Article
Publication date: 21 November 2023

Tianyao Ping, Wei Pan and Zhiqian Zhang

Modular construction is an innovative method that enhances the performance of building construction projects. However, the performance of steel modular construction has not been…

Abstract

Purpose

Modular construction is an innovative method that enhances the performance of building construction projects. However, the performance of steel modular construction has not been systematically understood, and the existing measurement methods exhibit limitations in effectively addressing the features of steel modular building construction. Therefore, this study aims to develop a new performance measurement framework for systematically examining the performance of steel modular construction in building projects.

Design/methodology/approach

This study was conducted through a mixed-method research design that combines a comprehensive review of the state-of-the-art practices of construction performance measurement and a case study with a 17-story steel modular apartment building project in Hong Kong. The case project was measured with data collected from the project teams and other reliable channels, and the measurement practices and findings were referenced to establish a systematic performance measurement framework for steel modular construction.

Findings

Considering steel modular construction as a complex socio-technical system, a systematic performance measurement framework was developed, which considers the features of steel modular construction, focuses on the construction stage, incorporates the views of various stakeholders, integrates generic and specific key performance indicators and provides a benchmarking process. Multifaceted benefits of adopting steel modular construction were demonstrated with case study, including improved economic efficiency (e.g. nearly 10% cost savings), improved environmental friendliness (e.g. approximately 90% waste reduction) and enhanced social welfare (e.g. over 60% delivery trips reduction).

Originality/value

This paper extends the existing performance measurement methods with a new framework proposed and offers experience for future steel modular construction. The measured performance of the case project also contributes in-depth understanding on steel modular construction with benefits demonstrated. The study is expected to accelerate an effective uptake of steel modular construction in building projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 January 2024

Frank Ato Ghansah and Weisheng Lu

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the…

Abstract

Purpose

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.

Design/methodology/approach

This is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.

Findings

The study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.

Practical implications

The findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.

Originality/value

The study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 December 2022

Biyanka Ekanayake, Alireza Ahmadian Fard Fini, Johnny Kwok Wai Wong and Peter Smith

Recognising the as-built state of construction elements is crucial for construction progress monitoring. Construction scholars have used computer vision-based algorithms to…

Abstract

Purpose

Recognising the as-built state of construction elements is crucial for construction progress monitoring. Construction scholars have used computer vision-based algorithms to automate this process. Robust object recognition from indoor site images has been inhibited by technical challenges related to indoor objects, lighting conditions and camera positioning. Compared with traditional machine learning algorithms, one-stage detector deep learning (DL) algorithms can prioritise the inference speed, enable real-time accurate object detection and classification. This study aims to present a DL-based approach to facilitate the as-built state recognition of indoor construction works.

Design/methodology/approach

The one-stage DL-based approach was built upon YOLO version 4 (YOLOv4) algorithm using transfer learning with few hyperparameters customised and trained in the Google Colab virtual machine. The process of framing, insulation and drywall installation of indoor partitions was selected as the as-built scenario. For training, images were captured from two indoor sites with publicly available online images.

Findings

The DL model reported a best-trained weight with a mean average precision of 92% and an average loss of 0.83. Compared to previous studies, the automation level of this study is high due to the use of fixed time-lapse cameras for data collection and zero manual intervention from the pre-processing algorithms to enhance visual quality of indoor images.

Originality/value

This study extends the application of DL models for recognising as-built state of indoor construction works upon providing training images. Presenting a workflow on training DL models in a virtual machine platform by reducing the computational complexities associated with DL models is also materialised.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 July 2023

Christiana Ada Adah, Douglas Omoregie Aghimien and Olalekan Oshodi

The nature of construction works has a negative impact on physical, mental and emotional well-being and makes it difficult for the construction industry to attack and retain its…

Abstract

Purpose

The nature of construction works has a negative impact on physical, mental and emotional well-being and makes it difficult for the construction industry to attack and retain its workforce. The current study seeks to integrate the current knowledge focused on work–life balance (WLB) in the industry into an understandable whole.

