Search results
1 – 10 of over 1000Xinnan Liu, Jiani Meng, Jiayi Wang and Yingbo Ji
This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated…
Abstract
Purpose
This study adopts the perspective of dynamic capabilities to investigate influencing factors and proposes improvement strategies of supply chain resilience of prefabricated construction.
Design/methodology/approach
The structural equation model (SEM) is used to identify and verify the relationship between factors influencing supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. The system dynamics (SD) model is constructed to dynamically simulate the specific effects of different influencing factors.
Findings
Results indicate that: (1) An evaluation index system for supply chain resilience of prefabricated construction containing five first-level indicators and 36 second-level indicators is constructed; (2) Ability to anticipate, ability to respond, ability to adapt, ability to recover and ability to learn are positively correlated with the supply chain resilience of prefabricated construction and (3) ANT3 (information system), RES1 (quick response), ADA3 (buffer stock) and LEA4 (trust) are the most leading factors influencing supply chain resilience of prefabricated construction over time.
Originality/value
This study fulfills the need for an in-depth exploration of the various influencing factors on supply chain resilience of prefabricated construction from the perspective of dynamic capabilities. Furthermore, this study provides improvement strategies to enhance supply chain resilience of prefabricated construction in China.
Details
Keywords
Binchao Deng, Xindong Lv, Yaling Du, Xiaoyu Li and Yilin Yin
Inefficiency dilemmas in project governance are caused by various risks arising from the characteristic of construction supply chain projects, such as poor project performance…
Abstract
Purpose
Inefficiency dilemmas in project governance are caused by various risks arising from the characteristic of construction supply chain projects, such as poor project performance, conflicts between stakeholders and cost overrun. This research aims to establish a fuzzy synthetic evaluation (FSE) model to analyze construction supply chain risk factors. Corresponding risk mitigation strategies are provided to facilitate the improvement performance of ongoing construction supply chain projects.
Design/methodology/approach
A literature review is utilized to reveal the deficiencies of construction supply chain risk management. Thus, a total of five hundred (500) questionnaires are distributed to construction professionals, and four hundred and thirty-five (435) questionnaires are recovered to obtain the evaluation data of construction professionals on critical risk factors. Additionally, the FSE is used to analyze and rank the significance of critical risk factors. Finally, this research discusses nine critical risk factors with high weight in the model, and explains the reason for the significance of critical risk factors in the construction supply chain.
Findings
The questionnaire results show that the thirty-one (31) identified critical risk factors are verified by related practitioners (government departments, universities and research institutions, owners, construction units, financial institutions, design units, consulting firms). Thirty-one (31) identified critical risk factors are divided into common risks, risks from contractors and risks from owners. The most significant factors in the three categories, respectively, are “political risks,” “owner's unprofessional” approach and “cash flow.” Managing these risks can facilitate the development of the construction supply chain.
Originality/value
This paper expands the research perspective of construction supply chain risk management and complements the risks in the construction supply chain. For practitioners, the research result provides some corresponding measures to deal with these risks. For researchers, the research result provides the direction of construction supply chain risk treatment.
Details
Keywords
Richard Kadan and Jan Andries Wium
Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to…
Abstract
Purpose
Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to identify the dominant construction supply chain risk (CSCR) factors, based on studies conducted between 2002 and 2022.
Design/methodology/approach
The study adopts the preferred reporting items for systematic reviews and meta-analysis (PRISMA) procedure to identify, screen and select relevant articles in order to provide a bibliography and annotation of the prevalent risks in the supply chains. A descriptive analysis of the findings then follows.
Findings
The study’s findings have highlighted the three most prevalent risks in the construction supply chain (poor communication across project teams, changes in foreign currency rate, unfavorable climate conditions) as reported in literature, that project teams need to pay closer attention to and take proactive steps to mitigate.
Research limitations/implications
Due to limitations imposed by the chosen research methodology, tools, time frame and article availability, the study was unable to examine all CSCR-related papers.
Practical implications
The results will serve as a useful roadmap for risk/supply chain managers in the construction industry to take strategically proactive steps towards allocating resources for CSCR mitigation efforts.
Social implications
Context-specific research on the impact of social and cultural risks on the construction supply chain would be beneficial, due to emerging social network risk factors and the complex socio-cultural settings.
Originality/value
There is presently no study that has reviewed extant studies to identify and compile the dominant risk factors (DRFs) associated with the supply chain of construction projects for ranking in the supply chain risk management process.
