Search results

1 – 10 of over 1000
Article
Publication date: 13 October 2022

Arka Ghosh, Jemal Abawajy and Morshed Chowdhury

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the…

Abstract

Purpose

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the effective utilisation of emergent digital technologies and a need for a managerial shift for its smooth adoption.

Design/methodology/approach

A total of 3,046 peer-reviewed journal review articles covering Internet of Things (IoT), blockchain, building information modelling (BIM) and digital technologies within the construction sector were reviewed using scientometric mapping and weighted mind-map analysis techniques.

Findings

Prominent research clusters identified were: practice-factor-strategy, system, sustainability, BIM and construction worker safety. Leading countries, authors, institutions and their collaborative networks were identified with the UK, the USA, China and Australia leading this field of research. A conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Originality/value

The study traces the origins of the initial application of Industry 4.0 concepts in the construction field and reviews available literature from 1983 to 2021. It raises awareness of the latest developments and potential landscape realignment of the construction industry through digital technologies conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 April 2024

Longhui Liao, Yuehua Ye, Nana Wei, Hong Li and Cheng Fan

Problems such as information asymmetry and a lack of trust among construction practitioners damage the quality and progress of construction projects. The decentralization…

Abstract

Purpose

Problems such as information asymmetry and a lack of trust among construction practitioners damage the quality and progress of construction projects. The decentralization, transparency, traceability and temper-proof nature of blockchain technology (BCT) can provide solutions and facilitate multiparty cooperation. However, BCT acceptance in the construction industry is relatively low, and there are few pilot projects adopting BCT. Most relevant literature focuses on BCT acceptance at the industry and organizational levels, but the impact of non-managerial practitioners executing BCT or the traditional approach in day-to-day work tends to be disregarded. This study aims to establish a theoretical model of BCT acceptance, identify key influencing factors and paths of behavioral intention to adopt BCT and promote strategies to enhance BCT adoption.

Design/methodology/approach

A new BCT acceptance model for construction practitioners was proposed. A survey was performed with 203 construction practitioners in Shenzhen, China and post-survey interviews were conducted with four BCT experts for validation. Covariance-based structural equation modeling was used to examine the influence paths and moderating effect analysis was performed to check practitioners’ differential perceptions.

Findings

Performance expectancy, social influence, facilitating conditions and perceived behavioral control significantly and positively influence behavioral intention to accept BCT, while impacts from effort performance and risk are negative. Overcoming obstacles related to the effort required for BCT adoption and effective risk management will be essential to unlocking BCT’s transformative potential. Then, the moderating effects of respondents’ gender, degree and BCT knowledge as well as the project type involved were analyzed. Continued adoption of BCT in the construction industry has the potential to revolutionize project management, transparency and trust among stakeholders.

Research limitations/implications

The findings of this research can help practitioners and government agencies understand crucial influencing factors and pathways of BCT acceptance. Targeted measures, such as increasing practitioners’ benefits and sense of BCT usefulness, conducting pilot projects and increasing publicity, were proposed for project leadership teams to enhance BCT adoption. This may lead to increased efficiency, reduced disputes and more streamlined and secure construction processes, ultimately enhancing the industry’s overall performance.

Originality/value

Few studies have explored BCT acceptance from the perspective of non-managerial construction practitioners. The BCT acceptance model proposed in this study is a novel adaptation of previous technology acceptance models, with new factors (risk and perceived behavioral control) and moderating variables (degree, BCT knowledge and project type) added for better understanding of non-managerial practitioners’ perceptions and differences.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 December 2022

Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…

Abstract

Purpose

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.

Design/methodology/approach

Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.

Findings

The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.

Originality/value

The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 3 April 2024

Lili Gao, Xicheng Zhang, Xiaopeng Deng, Na Zhang and Ying Lu

This study aims to investigate the relationship between individual-level psychological resources and team resilience in the context of expatriate project management teams. It…

Abstract

Purpose

This study aims to investigate the relationship between individual-level psychological resources and team resilience in the context of expatriate project management teams. It seeks to understand how personal psychological resources contribute to team resilience and explore the dynamic evolution mechanism of team resilience. The goal is to enhance team resilience among expatriates in a BANI (Brittle, Anxious, Nonlinear, and Incomprehensible) world, where organizations face volatile and uncertain conditions.

Design/methodology/approach

An online survey was applied for data collection, and 315 valid samples from Chinese expatriates in international construction projects were utilized for data analysis. A structural equation model (SEM) examines the relationships between personal psychological resources and team resilience. The study identifies five psychological factors influencing team resilience: Employee Resilience, Cross-cultural Adjustment, Self-efficacy, Social Support, and Team Climate. The hypothesized relationships are validated through the SEM analysis. Additionally, a fuzzy cognitive map (FCM) is constructed to explore the dynamic mechanism of team resilience formation based on the results of the SEM.

Findings

The SEM analysis confirms that employee resilience, cross-cultural adjustment, and team climate positively impact team resilience. Social support and self-efficacy also have positive effects on team climate. Moreover, team climate is found to fully mediate the relationship between self-efficacy and team resilience, as well as between social support and team resilience. The FCM model provides further insights into the dynamic evolution of team resilience, highlighting the varying impact effects of antecedents during the team resilience development process and the effectiveness of different combinations of intervention strategies.