Design/methodology/approach

An interpretivist philosophical approach was adopted using a bibliometric review and a narrative review of existing studies from both Scopus and Google databases. The Visualisation of Similarities viewer (VOSviewer) was used to prepare co-occurrence maps from the bibliographic data garnered.

Findings

The study reveals that the prominent factors influencing the WLB of the construction workforce are organizational culture, salary earned, heavy workload, long working hours and inflexible working time. The recent WLB discourse is on organisational commitment, job satisfaction and workplace dynamics. While WLB areas for further exploration are job stress, safety performance, employee attrition and an ageing workforce. Meanwhile, Africa and South America are still lagging in WLB research.

Practical implications

The findings reported here will assist stakeholders in identifying appropriate WLB initiatives that can be used to improve the well-being of the construction workforce. Also, the gaps in knowledge for further research were highlighted.

Originality/value

The findings reveal current trends and a road map for future studies on WLB in construction. It also reveals prominent factors influencing the WLB of workers in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 January 2024

N. Aishah Abdul-Rahman, Rahimi A. Rahman and Ahmad Rizal Alias

This study aims to develop an interrelation model between critical parameters for assessing the construction readiness (CR) of abandoned housing projects, using Malaysia as a case…

Abstract

Purpose

This study aims to develop an interrelation model between critical parameters for assessing the construction readiness (CR) of abandoned housing projects, using Malaysia as a case study. To achieve that aim, the study objectives are to (1) identify critical parameters for assessing the CR of abandoned housing projects; (2) develop underlying constructs to categorize interrelated critical parameters and (3) assess the influence of the underlying constructs on the CR of abandoned housing projects.

Design/methodology/approach

This study identifies potential parameters for assessing the CR of abandoned housing projects by reviewing existing literature and interviewing industry professionals. Then, the list was used to develop a questionnaire survey. The collected survey data were analyzed using normalized mean analysis to identify the critical parameters. Exploratory factor analysis (EFA) was used to develop underlying constructs to categorize interrelated critical parameters. Finally, the influence of the underlying constructs on the CR of abandoned housing projects was examined through partial least squares structural equation modeling (PLS-SEM).

Findings

The analyses suggest that 21 critical parameters are affecting the CR of abandoned housing projects. The critical parameters can be categorized into four underlying constructs: construction site evaluation, management verification, uncertainties mitigation and document approval. Finally, the analyses confirmed that all four constructs affect the CR of abandoned housing projects.

Originality/value

This study is a pioneering effort to quantitatively analyze the parameters for assessing the CR of abandoned housing projects. The findings significantly benefit researchers and industry professionals by providing a list of critical parameters associated with the CR of abandoned housing projects.

Details

Open House International, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 31 January 2023

Shuvo Dip Datta, Md. Habibur Rahman Sobuz, Mohammad Nafe Assafi, Norsuzailina Mohamed Sutan, Md. Nazrul Islam, Maria Binte Mannan, Abu Sayed Mohammad Akid and Noor Md. Sadiqul Hasan

This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.

Abstract

Purpose

This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.

Design/methodology/approach

This study identified 41 major problematic factors from the related literature. In this research, a detailed questionnaire survey was conducted among the experts and stakeholders of the construction industry of Bangladesh. The survey was carried out on a Likert scale and ranked the critical factors using the relative importance index (RII). The 41 problematic factors were divided into five group factors and ranked by the RII index to prioritize the factors. Finally, stakeholders' opinions were analyzed with the critical assessed factors, which was a very effective technique to eliminate the risks and uncertain occurrences in the construction industry of Bangladesh.

Findings

The factors analysis revealed that cost overrun, traffic jam, low wedges, slow payment for completed works and financial issues of the owner were leading critical factors in construction projects. Moreover, the critical factors are divided into five-factor groups, namely, financial management, monitoring and feedback, competency management, communication and coordination management, and risk management, which exhibit 0.767, 0.720, 0.711, 0.710 and 0.658 RII values. After all, the stakeholders' opinion suggested that implementing modern tools and techniques can help to avoid the critical situation in the construction industry of Bangladesh.

