for industries dealing with varying levels of product complexity.

Details

Journal of Manufacturing Technology Management, vol. 35 no. 3
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 14 August 2023

Murali Jagannathan and Venkata Santosh Kumar Delhi

Judiciary plays a pivotal role in the overall development of a nation's economy and its involvement assures process transparency and impartiality. However, litigation is often…

Abstract

Purpose

Judiciary plays a pivotal role in the overall development of a nation's economy and its involvement assures process transparency and impartiality. However, litigation is often expensive, uncertain and prone to delays. Notwithstanding such inherent challenges associated with litigation, it is observed that parties in construction disputes do resort to litigation. This study attempts to understand the potential paths triggering litigation of contractual disputes in construction. While extant researchers have identified focus areas or factors influencing litigation, the underlying paths connecting these focus areas, leading parties to litigation, is explored in this study.

Design/methodology/approach

Considering the framework of Rachlinski's “framing theory of litigation” and the mixed-methods approach (qualitative and quantitative approaches), this study proposes and validates a model that identifies the paths to litigation of contractual disputes in construction.

Findings

The results of in-depth interviews, followed by validation through structural equation modelling (SEM), reveal four critical paths, namely positional focus (PF) – contract and dispute characteristics (CDC) – decision to litigate (DTL), milieu influence (MI) – CDC – DTL, MI-PF-DTL and CDC-DTL.

Practical implications

The identified paths highlight the areas policymakers can consider while developing policy interventions to mitigate litigation.

Originality/value

Researchers have identified factors causing litigation in construction. However, attempts to examine the existence of multi-factor “paths” on the decision to litigate (DTL) have hitherto received a muted response, so this study focuses on identifying the project-level path(s) leading to the litigation of contractual disputes in construction.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 9 January 2024

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this research is to develop a project complexity index (PCI) model using the best and worst method (BWM) to quantitatively analyze the impact of project…

Abstract

Purpose

The purpose of this research is to develop a project complexity index (PCI) model using the best and worst method (BWM) to quantitatively analyze the impact of project complexities on the performance of metro rail projects.

Design/methodology/approach

This study employed a two-phase research methodology. The first phase identifies complexities through a literature review and expert discussions and categorizes different types of complexities in metro rail projects. In the second phase, BWM, a robust multi-criteria decision-making (MCDM) technique, was used to prioritize key complexities, and a PCI model was developed. Further, the developed PCI was validated through case studies, and sensitivity analysis was performed to check the accuracy and applicability of the developed PCI model.

Findings

The analysis revealed that location complexity exerted the most substantial influence on project performance, followed by environmental, organizational, technological and contractual complexities. Sensitivity analysis revealed the varying impacts of complexity indices on the overall project complexity.

Practical implications

The study's findings offer a novel approach for measuring project complexity's impact on metro rail projects. This allows stakeholders to make informed decisions, allocate resources efficiently and plan strategically.

Originality/value

The existing studies on project complexity identification and quantification were limited to megaprojects other than metro rail projects. Efforts to quantitatively study and analyze the impact of project complexity on metro rail projects are left unattended. The developed PCI model and its validation contribute to the field by providing a definite method to measure and manage complexity in metro rail projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Hong Zhou, Binwei Gao, Shilong Tang, Bing Li and Shuyu Wang

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly…

Abstract

Purpose

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly promote the overall performance of the project life cycle. The miss of clauses may result in a failure to match with standard contracts. If the contract, modified by the owner, omits key clauses, potential disputes may lead to contractors paying substantial compensation. Therefore, the identification of construction project contract missing clauses has heavily relied on the manual review technique, which is inefficient and highly restricted by personnel experience. The existing intelligent means only work for the contract query and storage. It is urgent to raise the level of intelligence for contract clause management. Therefore, this paper aims to propose an intelligent method to detect construction project contract missing clauses based on Natural Language Processing (NLP) and deep learning technology.

Design/methodology/approach

A complete classification scheme of contract clauses is designed based on NLP. First, construction contract texts are pre-processed and converted from unstructured natural language into structured digital vector form. Following the initial categorization, a multi-label classification of long text construction contract clauses is designed to preliminary identify whether the clause labels are missing. After the multi-label clause missing detection, the authors implement a clause similarity algorithm by creatively integrating the image detection thought, MatchPyramid model, with BERT to identify missing substantial content in the contract clauses.

Findings

1,322 construction project contracts were tested. Results showed that the accuracy of multi-label classification could reach 93%, the accuracy of similarity matching can reach 83%, and the recall rate and F1 mean of both can reach more than 0.7. The experimental results verify the feasibility of intelligently detecting contract risk through the NLP-based method to some extent.

