Open Access
Article
Publication date: 4 April 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa and Mantoa Ramotshela

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about…

4522

Abstract

Purpose

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about stakeholders' engagement in construction projects. Therefore, the study investigated South Africa's shareholders' engagement in construction projects and recommended possible measures to mitigate potential limitations.

Design/methodology/approach

The researchers collated data from South African experts in stakeholder engagement via a phenomenology type of qualitative research design. They explored the “perceived hindrances” facing stakeholders' engagement in construction projects and proffer measures to mitigate them. The study analysed collected data via thematic analysis and achieved saturation. Three themes emerged from the analysed data.

Findings

Findings show that efficient stakeholder engagement will enhance team collaboration and integrated construction project delivery. Results identified the perceived limitations facing stakeholders' engagement in South Africa's construction projects and categorised them into individual perceived hindrances, organisational perceived hindrances and government-related perceived hindrances. Also, findings proffer measures to mitigate perceived hindrances via policies and programmes within the sector.

Practical implications

Besides enhancing policymakers and other stakeholders in South Africa's construction industry to understand the benefits of stakeholder engagement better, the study may stir up the construction sector's stakeholders to embrace enhanced and effective stakeholders' management.

Originality/value

This study contributes to construction project practice that involves stakeholders, as it reveals the underlying causes of perceived hindrances facing stakeholders' engagement in construction projects. Also, it proffers feasible solutions to mitigate these hindrances and enhance stakeholders' engagement within South Africa's construction projects.

Details

Benchmarking: An International Journal, vol. 31 no. 3
Type: Research Article
ISSN: 1463-5771

Keywords

Open Access
Article
Publication date: 15 March 2024

Andrew Ebekozien, Clinton Aigbavboa, Zinhle Mohlasedi, Opeoluwa Akinradewo and Emmanuel Bamfo-Agyei

Studies showed that stakeholders want the construction sector’s organisations to be more accountable and transparent regarding social and environmental issues through corporate…

Abstract

Purpose

Studies showed that stakeholders want the construction sector’s organisations to be more accountable and transparent regarding social and environmental issues through corporate social responsibility (CSR). There is a paucity of literature regarding CSR implementation in the construction sector, especially in developing countries like South Africa. Hence, the study evaluated CSR’s merits and hindrances and suggested solutions to enhance its implementation in the South African construction sector of Mpumalanga Province.

Design/methodology/approach

The researchers employed a questionnaire survey method to collect data from 68 useable respondents in the South African construction sector of Mpumalanga Province. The main section of the questionnaire was divided into three parts, each addressing an objective mean item score ranking technique.

Findings

Findings show management lacks willingness, absence of recognition for implementing CSR at tender adjudication, professionals regard CSR as a “soft issue,” inadequate ability to carry out CSR initiatives and lax CSR knowledge emerged as the key issues hindering construction stakeholders, especially construction companies, from participating in CSR in South Africa. The research suggests initiatives to enhance CSR in the construction industry.

Originality/value

The study shows that the findings can be used to improve the implementation of CSR engagement and possibly enhance a policy to stimulate friendly CSR in the South African construction sector.

Details

Property Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-7472

Keywords

Open Access
Book part
Publication date: 1 May 2019

Nick M. Hollely and Graeme D. Larsen

This research subscribes to the on-going process school of construction project briefing. Stakeholders underrepresented in the literature are engaged with by focussing on Formula…

Abstract

Purpose

This research subscribes to the on-going process school of construction project briefing. Stakeholders underrepresented in the literature are engaged with by focussing on Formula 1 motor racing circuits. Attention is given to the rationales through which stakeholders define construction projects at such venues. The aim of this paper is to understand the realities experienced by stakeholders and how these resonate with the rhetoric of briefing literatures.

Design/Methodology/Approach

A single case-based research approach, encouraged for studying informality and emergence, was used to study a heritage oriented construction project at Silverstone Formula 1 Circuit, UK. Data included field-notes, interviews and strategy documents. Stakeholder interests cannot be directly accessed; however, language used when defining projects can be. Analysis focussed on how project rationales drawn directly from data could be grouped into interpretative repertoires. These repertoires are linguistic resources, drawn upon by stakeholders, formed partly from sets of rationales oriented around a common interest.

Findings

The priorities given to competing rationales are found to fluctuate through time and depending on audience. Project advocates mobilise these conflicting rationales, from different repertoires, to different audiences simultaneously when strategically defining the heritage project. Discursive definitions emerged during analysis through studying both formal and informal briefing practices.

Research Limitations/Implications

Conflict among stakeholders with competing agendas during briefing is widely recognised however references to discursivity are currently scant.