Originality/value

This study contributes to understanding team resilience by identifying the psychological factors influencing team resilience in expatriate project management teams. The findings emphasize the importance of social support and team climate in promoting team resilience. Interventions targeting team climate are found to facilitate the rapid development of team resilience. In contrast, interventions for social support are necessary for sustainable, long-term high levels of team resilience. Based on the dynamic simulation results, strategies for cultivating team resilience through external intervention and internal adjustment are proposed, focusing on social support and team climate. Implementing these strategies can enhance project management team resilience and improve the core competitiveness of contractors in the BANI era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 April 2024

Wenwei Huang, Deyu Zhong and Yanlin Chen

Construction enterprises are achieving the goal of production safety by increasingly focusing on the critical factor of “human” and the impact of individual characteristics on…

Abstract

Purpose

Construction enterprises are achieving the goal of production safety by increasingly focusing on the critical factor of “human” and the impact of individual characteristics on safety performance. Emotional intelligence is categorized into three models: skill-based, trait-based and emotional learning systems. However, the mechanism of action and the internal relationship between emotional intelligence and safety performance must be further studied. This study intends to examine the internal mechanism of emotional intelligence on safety performance in construction projects, which would contribute to the safety management of construction enterprises.

Design/methodology/approach

A structural equation model exploring the relationship between emotional intelligence and safety performance is developed, with political skill introduced as an independent dimension, situational awareness presented as a mediator, and management safety commitment introduced as a moderator. Data were collected by a random questionnaire and analyzed by SPSS 24.0 and AMOS 26.0. The structural equation model tested the mediation hypothesis, and the PROCESS macro program tested the moderated mediation hypothesis.

Findings

The results showed that construction workers' emotional intelligence directly correlates with safety performance, and situational awareness plays a mediating role in the relationship between emotional intelligence and the safety performance of construction workers. Management safety commitment weakens the positive predictive relationships between emotional intelligence and situational awareness and between emotional intelligence and safety performance.

Originality/value

This research reveals a possible impact of emotional intelligence on safety performance. Adding political skills to the skill-based model of emotional intelligence received a test pass. Political skill measures the sincere and cooperative skills of construction workers. Using people as a critical element plays a role in the benign mechanism of “Emotional Intelligence – Situational Awareness – Safety Performance.” Improving emotional intelligence skills through training, enhancing situational awareness, understanding, anticipation and coordination and activating management environment factors can improve safety performance. Construction enterprises should evaluate and train workers' emotional intelligence to improve workers' situational awareness and safety performance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects…

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 April 2024

Deraniyagalage Chanaka Karunarathna, H.A.H.P. Perera, B.A.K.S. Perera and P.A.P.V.D.S. Disaratna

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with…

Abstract

Purpose

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with resource allocation. Thus, this study investigates the influence of delay in utility shifting for extension of time claims in road construction projects (RCPs) in Sri Lanka.

Design/methodology/approach

The study used a quantitative approach with three rounds of Delphi surveys to gather empirical data. Further, the probability impact assessment was used to carefully analyse the data and appraise the information gathered.

Findings

The findings initially revealed 33 causes of delays in utility shifting for extension of time claims in RCPs in Sri Lanka. Ultimately, 11 severe causes were identified based on their high probability and impact, concluding with 45 strategies that were assigned to overcoming those most severe causes of delay.

Originality/value

This study will contribute to the industry and theory by providing solutions to handle utility-shifting delays with the linkage of preventing time extension claims for RCPs in Sri Lanka. Further, there is a dearth of literature in the research area, both locally and globally. Thus, the findings of this research will provide a benchmark for further detailed studies in other countries as well.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 3 April 2024

Michael Nii Addy, Evans Teye Addo, Sulemana Fatoama Abdulai, Titus Ebenezer Kwofie, Clinton Ohis Aigbavboa and Anita Odame Adade-Boateng

E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement…

Abstract

Purpose

E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement acceptance in the public sector of Ghana’s construction industry (GCI). Using an extended unified theory of acceptance and use of technology (UTAUT 2), variables that promote the acceptance of e-procurement in GCI were explored.

Design/methodology/approach

Data was collected using a mixed method strategy. In the first stage, a semi-structured interview was used to collect, assess and optimize the UTAUT2 model. Thematic analysis was used on the qualitative data, leading to modification of the proposed UTAUT2 model. The study subsequently used a questionnaire survey using the extended UTAUT2 model. Survey data was analyzed using structural equation modelling (SEM), leading to the identification and validation of factors that facilitate e-procurement acceptance in Ghanaian construction as well as the impact of these factors.

Findings

The findings of the study reveal that five independent constructs of the proposed UTAUT2 model significantly affects the behavioural intention of practitioners to accept and use e-procurement in the construction industry in Ghana.

Practical implications

The study will be of utility to government agencies, contracting organizations and other construction stakeholders in developing policy and programmes to support e-procurement acceptance within the sector.

Originality/value

This is a new extended UTAUT2 model that is applicable to technology acceptance within the public sector in sub-Saharan Africa.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of over 1000