Originality/value

NLP is adept at recognizing textual content and has shown promising results in some contract processing applications. However, the mostly used approaches of its utilization for risk detection in construction contract clauses predominantly are rule-based, which encounter challenges when handling intricate and lengthy engineering contracts. This paper introduces an NLP technique based on deep learning which reduces manual intervention and can autonomously identify and tag types of contractual deficiencies, aligning with the evolving complexities anticipated in future construction contracts. Moreover, this method achieves the recognition of extended contract clause texts. Ultimately, this approach boasts versatility; users simply need to adjust parameters such as segmentation based on language categories to detect omissions in contract clauses of diverse languages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Case study
Publication date: 8 April 2024

Tarun Kumar Soni

After completion of the case study, the students will be able to understand the different risks associated with a business, focusing on price risk and the importance of price risk…

Abstract

Learning outcomes

After completion of the case study, the students will be able to understand the different risks associated with a business, focusing on price risk and the importance of price risk management in business; understand and evaluate the products available for hedging price risk through exchange-traded derivatives in the Indian scenario; and understand and evaluate the different strategies for price risk management through exchange-traded derivatives in the Indian scenario.

Case overview/synopsis

The case study pertains to a small business, M/s Sethi Jewellers. The enterprise is being run by Shri Charan Jeet Sethi and his son Tejinder Sethi. The business is located in Jain Bazar, Jammu, UT, in Northern India. The business was started in 1972 by Charan Jeet’s father. They deal in a wide range of jewelry products and are well-established jewelers known for selling quality ornaments. Tejinder (MBA in marketing) was instrumental in revamping his business recently. Under his leadership, the business has experienced rapid transformation. The business has grown from a one-room shop fully managed by Tejinder’s grandfather to a multistory showroom with several artisans, sales staff and security persons. Through his e-store, Tejinder has a bulk order from a client where the client requires him to accept the order with a small token at the current price and deliver the final product three months from now. Tejinder is in a dilemma about accepting or rejecting the large order. Second, if he accepts, should he buy the entire gold now or wait to buy it later at a lower price? He is also considering hedging the price risk through exchange-traded derivatives. However, he is not entirely sure, as he has a few apprehensions regarding the same, and he is also not fully aware of the process and the instruments he has to use for hedging the price risk on the exchange.

Complexity academic level

The case study is aimed to cater to undergraduate, postgraduate and MBA students in the field of finance. This case study can be used for students interested in commodity derivatives, risk management and market microstructure.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 1: Accounting and finance.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2039

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 9 August 2022

Jingyi Lai, Yongcheng Fu, Yongqiang Chen and Bo Du

Outsourcing is a common practice that is often adopted to reduce costs and enhance capabilities. The underlying logic of a firm's outsourcing strategy is not always evident due to…

Abstract

Purpose

Outsourcing is a common practice that is often adopted to reduce costs and enhance capabilities. The underlying logic of a firm's outsourcing strategy is not always evident due to multiple antecedents with interacting effects. This study identifies critical factors that influence outsourcing strategies and reveals their interactions with empirical evidence from Chinese construction firms.

Design/methodology/approach

The quantitative decision-making trial and evaluation laboratory (DEMATEL) method was applied to analyze the interrelationships among the antecedents of project outsourcing strategies. First, 24 experts from 13 Chinese construction firms were invited to evaluate and score the influence of each factor on the other. Second, the graph theory and matrix tools of DEMATEL were used to quantitatively obtain the causality among factors and the prominence of each factor within the system.

Findings

Among the antecedents, a firm's pursuit of cost efficiency, identity, technological capability and contracting capability are the most prominent factors influencing project outsourcing strategies. For the interactions among these factors, this study reveals that the focal firm's technological capability significantly influences its contracting capability, and they jointly influence the firm's outsourcing practices, the selection of outsourcing vendors and, eventually, its pursuit of cost efficiency. Moreover, legal restrictions in the institutional environment strongly shape this capability–cost efficiency relationship.

Originality/value

Twelve critical factors following different theoretical perspectives at varying levels of analysis were identified from the literature review. By revealing the interrelationships among these factors, this study develops a holistic framework that integrates the transaction cost and capability perspectives for understanding project outsourcing strategies embedded in different institutional environments.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 31 August 2022

Bo Tian, Jiaxin Fu, Yongshun Xu and Longshan Sun

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract…

Abstract

Purpose

The risks and uncertainties of public–private partnership (PPP) projects threaten their sustainability. Contract flexibility, which is based on the theory of incomplete contract and transaction cost, may be a viable solution to this issue. The purpose of this study is to investigate the relationship between contract flexibility and the sustainability performance of PPP projects. The multiple mediating roles of justice perception and cooperation efficiency are assessed, thereby allowing the pathways and conditions to be understood more comprehensively for improving the sustainability performance of PPP projects.

Design/methodology/approach

Nine hypotheses in the proposed research model are tested via structural equation modeling using data acquired from 218 Chinese PPP professionals.

Findings

Results show that contract flexibility positively affects PPP project sustainability performance. Justice perception and cooperation efficiency play direct and sequential mediating roles in this effect.

Originality/value

This study validates that contract flexibility positively impacts the sustainability performance of PPP projects, where justice perception and cooperation efficiency serve direct and sequential mediating roles. The findings of this study contribute to an improved understanding of the effect of contract flexibility on the sustainability performance of PPP projects. Furthermore, they provide important theoretical and practical insights into contract management as well as beneficial information and valuable initiatives for improving the sustainability of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988