Practical Implications

Coping with discursivity during briefing poses significant challenges for construction professionals.

Originality/Value

By interpreting strategic briefing as an on-going and discursive process of project definition, researchers and practitioners can better empathise with realities experienced by stakeholders.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

3318

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 12 May 2022

Kari-Pekka Tampio, Harri Haapasalo and Farooq Ali

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the…

8821

Abstract

Purpose

This study primarily aims to analyse stakeholder management challenges and how these emerge in the stakeholder landscape in a large hospital project. From this analysis, the authors aim to identify the implications that stakeholder management has on value creation in a hospital project.

Design/methodology/approach

The research method is qualitative. Empirical data were collected in three cycles: project internal documentation, thematic interviews and survey. The literature related to hospital projects, stakeholder analysis and management, stakeholder salience and landscape is summarised, informing the qualitative design of the study.

Findings

The authors noted the importance of project-specific stakeholder identification, salience analysis and landscape description. The regulatory, formal and contractual stakeholders give an over-simplistic picture on stakeholder map. The operative stakeholder map and landscape describe the complexity, uncertainty, dynamism and institutional context inducing the challenges for the stakeholder management. There is an evident potential of utilising the stakeholder landscape and its elements in the resulting collaborative value creation in hospital projects. Multiple and changing stakeholders with differing expectations are an important opportunity to improve the value creation process.

Originality/value

Stakeholder management has recently attracted much attention in the industrial project setting. This research attempts to identify the operative stakeholder landscape in a large hospital project, not to mention its impact on value creation. This study offers a framework that can help academics and project management practitioners tackle the challenges amongst project stakeholders.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 8 November 2022

Inimbom Walter Isang and David Ojimaojo Ebiloma

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction

2829

Abstract

Purpose

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction sector. By integrating the principle of sustainable construction, it can minimise the environmental and socio-economic impact of Covid-19. This research therefore aims at developing strategies to achieve sustainable project performance in the post-Covid era in Nigeria.

Design/methodology/approach

A qualitative research method was used. Data was collected from 13 stakeholders in the built environment. Percentages and thematic analysis were used to analyse data from the interviews.

Findings

The study reveals that stakeholders are encountering operational and financial challenges: Increased price of materials, labour and material shortage and project delays were key operational challenges. The financial challenges were related to increased construction cost, reduced profit and payment delays. To address these challenges, the study developed managerial, contractual and governmental strategies: Market survey and bulk purchase, remote working and adherence to Covid-19 protocols were among the key managerial strategies. For the contractual strategies: contracts reviews, smart contracts, working overtime and night shift were developed, while governmental strategies included provision of funds, loans and incentives for workers.

Originality/value

The study deduced that while environmental sustainability was employed to address the Covid-19 challenges, the economic and social aspects were found to be under-utilized. Therefore, the study concluded that a holistic application of environmental, economic and social sustainability themes while incorporating managerial, contractual and governmental strategies is significant for achieving sustainable project performance in the post-Covid era in Nigeria.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 4 October 2021

Nathaniel Ayinde Olatunde, Imoleayo Abraham Awodele and Henry Agboola Odeyinka

The purpose of the study is to examine the stakeholder identification (SI) methods used in building projects procured by private corporate organisations in Southwestern Nigeria to…

4251

Abstract

Purpose

The purpose of the study is to examine the stakeholder identification (SI) methods used in building projects procured by private corporate organisations in Southwestern Nigeria to draw a correlation between methods used for SI and project performance in the study area, thereby enhancing project performance.

Design/methodology/approach

The study used a census survey to purposively select 30 projects managers (who indicated from a first-stage questionnaire) that they have participated in structured stakeholder management (SM) from a list of 106 project managers and client representatives who have been involved in SM of building projects procured by private corporate organisations between 2008 and 2017 in the study area. A second-stage questionnaire was designed to elicit information from the respondents. The quantitative data that were collected were analysed using mean score (MS) analysis and Analysis of variance (ANOVA).

Findings

The study found that brainstorming in group meetings (MS = 4.33), interviews with the expert (MS = 3.20) and identification by other stakeholders (MS = 3.00) are the most frequently used SI methods in the study area. It was also found that the use of a questionnaire (MS = 0.87), Delphi method (MS = 0.80) and public hearing (MS = 0.57) was rare for SI in the study area. A further result showed that there was no significant difference in the opinion of project managers on 85% of methods used for SI in the study area irrespective of the procurement method employed.

Practical implications

The study examined the methods project managers used for SI on building projects procured by private corporate organisations to advocate for more robust and all-inclusive SI methods.

Originality/value

The study empirically examined methods used for SI and correlated them to project performance.