Details
Keywords
Chigozie Collins Okafor, Ugochukwu Sydney Ani and Onuegbu Ugwu
Recent studies on construction supply chain management (CSCM) evaluated its vulnerability and challenging factors, but studies that have identified and examined the possible…
Abstract
Purpose
Recent studies on construction supply chain management (CSCM) evaluated its vulnerability and challenging factors, but studies that have identified and examined the possible corrective measures of CSCM are rare. This study sets out to bridge this gap by identifying and evaluating the most effective CSCM corrective measures that will benefit the global construction industry.
Design/methodology/approach
A methodology was designed to obtain the corrective measures of CSCM. Data were collected from 68 experts who served as research participants in this study, through a questionnaire survey and were analyzed statistically using the severity index analysis, Mann–Whitney test and factor analysis which includes KMO and Barlett's test, commonalities, total variance pattern matrix.
Findings
The findings of the study revealed that free exchange of information between parties from both suppliers and site/firm is the best CSCM corrective measures, according to the research participant's opinion using the severity index analysis. Further analysis revealed seven underlying factors of CSCM corrective measures.
Practical implications
The findings of this study have identified the most critical solutions to the lapses of CSCM. These will serve as adequate corrective measures to the challenges of CSCM and benefit the global construction industry.
Originality/value
This study contributed seven underlying factors of CSCM corrective measures which can be adopted as adequate corrective measures to the lapses of CSCM. The study further contributed to CSCM research theory.
Details
Keywords
Dan Wang, Jingyi Luo and Yongkun Wang
This paper constructs the uncertainty analysis model of prefabricated building supply chain risk. The model is designed to study the formation path of prefabricated building…
Abstract
Purpose
This paper constructs the uncertainty analysis model of prefabricated building supply chain risk. The model is designed to study the formation path of prefabricated building supply chain risk and is expected to be used by industry stakeholders for supply chain risk management.
Design/methodology/approach
Based on the uncertainty circle model, construct a configuration analysis framework for supply chain risks in prefabricated buildings. The fuzzy set qualitative comparative analysis (fsQCA) is used to study the configuration influence of five uncertain factors, including environment, plan-control, demand-supply, manufacturing and assembly-transportation, on the risk of the prefabricated building supply chain.
Findings
There are three paths to promote the high-risk generation of the prefabricated building supply chain: assembly-transportation-oriented, plan-control-oriented and manufacturing-oriented. There is a specific equivalent substitution relationship among the five causal conditions. Under specific conditions, different combinations of conditions have the same effect on promoting supply chain high-risk generation through equivalent substitution.
Originality/value
The multiple concurrent causal relationships of risk conditions in the assembly construction supply chain are studied under the grouping perspective, which helps to expand the research perspective of assembly construction supply chain risk and provides theoretical guidance for supply chain risk management of construction enterprises.
Details
Keywords
Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…
Abstract
Purpose
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.
Design/methodology/approach
The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.
Findings
The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.
Originality/value
This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.
Details
Keywords
Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, Jorge Ochoa Paniagua, Aparna Samaraweera and Larissa Statsenko
This paper aims to synthesise the latest literature on supply chain operations of offsite manufacturing in the construction industry to identify and evaluate the uncertainties at…
Abstract
Purpose
This paper aims to synthesise the latest literature on supply chain operations of offsite manufacturing in the construction industry to identify and evaluate the uncertainties at each stage of the offsite construction supply chain (OSC-SC) to compile contributions to knowledge and thereby determine the future research directions to improve supply chain resilience (SCR).
Design/methodology/approach
The study was conducted as a systematic literature review. In total, 99 peer-reviewed journal papers published between 2015 and mid-2022 were shortlisted and analysed through the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines.
Findings
The bibliometric analysis revealed that the research focusing on supply chain issues and developing best practices in offsite construction adopt case study approaches to investigate the research problems comprehensively. The content analysis revealed the lack of up-to-date knowledge in the construction workforce regarding OSC; low preparedness for the changes brought by the SC uncertainties; the lack of a proper procurement model for OSC; lack of end-to-end visibility of the supply chain to identify uncertainties and lack of national or government standards on OSC-SC, as some of the key problems instigating the identified the uncertainties.
Originality/value
This study clarifies the current knowledge by systematically presenting uncertainties at each stage of the OSC-SC. Moreover, it provides a framework and proposes that future research should focus specifically on individual/team, organisational, supply chain/network and sector/national/supranational levels to improve SCR.
Details
Keywords
Ibrahim Yahaya Wuni and Derek Asante Abankwa
Circular construction offers sustainable solutions and opportunities to disentangle a project’s life cycle, including demolition, deconstruction and repurposing of architectural…
Abstract
Purpose
Circular construction offers sustainable solutions and opportunities to disentangle a project’s life cycle, including demolition, deconstruction and repurposing of architectural, civil engineering and infrastructure projects from the extraction of natural resources and their wasteful usage. However, it introduces additional layers of novel risks and uncertainties in the delivery of projects. The purpose of this study is to review the relevant literature to discover, classify and theorize the critical risk factors for circular construction projects.
Design/methodology/approach
The paper conducted a systematic literature review to investigate the risks of circular construction projects. It deployed a multistage approach, including literature search and assessment, metadata extraction, citation frequency analysis, Pareto analysis and total interpretive structural modeling.
Findings
Sixty-eight critical risk factors were identified and categorized into nine broad taxonomies: material risks, organizational risks, supply chain risks, technological risks, financial risks, design risks, health and safety risks, regulatory risks and stakeholder risks. Using the Pareto analysis, a conceptual map of 47 key critical risk factors was generated for circular construction projects. A hierarchical model was further developed to hypothesize the multiple possible connections and interdependencies of the taxonomies, leading to chain reactions and push effects of the key risks impacting circular construction projects.
Originality/value
This study constitutes the first systematic review of the literature, consolidating and theorizing the chain reactions of the critical risk factors for circular construction projects. Thus, it provides a better understanding of risks in circular construction projects.
Details
Keywords
Navdeep Singh, Deepankar Kumar Ashish and Anuj Dixit
This paper aims to evaluate the construction supply chain (CSC) by examining its relationships with various key areas and its development, identifying gaps and outlining potential…
Abstract
Purpose
This paper aims to evaluate the construction supply chain (CSC) by examining its relationships with various key areas and its development, identifying gaps and outlining potential future research directions that affect the implementation of CSC standards during the timeframe of the United Nations’ “Decade of Action” plans in the past two decades.
Design/methodology/approach
This paper reports on a systematic literature review with bibliometric analysis that investigates publications from around the world on various aspects of CSC. These aspects include research methodology/data collection technique, inquiry mode, country-specific research, focused areas of study, the research aims and publication periods.
Findings
The findings of the study reveal that information technology, information sharing, collaboration, performance measurement and CSC configuration have received considerable attention and analysis. However, financial management, supply chain resilience, logistics, vendor managed inventory and rural CSC have been identified as significant areas that require further investigation since limited attention has been given to them in the existing literature.
Research limitations/implications
CSC is a very dominant topic in the current study, but there are some limitations to it. Scopus and Web of Science databases were used to conduct the study. A future study can therefore consider papers related to other databases. As the focus was specifically dedicated to construction material SC only, the papers associated with SCs of labours and equipment have been eradicated.
Originality/value
To the best of the authors’ knowledge, this is the first structured and systematic literature review that identifies the issues related to the CSC during the timeframe of the United Nations’ “Decade of Action” plans and proposes future research directions to enhance the effectiveness and efficiency of CSC.
Details
Keywords
Yi He, Zhanyu Wang, Sha Liu and Xinle Du
As China’s e-commerce and cross-border e-commerce rapidly develop, the cross-border e-commerce supply chain exhibits characteristics of globalized development scale, collaborative…
Abstract
Purpose
As China’s e-commerce and cross-border e-commerce rapidly develop, the cross-border e-commerce supply chain exhibits characteristics of globalized development scale, collaborative multiparty participation, streamlined management processes, digitalized production and trade and flexible strategic choices. It tends toward data-driven intelligence, interoperable information collaboration, personalized order responses, sustainable supply chain management and secure blockchain technology. These characteristics and trends provide critical references for businesses, governments and investors.
Design/methodology/approach
In response to issues such as inconsistent legal regulations, imbalanced logistics and transportation, imperfect payment settlements and opaque supply chains.
Findings
It is recommended to take measures to strengthen cooperation and communication, optimize logistics, reduce customs clearance difficulties, reinforce safeguard measures and promote sustainable development, collectively fostering the healthy growth of cross-border e-commerce.
Originality/value
With the rapid development of cross-border e-commerce, green and low-carbon initiatives have become a significant trend in this sector. The cross-border e-commerce supply chain refers to the mechanism that reduces environmental impacts and enhances resource efficiency from manufacturers to consumers. It primarily involves manufacturers, e-commerce platforms, logistics companies and payment and settlement processes. The cross-border e-commerce supply chain is gradually becoming a highlight in China’s foreign trade, supporting the concept of “buying globally and selling globally” and connecting the “world’s factory” with the “world’s market.”
Details