Practical implications

The construction industry of Bangladesh is moving away from stable construction work day by day. Previously, the potential CSFs were discussed unstructured way. Hence, detecting early warning signals in a structured way has become necessary for the building firm's survival.

Originality/value

Though some scattered critical issues are discussed in different literature, the critical issues of the Bangladeshi construction industry were not investigated extensively. Therefore, this study finds out the potential critical issues of the construction industry of Bangladesh to accumulate such harmful construction issues in a single platform so that the construction industry can have an overview of them with the help of innovative technologies.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 26 March 2024

Frank Ato Ghansah and Weisheng Lu

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of…

Abstract

Purpose

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of Cross-border Construction Logistics and Supply Chain (Cb-CLSC). However, prior studies on the pandemic in the construction project industry have not revealed how CMMs have impacted QA. Thus, this study aims to evaluate the impact of the CMMs on the QA of Cb-CLSC.

Design/methodology/approach

This is achieved by adopting an embedded mixed-method approach involving a desk literature review and engaging 150 experts from different economies across the globe using expert surveys, and results verified via semi-structured expert interviews. Structural equation modelling-based multiple regression analysis (SEM-MRA) was integrated to examine the impact of the CMMs on the QA, along with descriptive and content analysis.

Findings

The study confirmed that CMMs have not only impacted the QA negatively but also influenced the positioning of the QA for the post-pandemic era and probably to survive the risks of future pandemics. Among all the identified CMMs, the top three critical measures include “lockdown (CMM2)”, “use of personal protective equipment, such as nose masks, disinfects, etc. (CMM5)”, and “electronic/virtual meetings (CMM7)”. However, CMM5 possesses the highest contributory power to form CMM in impacting the QA, and this can be regarded as largely positive by strengthening health and safety management systems. Its negative impact lies with the project cost increment and the inconveniences of using nose and face masks.

Practical implications

This study provides a better understanding to construction practitioners and policy makers on how the pandemic policies, i.e. CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics.

Originality/value

The study contributes to knowledge in that it provides a better understanding of how the pandemic policies, such as CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics. This area of study has been given limited attention among prior studies during the pandemic.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 12 April 2022

Mohammad Nafe Assafi, Md. Ikramul Hoque and Md. Mehrab Hossain

Construction delay always causes massive damage to the advancing construction industries, which is no different in the case of Bangladeshi construction industries. This paper aims…

Abstract

Purpose

Construction delay always causes massive damage to the advancing construction industries, which is no different in the case of Bangladeshi construction industries. This paper aims to investigate the major delay factors causing construction delays in public-funded, mixed and private-funded construction projects of Bangladesh. Also, it offers preventive suggestions from expert stakeholders to reduce the recurrence of delays.

Design/methodology/approach

At first, an extensive literature review was conducted to identify the thirty-seven major delay factors categorized under seven groups. A questionnaire was then developed for survey at ongoing construction projects at a different division of Bangladesh. Next, data from 110 respondents were collected, and the delay factors were ranked based on the Relative Importance Index (RII); lastly, probable solutions were suggested for top-ranked delay factors based on opinions from expert stakeholders in the construction sector of Bangladesh.

Findings

The overall RII ranking of the 37 delay factors showed “Construction mistakes and defective work,” “Contract modifications by the client” and “Adverse weather condition” as the top three factors causing the delay. For public-funded projects, “Construction mistakes and defective work” and “Slow decision making by a consultant” are the top delay factors. For mixed projects, “Slow decision making of the client” and “Construction mistakes and defective work ranked top, and for private-funded projects, “Financial problems and payment delay of the client” and “Adverse weather condition” ranked top. These nuances of ranking in individual project types ascertain that the causes of delay vary in terms of project features.

Practical implications

The outcome of this project will help identify the significant delay factors based on their severity of effectiveness associated with public-funded, mixed and private-funded projects in Bangladesh. The suggestions regarding preventing these delay factors obtained through the opinions of expert stakeholders can help reduce the effect of these delays in the context of Bangladesh and in countries where the similarity in construction environment prevails.