Details

Frontiers in Engineering and Built Environment, vol. 1 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 2 September 2021

Sharmin Khan, Mohammad Saquib and Anwar Hussain

Quality in the construction industry is an important issue yet ignored during the initial stages of the life cycle of a project, that is, the design and construction stage. The…

5919

Abstract

Purpose

Quality in the construction industry is an important issue yet ignored during the initial stages of the life cycle of a project, that is, the design and construction stage. The contribution of stakeholders, especially the architects is generally suspended though it has huge significance in terms of cost and time related to quality. This research endeavors to examine the issues related to the design and construction stages of the project from architects' purview, to understand the relative importance of these issues in the Indian construction industry.

Design/methodology/approach

The study of qualitative data conducted formed a basis for online quantitative data collection that was further analyzed with the help of cross-tabulation and multiple correspondence analysis methods.

Findings

The study concludes that the budget of a project is a corresponding factor related to quality concern for architects. The study also established that the quality issues corresponding to high budgets are closely related to the construction stage and are identified as preparation of checklist, and bidding process of hiring the contractor on the lowest bid.

Research limitations/implications

The study is limited to analyzing the perspective of architects; however, other stakeholders of the construction industry may represent a different opinion.

Practical implications

This research emphasizes the importance of the client's role, and need for integration and coordination among stakeholders in the construction industry for effective quality control and management.

Originality/value

The research presents an exhaustive literature review on quality issues and its importance with respect to cost implications, standard practices, sustainability and the life cycle of the project.

Details

Frontiers in Engineering and Built Environment, vol. 1 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 22 February 2022

Solmaz Mansoori, Janne Harkonen and Harri Haapasalo

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization…

2245

Abstract

Purpose

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization concept and product structure (PS).

Design/methodology/approach

The study follows a conceptual research approach in conjunction with a single case study. First, the previous studies on BIM implementation, productization and PS are reviewed. Further, a case study is used to analyse the current state of productization in the construction sector and develop a functional PS for construction.

Findings

A Part-Phase-Elements Matrix is proposed as a construction-specific PS to facilitate consistency in information and to enhance BIM. The proposed matrix provides new avenues to facilitate consistent information exchange through the interconnection between conceptual PS and standard building objects library, and encourage collaborative communication between stakeholders.

Originality/value

This study explores the core of the productization concept and PS as means to facilitate consistency of information and thus address the current gaps in BIM. This as building projects progressively move towards systematic modular and prefabricated construction where the flow of reliable information about product and construction offerings becomes increasingly important.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Article
Publication date: 10 June 2021

Muhammad Sami Ur Rehman, Muhammad Tariq Shafiq and Muneeb Afzal

The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on…

4073

Abstract

Purpose

The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on construction project performance in the United Arab Emirates (UAE).

Design/methodology/approach

This study adopted a qualitative and exploratory approach to investigate the impact of COVID-19 and its policies on project performance in the UAE construction industry in critical areas of the project management body of knowledge (e.g. schedule, cost, resources and contracts). Semi-structured interview questions were asked from ten construction professional to obtain valuable insights into the pandemic’s effects on the UAE construction industry and the effectiveness of policies implemented to rectify the damage and identify the industry’s new normal.

Findings

The findings indicate that the construction industry faced several challenges such as schedule delays, disrupted cashflows, delayed permits, approvals and inspections, travel restrictions, serious health and safety concerns, material and equipment shortages, among others which hindered the timely delivery of construction projects. It also indicates that efforts made by the government institutions and the construction industry of the UAE such as economic support programs, digitization of processes, fee and fine waivers, health facilities, among other statutory relaxations proved effective in supporting the construction industry against the adverse effects of the pandemic.

Research limitations/implications

The research findings are limited to the literature review and ten semi-structured interviews seeking an expert’s opinion from industry professionals working in the UAE construction industry. The research team did not get access to project documents, contracts and project progress reports which may be required to validate the interview findings, and to perform an in-depth analysis quantifying the impact of COVID 19 on construction projects performance, which is a limitation of this research.

Practical implications

The implication is that, owing to the imposed lockdowns and strict precautionary measures to curb the rapid spread of the pandemic, smooth execution of the construction project across the country was affected. The government institutions and stakeholders of the construction projects introduced and implemented various techniques and solutions which effectively handled the implications of the COVID-19 pandemic on the construction industry of the UAE.

Originality/value

This study has identified the challenges faced by the construction industry of the UAE in the context of the management of project schedule, project cost, construction contracts, health and safety of construction employees and other related aspects of the construction projects. This study also identified the techniques and solutions adopted by various public and private institutions of the country and their implications on construction projects. Therefore, this study provides guidelines for policymakers and future research studies alike.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords