Search results

1 – 10 of over 70000
Article
Publication date: 1 February 1994

JAN BRÖCHNER

This paper presents an analytical framework for determining efficient levels and durations of precontractual investigation. Economic efficiency in the allocation of investigation…

Abstract

This paper presents an analytical framework for determining efficient levels and durations of precontractual investigation. Economic efficiency in the allocation of investigation tasks between client and tenderer is shown to depend on how closely related the technologies of investigation and construction are. Moreover, risk aversion and the interest rate affect the efficient allocation. The framework is also used as a basis for an investment analysis of the balance between client's investigation efforts and expected claims in the future. Finally, the framework is used to show how the optimal length of the investigation period can be derived from the expected cash flow associated with a project over its total life cycle, from inception to demolition. Results indicate the economic potential of tailoring risk sharing in construction procurement, according to the type of construction project and the attitudes to risk among client and contractors.

Details

Engineering, Construction and Architectural Management, vol. 1 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 October 2023

Dongqiang Cao and Lianhua Cheng

In the evolution process of building construction accidents, there are key nodes of risk change. This paper aims to quickly identify the key nodes and quantitatively assess the…

88

Abstract

Purpose

In the evolution process of building construction accidents, there are key nodes of risk change. This paper aims to quickly identify the key nodes and quantitatively assess the node risk. Furthermore, it is essential to propose risk accumulation assessment method of building construction.

Design/methodology/approach

Authors analyzed 419 accidents investigation reports on building construction. In total, 39 risk factors were identified by accidents analysis. These risk factors were combined with 245 risk evolution chains. Based on those, Gephi software was used to draw the risk evolution network model for building construction. Topological parameters were applied to interpret the risk evolution network characteristic.

Findings

Combining complex network with risk matrix, the standard of quantitative classification of node risk level is formulated. After quantitative analysis of node risk, 7 items of medium-risk node, 3 items of high-risk node and 2 items of higher-risk nodes are determined. The application results show that the system risk of the project is 44.67%, which is the high risk level. It can reflect the actual safety conditions of the project in a more comprehensive way.

Research limitations/implications

This paper determined the level of node risk only using the node degree and risk matrix. In future research, more node topological parameters that could be applied to node risk, such as clustering coefficients, mesoscopic numbers, centrality, PageRank, etc.

Practical implications

This article can quantitatively assess the risk accumulation of building construction. It would help safety managers could clarify the system risk status. Moreover, it also contributes to reveal the correspondence between risk accumulation and accident evolution.

Originality/value

This study comprehensively considers the likelihood, consequences and correlation to assess node risk. Based on this, single-node risk and system risk assessment methods of building construction systems were proposed. It provided a promising method and idea for the risk accumulation assessment method of building construction. Moreover, evolution process of node risk is explained from the perspective of risk accumulation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 July 2023

Binchao Deng, Xindong Lv, Yaling Du, Xiaoyu Li and Yilin Yin

Inefficiency dilemmas in project governance are caused by various risks arising from the characteristic of construction supply chain projects, such as poor project performance…

Abstract

Purpose

Inefficiency dilemmas in project governance are caused by various risks arising from the characteristic of construction supply chain projects, such as poor project performance, conflicts between stakeholders and cost overrun. This research aims to establish a fuzzy synthetic evaluation (FSE) model to analyze construction supply chain risk factors. Corresponding risk mitigation strategies are provided to facilitate the improvement performance of ongoing construction supply chain projects.

Design/methodology/approach

A literature review is utilized to reveal the deficiencies of construction supply chain risk management. Thus, a total of five hundred (500) questionnaires are distributed to construction professionals, and four hundred and thirty-five (435) questionnaires are recovered to obtain the evaluation data of construction professionals on critical risk factors. Additionally, the FSE is used to analyze and rank the significance of critical risk factors. Finally, this research discusses nine critical risk factors with high weight in the model, and explains the reason for the significance of critical risk factors in the construction supply chain.

Findings

The questionnaire results show that the thirty-one (31) identified critical risk factors are verified by related practitioners (government departments, universities and research institutions, owners, construction units, financial institutions, design units, consulting firms). Thirty-one (31) identified critical risk factors are divided into common risks, risks from contractors and risks from owners. The most significant factors in the three categories, respectively, are “political risks,” “owner's unprofessional” approach and “cash flow.” Managing these risks can facilitate the development of the construction supply chain.

Originality/value

This paper expands the research perspective of construction supply chain risk management and complements the risks in the construction supply chain. For practitioners, the research result provides some corresponding measures to deal with these risks. For researchers, the research result provides the direction of construction supply chain risk treatment.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 December 2022

Timothy Adu Gyamfi, Clinton Ohis Aigbavboa and Wellington Didibhuku Thwala

Construction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot…

Abstract

Purpose

Construction organisations cannot underestimate the improvement in public–private partnership (PPP) projects’ implementation. At the same time, construction organisations cannot overlook the risk arising from engaging in PPP construction projects. Hence, this study aims to establish the influence of risk resource management (RRM) in managing PPP risk in the construction industry in Ghana.

Design/methodology/approach

The researchers adopted qualitative and quantitative research methods to achieve the aim of the study, in which Delphi questions and a close-ended questionnaire were developed. A total of 650 construction specialists, including procurement officers, consultants, project managers, quantity surveyors, site engineers and planning officers were chosen using random and purposive sampling techniques. Recovered data were analysed using descriptive statistics and confirmatory factor analysis (CFA). The CFA maximum likelihood estimation extractor compresses 19 variables into 3 pattern matrices.

Findings

The results of the study revealed three factors that measure RRM in Ghana’s PPP construction industry, including financial resource management which was influenced by communicating the budget to project team members and project partners understanding the budget, and material resource management which was influenced by the provision of materials transportation and provision of delivery programs and labour resource management which was impacted by a commitment to pay social security and taxes and provision of good salaries, to address RRM in PPP construction organisations.

Research limitations/implications

To incessantly improve the PPP risk management (RM) in construction through RRM, there should be a strong liaison between the universities, government agencies and the construction industry, and such collaboration will assist the industry to obtain first-hand information regarding the study findings and how they can be implemented to help the development of RM in the construction industry. This study is limited to Ghana and CFA and further study should explore structural equation model to determine the structure and measurement model of the risk resource variables.

Originality/value

The study may be valuable to industry stakeholders looking for new approaches to improve RM in their construction activities, particularly in PPP projects. Also, to assist reduce PPP risk, construction companies should use RRM in their organisations.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 May 2001

ADEKUNLE SABITU OYEGOKE

This study provides a framework for comparing construction management contracts in the UK and the US construction practices. It starts by reviewing previous studies on UK and US…

1683

Abstract

This study provides a framework for comparing construction management contracts in the UK and the US construction practices. It starts by reviewing previous studies on UK and US contracting practices and explores the main delivery methods, inform of comparison with construction management contracting systems. It examines construction management contracting types, processes and procedures and interaction between the construction manager and other stakeholders. This study was based on a literature review and the result shows the similarities and differences between the American and British CM systems within each practice and between both practices; the distribution of responsibilities and risks both in pre‐construction and during the construction stages; and allocation of responsibility in both practices.

Details

Engineering, Construction and Architectural Management, vol. 8 no. 5/6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 May 2020

De-Graft Owusu-Manu, Frank Ato Ghansah, Amos Darko, Richard Ohene Asiedu and David John Edwards

The purpose of this study is to investigate the insurable risks that impacted the operations on complex construction projects in developing countries using Ghana as a case study.

Abstract

Purpose

The purpose of this study is to investigate the insurable risks that impacted the operations on complex construction projects in developing countries using Ghana as a case study.

Design/methodology/approach

In this study, structured questionnaires were used to collect relevant information from the top management of construction and insurance firms in Ghana, comprising 50 industry professionals. The study adopted the χ2 and independent samples’ t test to interpret the responses from participants.

Findings

The study revealed the major risks that severely impacted the operations on complex construction projects, including strikes and labour disputes, long waiting time for approval of test samples, damages to property during construction, delay in payment to contractor for work done, poor construction method, pressure to deliver project on an accelerated schedule, labour shortage, permits delayed or take longer than expected, inaccurate materials estimating, change in weather pattern, low productivity of subcontractors and inadequate contractor experience.

Practical implications

The study is expected to contribute to increase in the awareness of the insurable risks and policies that project participants are exposed to, which will serve as a decision-making tool for contract formation.

Originality/value

This study assists in managing construction and insurance firms to note the major risk in managing a complex construction project. In addition to knowing the major risks identified, the study investigates the insurable risk by managing both construction and insurance firms.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 30 March 2021

Asli Pelin Gurgun and Kerim Koc

As a remedy to usually voluminous, complicated and not easily readable construction contracts, smart contracts can be considered as an effective and alternative solution. However…

1821

Abstract

Purpose

As a remedy to usually voluminous, complicated and not easily readable construction contracts, smart contracts can be considered as an effective and alternative solution. However, the construction industry is merely known as a frontrunner for fast adoption of recent technological advancements. Numerous administrative risks challenge construction companies to implement smart contracts. To highlight this issue, this study aims to assess the administrative risks of smart contract adoption in construction projects.

Design/methodology/approach

A literature survey is conducted to specify administrative risks of smart contracts followed by a pilot study to ensure that the framework is suitable to the research question. The criteria weights are calculated through the fuzzy analytical hierarchy process method, followed by a sensitivity analysis based on degree of fuzziness, which supports the robustness of the developed hierarchy and stability of the results. Then, a focus group discussion (FGD) is performed to discuss the mitigation strategies for the top-level risks in each risk category.

Findings

The final framework consists of 27 sub-criteria, which are categorized under five main criteria, namely, contractual, cultural, managerial, planning and relational. The findings show that (1) regulation change, (2) lack of a driving force, (3) works not accounted in planning, (4) shortcomings of current legal arrangements and (5) lack of dispute resolution mechanism are the top five risks challenging the adoption of smart contracts in construction projects. Risk mitigation strategies based on FGD show that improvements for the semi-automated smart contract drafting are considered more practicable compared to full automation.

Originality/value

The literature is limited in terms of the adoption of smart contracts, while the topic is receiving more attention recently. To support easy prevalence of smart contracts, this study attempts the most challenging aspects of smart contract adoption.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 June 2019

Ziyu Jin, John Gambatese, Ding Liu and Vineeth Dharmapalan

The prevention through design (PtD) concept has been widely recognized as one of the most effective approaches to eliminate or reduce construction site hazards. It encourages…

2298

Abstract

Purpose

The prevention through design (PtD) concept has been widely recognized as one of the most effective approaches to eliminate or reduce construction site hazards. It encourages engineers and architects to consider occupational safety and health during the planning and design phases. Nevertheless, the implementation of PtD is often inhibited because designers lack adequate knowledge about construction safety and the construction process, and limited design-for-safety tools and procedures are available for designers to use. The purpose of this paper is to provide designers a tool for assessing construction risks during early phases of multistory building projects at an activity level and on a daily basis in a 4D environment. By using the tool, proactive measures could be taken in the design and planning phase to reduce site hazards.

Design/methodology/approach

The proposed method consists of four steps including risk quantification at a design element level, 4D model integration with risk values, risk assessment, and design alternative selection and model acceptance. A case study was carried out to test and verify the proposed method.

Findings

The proposed tool has the capability to assess the safety risk for an entire multistory project and visualize safety risk in a particular time period, work space and task prior to construction. It benefits designers in conducting risk assessments and selecting design alternatives concerning safety. Contractors could also utilize the visualization and simulation results of the 4D model for site safety planning so that a range of risk mitigation strategies could be implemented during construction.

Originality/value

The study provides an innovative PtD tool targeting designers as primary end-users. The proposed tool helps designers assess construction risks and has potential to incorporate the top levels of the hierarchy of risk controls.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 11
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 September 2020

Huaqiang Li, Yiting Zhong and Chunmei Fan

The purpose of this paper is to explore the formation mechanism of the host country people's coping behavior regarding the construction of transnational railways to help…

Abstract

Purpose

The purpose of this paper is to explore the formation mechanism of the host country people's coping behavior regarding the construction of transnational railways to help engineering managers and decision makers improve their risk management and lead to sustainable transnational railway construction projects.

Design/methodology/approach

This paper adopted the grounded theory methodology to analyze the news stories reported by “Belt and Road Portal” and “The New York Times” about eight transnational railways. They were China–Kyrgyzstan–Uzbekistan (Central Asia), Mecca-to-Medina (West Asia), Hungarian–Serbia (Europe), China–Nepal (South Asia), Bi-Oceanic (South America), Mombasa–Nairobi (Africa), China–Laos (Southeast Asia) and Panama railways (North America). The keywords for news search were the names of each railway. After eliminating the problem sentences with semantic repetition and ambiguity, 2,631 effective sentences were formed to screen the information and code. The process included open, axial and selective coding.

Findings

It was concluded that the core structure of the formation mechanism was “situation,” “influence factor,” “cognition” and “coping behavior.” The country-of-origin image has served as an adjustment function in the analysis for the host country people. Governance strategies were suggested focusing on risk prevention, risk mitigation and risk response according to social risk management.

Research limitations/implications

The rise of transnational railway construction is encouraged by the process of globalization. But during the long construction period, the host country people's coping behavior would develop into social conflicts and mass incidents, becoming a significant obstacle to construction objectives. Thus, studying the formation mechanism of public coping behaviors can better take measures to prevent social risks.

Originality/value

The contributions of this research are three aspects: first, a formation mechanism of the host country people's coping behavior based on grounded theory is presented. Second, the country-of-origin image is found to be a factor that cannot be ignored in a transnational context. The formation mechanism of public coping behaviors is improved compared to risk management in the domestic situation. Finally, the host country people pay more attention to the motivations of country-of-origin's controlling interests and their own emotions compared with internal stakeholders.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 May 2022

Zhenshuang Wang, Yanxin Zhou, Xiaohua Jin, Ning Zhao and Jianshu Sun

Public-private partnership (PPP) projects for construction waste recycling have become the main approach to construction waste treatment in China. Risk sharing and income…

Abstract

Purpose

Public-private partnership (PPP) projects for construction waste recycling have become the main approach to construction waste treatment in China. Risk sharing and income distribution of PPP projects play a vital role in achieving project success. This paper is aimed at building a practical and effective risk sharing and income distribution model to achieve win–win situation among different stakeholders, thereby providing a systematic framework for governments to promote construction waste recycling.

Design/methodology/approach

Stakeholders of construction waste recycling PPP projects were reclassified according to the stakeholder theory. Best-worst multi–criteria decision-making method and comprehensive fuzzy evaluation method (BWM–FCE) risk assessment model was constructed to optimize the risk assessment of core stakeholders in construction waste recycling PPP projects. Based on the proposed risk evaluation model for construction waste recycling PPP projects, the Shapley value income distribution model was modified in combination with capital investment, contribution and project participation to obtain a more equitable and reasonable income distribution system.

Findings

The income distribution model showed that PPP Project Companies gained more transaction benefits, which proved that PPP Project Companies played an important role in the actual operation of PPP projects. The policy change risk, investment and financing risk and income risk were the most important risks and key factors for project success. Therefore, it is of great significance to strengthen the management of PPP Project Companies, and in the process of PPP implementation, the government should focus on preventing the risk of policy changes, investment and financing risks and income risks.

Practical implications

The findings from this study have advanced the application methods of risk sharing and income distribution for PPP projects and further improved PPP project-related theories. It helps to promote and rationalize fairness in construction waste recycling PPP projects and to achieve mutual benefits and win–win situation in risk sharing. It has also provided a reference for resource management of construction waste and laid a solid foundation for long-term development of construction waste resources.

Originality/value

PPP mode is an effective tool for construction waste recycling. How to allocate risks and distribute benefits has become the most important issue of waste recycling PPP projects, and also the key to project success. The originality of this study resides in its provision of a holistic approach of risk allocation and benefit distribution on construction waste PPP projects in China as a developing country. Accordingly, this study adds its value by promoting resource development of construction waste, extending an innovative risk allocation and benefit distribution method in PPP projects, and providing a valuable reference for policymakers and private investors who are planning to invest in PPP projects in China.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 70000