Originality/value

Previously, studies on construction delays in Bangladesh focused mainly on identifying the delays using qualitative analysis techniques. This study is based on a unique methodology of integrating quantitative research on delay factor identification and qualitative research on preventive measures following the opinions gathered from expert stakeholders in the construction sector.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 9 March 2023

Frederick Owusu Danso, Kofi Agyekum, Patrick Manu, Emmanuel Adinyira, Divine K. Ahadzie and Edward Badu

Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences…

Abstract

Purpose

Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences site workers' risk-taking behaviours during construction. This study aims to examine how construction site workers perceive and judge safety risks in risk-taking behaviours of site workers for intervention safety policy framework that may encourage safe work.

Design/methodology/approach

The study employed Pictorial-based Q-Methodology, which documented 63 picture scenarios of risk-taking behaviours from building sites and submitted them for validation from H&S inspectors. In total, 33 pictures emerged as having great potential to cause harm. After using these 33 pictures to elicit data from randomised site workers, the study used Frequency Tabulation, Relative Importance Index (RII) and Kruskal–Wallis Test to analyse the collected data. To fully explain the analysed data for deeper understanding, the study conducted Focus Group Discussions (FGDs) with these site workers to share the thoughts of site workers on these pictures.

Findings

Two distinctive pictures emerged from these analyses: one showing risk-taking behaviour likely to contract internal and skin disease and the other likely to fall from height. One of the implications is that construction site workers are unfamiliar with the dangerous contaminants in the materials the site workers use to work, which can potentially harm the site workers' skin and internal organs. Hence, site workers continue engaging in risk-taking behaviours. The other is that site workers are aware of and can mention catastrophic physical injuries attached to site workers' jobs. However, site workers continue engaging in risk-taking behaviours because of site workers' safety plights and rely on the favour and mercies of a supreme being as coping strategies to escape from these physical injuries.

Originality/value

This study is original in that the study uses picture scenarios of risk-taking behaviours to amass an empirical-based understanding of how site workers perceive and respond to H&S risks during construction. This piece of evidence is missing in the numerous research studies in this area. Again, the findings contribute to the state-of-the-art literature regarding risk-taking behaviours on construction sites.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 July 2023

Aziz Yousif Shaikh, Robert Osei- kyei, Mary Hardie and Matt Stevens

This paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to…

Abstract

Purpose

This paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to the existing but limited understanding of teamwork drivers on construction workers’ safety performance. This paper presents scholars and industry-based professionals with critical initiatives that have to be implemented in organisations to get positive results in safety while working in teams with an emphasis on systems drivers of teamwork on safety performance at the organisational level, which will help in providing information on the functioning of the teams and contribute towards improved safety performance of team workers.

Design/methodology/approach

This study aims to systematically examine the existing body of knowledge on drivers of teamwork by analysing 53 publications from the years 1997–2021. The Scopus search engine was used to conduct a systematic review and germane publications were collated.

Findings

According to the findings of the review, since 1997, there has been a burgeoning concern in the research of drivers of teamwork and its impact on workers’ safety performance. After performing a systematic review, 37 drivers of teamwork were identified. The top five drivers are effective communications, team workers’ relations, leadership, shared knowledge and information, and team training. Moreover, it was noted that the United States and Australia have been the international regions of focus for most of the research in the area of drivers of teamwork from the years 1997–2021. The 37 drivers of teamwork are distributed into six major socio-technical components: people drivers; culture drivers; metrics drivers; organisational and management practices and procedures drivers; infrastructure drivers and technology drivers.

Practical implications

The results reported present research scholars and professional practitioners with an overview of the drivers of teamwork that could be implemented in the construction industry to streamline potential implementations and improve safety performance of construction workers.

Originality/value

A list of teamwork drivers has been developed to ratify potential empirical research in the area of construction safety. The results would contribute to the existing but restricted understanding of drivers of teamwork in the construction industry.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords