Search results

1 – 10 of 248
Article
Publication date: 7 March 2023

Kaiyang Wang, Fangyu Guo, Ruijia Zhou and Liang Qian

In recent years, augmented reality (AR) has shown its potential to assist various construction activities. Its use commonly requires additional refinement to be integrated into…

Abstract

Purpose

In recent years, augmented reality (AR) has shown its potential to assist various construction activities. Its use commonly requires additional refinement to be integrated into the building information modeling (BIM) process. Nevertheless, few studies have investigated AR implementation in BIM-enabled projects because of numerous challenges related to its implementation. This study aims to investigate the implementation of AR in construction and identify the critical mechanisms for implementing BIM-AR successfully.

Design/methodology/approach

A mixed methodology was adopted for this study. First, this work presents a bibliometric analysis covering articles obtained from Scopus database published between 2000 and 2022. A sample size of 65 research papers pertinent to AR in construction was analyzed using VOSviewer software. Second, a participatory case study was conducted for a BIM-enabled project in China to gain insight into how BIM-AR implementation in construction is achieved.

Findings

The findings from the bibliometric analysis show an increasing interest in AR research within construction. The results indicate that AR research focuses on four clusters: real-time communication, project management, construction activities and education. Findings from the case study provide an empirical experience of AR application scenarios in a BIM-enabled project. Concomitantly, 15 critical success factors that influence BIM-AR implementation were finally identified and demonstrated.

Originality/value

This study provides a rich insight into the understanding and awareness of implementing AR. First, the findings are beneficial to construction practitioners and researchers because they provide a concentrated perspective of AR for emerging activities in the construction industry. Second, the results obtained from the case study could provide a useful guide for effectively implementing AR in a BIM-enabled construction project. Overall, this study may stimulate further research on AR-related studies in construction, such as BIM integration, factor analysis and construction education.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 March 2024

Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi and Nan Yang

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This…

Abstract

Purpose

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This paper aims to discover DT deployment patterns and emerging trends in real-life AEC projects.

Design/methodology/approach

A case study methodology was adopted, including individual case analyses and comparative multiple-case analyses.

Findings

The results revealed the temporal distribution of DT in practical AEC projects, specific DT products/software, major project types integrated with digital solutions, DT application areas and project stages and associated project performance. Three distinct patterns in DT adoption have been observed, reflecting the evolution of DT applications, the progression from single to multiple DT integration and alignment with emerging industry requirements. The DT adoption behavior in the studied cases has been examined using the technology-organization-environment-human (TOE + H) framework. Further, eight emerging trend streams for future DT adoption were identified, with “leveraging the diverse features of certain mature DT” being a shared recognition of all studied companies.

Practical implications

This research offers actionable insights for AEC companies, facilitating the development of customized DT implementation roadmaps aligned with organizational needs. Policymakers, industry associations and DT suppliers may leverage these findings for informed decision-making, collaborative educational initiatives and product/service customization.

Originality/value

This research provides empirical evidence of applicable products/software, application areas and project performance. The examination of the TOE + H framework offers a holistic understanding of the collective influences on DT adoption. The identification of emerging trends addresses the evolving demands of the AEC industry in the digital era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 February 2024

Irene Skovgaard-Smith

The purpose of the paper is to propose a shift from the ideal of immersion to a practice of “committed localism” in the ethnographic study of relational work in the…

Abstract

Purpose

The purpose of the paper is to propose a shift from the ideal of immersion to a practice of “committed localism” in the ethnographic study of relational work in the post-bureaucratic and service-based economy.

Design/methodology/approach

The paper is based on ethnographic fieldwork following management consultancy projects in a hospital and a manufacturing company in Denmark. The approach was predicated on committed attention to the everyday of consultancy work activities and associated relational dynamics. This involved being present at the client sites, observing and listening in concrete situations of interaction and engaging in conversations with the multiple actors involved, both external consultants and members of client organisations.

Findings

The paper shows how “committed localism” was practiced in the ethnographic study of management consultancy as it is relationally accomplished in and through concrete situations of interaction between consultants and different actors in client organizations and the associated meaning production of the involved actors.

Originality/value

The paper develops the notion of “committed localism”, originally introduced by George Marcus, into a methodological concept to challenge the conventional ideal of immersion as the hallmark of “proper” ethnography. Such a shift is particularly pertinent for the ethnographic study of relational processes involving multiple actors occupying different positions in the temporary social spaces of contemporary workplaces.

Details

Journal of Organizational Ethnography, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6749

Keywords

Article
Publication date: 25 April 2023

Xu Ren, Jing Xu, Yali Hao and Song Wang

This paper aims to investigate the impact of relationship quality among team members in the project team on knowledge transfer effectiveness and analyze the role of organizational…

Abstract

Purpose

This paper aims to investigate the impact of relationship quality among team members in the project team on knowledge transfer effectiveness and analyze the role of organizational structure in the influencing process.

Design/methodology/approach

The hypotheses are verified by the Structural Equation Modeling (SEM) analysis using Smart PLS 3 software with the data collected from 236 questionnaire samples in Chinese construction industry.

Findings

The results indicate that relationship quality has a direct impact on knowledge transfer in project teams and centralization has a negative impact on relationship quality. Moreover, relationship quality plays a mediating role between centralization and knowledge transfer effectiveness and formalization plays a negative moderating role in the effect of relationship quality on knowledge transfer effectiveness.

Originality/value

This paper studies intra-project knowledge transfer from the perspective of relationship quality of project teams and explores the antecedent and moderating role of organizational structure in the influence of relationship quality on knowledge transfer.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 4 December 2023

Alolote Ibim Amadi

This study aims to investigate ground-related design deficiencies as potential avenues of avoidable cost overruns, discernible from the geotechnical practices of highway agencies…

Abstract

Purpose

This study aims to investigate ground-related design deficiencies as potential avenues of avoidable cost overruns, discernible from the geotechnical practices of highway agencies in the Niger Delta region of Nigeria.

Design/methodology/approach

The study deploys an interpretivist qualitative methodology to provide a detailed descriptive analysis of the design-related geotechnical practices of highway agencies during the pre-contract phase of highway projects. Semi-structured interviews were conducted with in-house professionals, consultants and contractors affiliated with the three highway agencies in the Niger Delta and thematically analysed to identify significant deviations from geotechnical best practices.

Findings

The study outcome shows that during the pre-contract phase, a chain of design-related geotechnical shortcomings has plagued highway projects executed in the Niger Delta. This view of practice uncovered in this study demonstrates a culture of significant deviation from best practice recommendations, which could plausibly contribute to the history of significant project cost overruns recorded in the region.

Originality/value

The study qualitatively spotlights gaps in the practice of highway agencies and reinforces the need for a re-orientation of the attitude to risk management, to give geotechnical concerns a priority in the financial management of highway projects executed in the Niger Delta region of Nigeria.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 15 January 2024

Sol Garrido

This study aims to introduce an alternative model, “volatility, uncertainty, complexity and ambiguity (VUCA), Virtue and Vice” (3V’s), to unleash leadership skills, promote…

478

Abstract

Purpose

This study aims to introduce an alternative model, “volatility, uncertainty, complexity and ambiguity (VUCA), Virtue and Vice” (3V’s), to unleash leadership skills, promote organisational collaborative change and impact sales performance during an unprecedented crisis.

Design/methodology/approach

The methodology outlines action research based on the 3V’s model and its application in an international business-to-business sales organisation during Covid-19. It explores alternative paths informed by play-at-work and Plato’s philosophy applied to work-based-learning. Each action/iteration adds to the model, which becomes more likely appropriate for various situations.

Findings

The 3V’s boosted change implementation and improved sales performance. The 3V’s conceptualised an invitation to immerse oneself in the constant “river of change” (VUCA) and a means of understanding the role of leadership in navigating this change by embracing simple rules: searching for justice (Virtue) and overcoming the barrier of public opinion (Vice).

Research limitations/implications

The 3V’s model is grounded in leadership literature and a sole application, providing real international data relevant to organisations and leaders. This has yet to be evaluated further.

Practical implications

3V’s can enhance the understanding of a leading collaborative change and re-frame team dynamics in post-pandemic times for the broader public.

Social implications

The approach advocated is a practice of “swimming alongside the team”, which should enable empowerment and collaboration rather than a top-down direction. Focussing on leaders who are moral people, this approach becomes a differentiator in a digital world.

Originality/value

This study examines Plato’s philosophy, play-at-work and other leadership theories in a model which prepares organisations to respond to crisis by providing the ability to reflect on human aspects and straightforward, transferable skills.

Details

Journal of Work-Applied Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2205-2062

Keywords

Article
Publication date: 14 December 2023

Ali Al Owad, Neeraj Yadav, Vimal Kumar, Vikas Swarnakar, K. Jayakrishna, Salah Haridy and Vishwas Yadav

Lean Six Sigma (LSS) implementation follows a structured approach called define-measure-analyze-improve-control (DMAIC). Earlier research about its application in emergency…

Abstract

Purpose

Lean Six Sigma (LSS) implementation follows a structured approach called define-measure-analyze-improve-control (DMAIC). Earlier research about its application in emergency healthcare services shows that it requires organizational transformation, which many healthcare setups find difficult. The Kotter change management model facilitates organizational transformation but has not been attempted in LSS settings till now. This study aims to integrate the LSS framework with the Kotter change management model to come up with an integrated framework that will facilitate LSS deployment in emergency health services.

Design/methodology/approach

Two-stage Delphi method was conducted by using a literature review. First, the success factors and barriers of LSS are investigated, especially from an emergency healthcare point of view. The features and benefits of Kotter's change management models are then reviewed. Subsequently, they are integrated to form a framework specific to LSS deployment in an emergency healthcare set-up. The elements of this framework are analyzed using expert opinion ratings. A new framework for LSS deployment in emergency healthcare has been developed, which can prevent failures due to challenges faced by organizations in overcoming resistance to changes.

Findings

The eight steps of the Kotter model such as establishing a sense of urgency, forming a powerful guiding coalition, creating a vision, communicating the vision, empowering others to act on the vision, planning for and creating short-term wins, consolidating improvements and producing still more change, institutionalizing new approaches are derived from the eight common errors that managers make while implementing change in the institution. The study integrated LSS principles and Kotter’s change management model to apply in emergency care units in order to reduce waste and raise the level of service quality provided by healthcare companies.

Research limitations/implications

The present study could contribute knowledge to the literature by providing a framework to integrate lean management and Kotter's change management model for the emergency care unit of the healthcare organization. This framework guides decision-makers and organizations as proper strategies are required for applying lean management practices in any system.

Originality/value

The proposed framework is unique and no other study has prescribed any integrated framework for LSS implementation in emergency healthcare that overcomes resistance to change.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 20 July 2023

Si Yee Tiew, Helena Aman Hashim and Umi Kalsum Zolkafli @ Zulkifly

Various studies have been conducted to explore the factors that are important to be considered for the effectiveness of construction contract administration (CCA) but lack in the…

Abstract

Purpose

Various studies have been conducted to explore the factors that are important to be considered for the effectiveness of construction contract administration (CCA) but lack in the context of graduate architects. The purpose of this study is to identify factors influencing the effectiveness of graduate architects in CCA and possible methods to enhance their work efficiency through developing the relevant skills in a changing construction environment.

Design/methodology/approach

This paper identified the factors that influence the effectiveness of graduate architects in CCA through the quantitative methods. General skill elements that are perceived as essential for the effectiveness of CCA had been investigated through a survey of graduate architects in the construction industry. One hundred and twenty-seven completed questionnaires returned were analyzed and tested using descriptive analysis and relative important index (RII).

Findings

The result from the study showed that the factors influencing the effectiveness of graduate architects as CCA are building construction skills, design management skills, project management skills, soft skills and dispute resolution skills.

Originality/value

The contribution of this study can be utilized for developing models/tools in the future that would improve the work performance of graduate architects in CCA. Educators may utilize this study to improve their syllabus to cater to the market's demand and facilitate students' entry into the labor market.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 22 November 2023

Christopher Owen Cox and Hamid Pasaei

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in…

Abstract

Purpose

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in nature arising from interactions between participants. These intangible risks can emerge in any project setting but especially in project settings having diversity of cultures, customs, beliefs and traditions of various companies or countries. This paper provides an objective framework to address these intangible risks.

Study design/methodology/approach

This paper presents a structured approach to identify, assess and manage intangible risks to enhance a project team’s ability to meet its objectives. The authors propose a user-friendly framework, Intangible Risk Assessment Methodology for Projects (IRAMP), to address these risks and the factors that cause them. Meta-network (e.g., a network of networks) simulation and established social network analysis (SNA) measures provide a quantitative assessment and ranking of causal events and their influence on the intangible behavior centric risks.

Findings

The proposed IRAMP and meta-network approach were utilized to examine the project delivery process of an international energy firm. Data were gathered using structured interviews, surveys and project team workshops. The use of the IRAMP to highlight intangible risk areas underpinned by the SNA measures led to changes in the company’s organizational structure to enhance project delivery effectiveness.

Originality/value

This work extends the existing project risk management literature by providing a novel objective approach to identify and quantify behavior centric intangible risks and the conditions that cause them to emerge.

Details

International Journal of Industrial Engineering and Operations Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2690-6090

Keywords

Article
Publication date: 28 July 2023

Nyamagere Gladys Sospeter

The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost…

Abstract

Purpose

The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost. Accordingly, it is expected that these design documents must be of high quality to engender the attainment of the desired project objectives. The purpose of this study is to analyze the factors that affect the quality of design documentation in construction projects in the context of a developing country.

Design/methodology/approach

This study used a descriptive research design involving professionals from firms offering services in areas of design and documentation, mainly architectural, quantity surveying and engineering. A total of 80 out of 84 questionnaires were received and analyzed using IBM SPSS Statistics Version 25, and a factor analysis approach was used to categorize the factors into smaller five groups.

Findings

The factors were subsequently categorized according to size, time, staff, quality and training-related factors. Collectively, large size of the project, inadequate supervision of junior design staff, low professional fees, procurement process and system, failure to adopt quality management systems and allocation or assigning of staff to more than one project at the same time have high influence (component loading of 700) in respective groups.

Research limitations/implications

The reliance on data to analyze the factors of design documents in construction projects in developing economies context, using a Tanzanian exemplar, is considered a limitation. Developing countries with similar economic characteristics, procurement systems and cultural setup could benefit from the results of this study.

Practical implications

The study of factors affecting quality of design and documents in construction projects serves as a guide for built environment firms in Tanzania in conducting effective business and ensuring quality design documents, hence improved project performance. Understanding the nature of relationship between the design and construction teams as well as the impact of design documents on project performance is of great importance for the design teams of future projects and other decision-makers to pay attention when preparing design and related documents, especially during design stage of construction projects in developing countries.

Originality/value

The study contributes the knowledge by providing useful insights on the subject through a categorization of the factors affecting the quality of design documentation and exploring the nature of relationship between the design and construction teams in construction projects within a previously unexplored Tanzanian context focusing on a traditional procurement system for future improvement of project delivery, hence project success.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of 248