Case study
Publication date: 19 December 2022

Juan Ernesto Perez Perez

At the end of the case students will be able to:1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh…

Abstract

Learning outcomes

At the end of the case students will be able to:

1. Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide.

2. Determine high-level risks by articulating the WBS and RBS of a construction project.

3. Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique.

4. Propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan.

Case overview/synopsis

MORESA S.A.S was a family company founded in 1994, whose value proposition focused on construction and permanent advice for the execution of innovative and contemporary projects with more than 27 years of experience in the city of San José de Cucuta, department of Norte de Santander, Colombia. The objective of the case is to Relate risk as one of the 12 principles in project management contemplated in the international standards of the PMBOK Seventh Edition guide; Determine high-level risks by articulating the WBS and RBS of a construction project; Perform a qualitative and quantitative analysis of the probability and impact of risks through the heat map tool and the Expected Monetary Value (EMV) technique and propose the different response strategies contemplated in the risk management through the formulation of a response and contingency plan. The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master in project management or MBA. For this case, an expert judgment was developed with professionals belonging to different areas of knowledge. Likewise, secondary information was collected from the organization's strategic documents and the analogous estimation through the historical records of the project portfolio developed by the construction company. Finally, the case, classified in the Built Environment, a challenge that project managers must face in VUCA environment through risk management.

Complexity academic level

The teaching case is designed for academic programs in areas of knowledge of civil engineering, architecture and at postgraduate level such as: Master’s in civil engineering, Master’s in risk management, Master’s in project management or MBA. In the modules of risk management, project management, international standards, the case guides the applicability of methods and artifacts used in risk management considering the process identification, quantitative, qualitative analysis, and development of response strategies and contingency plans.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 12 no. 4
Type: Case Study
ISSN:

Keywords

Case study
Publication date: 13 December 2013

Zhuo Jun, Phan Chanvicheka and Gao Shuai

Management science, operational and financial risk of overseas enterprises.

Abstract

Subject area

Management science, operational and financial risk of overseas enterprises.

Study level/applicability

This case is mainly applicable to international business course and project management course.

Case overview

Since 1992, the Great Mekong sub-regional economic cooperation between China and ASEAN countries was officially launched and set free economic zone. Hydropower is starting to develop in recent years in Cambodia, and it is a good significance to Cambodia's industry. Furthermore, most of hydropower plants in Cambodia are built by Chinese companies. Thus, this paper will analyze the current risk and condition of Kamchay hydropower, as well as the development of Chinese enterprise for Cambodia economic and social development.

Expected learning outcomes

This case study provides students concepts on international business, project management, and operational risk of overseas enterprises. The principle of project contracting, labor cooperation, and project financial in international process are considered together with the implications they have for advancing understanding of the problem of the host country's government interests and the various risk of enterprises in international BOT projects.

Supplementary materials

Teaching notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.

Details

Emerald Emerging Markets Case Studies, vol. 3 no. 8
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 September 2022

Zehra Waheed

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each…

Abstract

Learning outcomes

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each source;▪ to introduce theory that allows students to identify, characterise and describe factors that can lead to inter-organisational conflict during construction projects;▪ to develop the ability to apply the typology of causal factors (identified in Objective 2) to a given context, answering why each factor may have contributed to the given contractual dispute;▪ to develop an understanding of the procurement and contract management process wherein contracts are not only the logical outcome of the procurement process but also the primary vehicles for clarifying responsibilities (for task completion) and risk transfer; and▪ to understand specific dynamics of construction projects that make disputes inevitable and ways to overcome these.

Case overview/synopsis

Priced at US$1.63bn (in 2015), the Orange Line Metro Train (OLMT) project in Lahore was one of Pakistan’s earliest (and costliest!) transport infrastructure megaprojects ever undertaken. Devised to ease congestion in Lahore, promote ecofriendly, efficient, modern and affordable transport systems and lead to improved mobility across Lahore, the OLMT was a socially, politically and economically important project.The case is seen through the eyes of the protagonist, Uzair Shah, a seasoned public servant and an experienced Transport Engineer. At the time of the decision, Shah was General Manager – Operations at the newly established Punjab Metrobus Authority (PMA – the project sponsor) and was also the project lead of OLMT’s Project Management Unit (PMU). Through Shah’s eyes, students approach the project at a juncture when the most serious contractual dispute in the project’s history has erupted. The parties at the interface were Lahore Development Authority (LDA), PMU’s technical interface with contractors and consultants and Maqbool-Colson Joint Venture (MCJV), one of the two civil work contractors hired for OLMT’s civil works.While quality issues had been emerging with MCJV for a few months, LDA had maintained unilateral communications and remained considerably adversarial in their dealings with MCJV. Eventually, in October 2016, this relationship had soured to such an extent that it appeared irreconcilable. It was only then that LDA had recommended Shah to take the contractor to court for non-performance.The decision that Uzair faced was whether to take LDA’s advice and take the contractor to court (terminate the contract, claim performance guarantee and appoint a new contractor) or negotiate and continue with the current contract. The decision had huge financial, legal, reputational, political and schedule-related implications. The decision needed to be taken by the protagonist in the context of all these factors.

Complexity academic level

The case was initially developed for use within a Procurement and Contracts Management course for a (business) executive audience. The case is intended for the business school audience or students enrolled in courses related to the construction management discipline.Courses where the case can be used include Construction Project Management, Public Sector Projects, Contracts and Procurement and Strategic Projects and Practice (or similar). The case can also be used within an MBA setting.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 9: Operations and Logistics.

Case study
Publication date: 31 March 2016

Goutam Dutta

This case deals with several types of uncertainties faced by project team in an oil company north east in India. These challenges and uncertainties are in the areas drawing…

Abstract

This case deals with several types of uncertainties faced by project team in an oil company north east in India. These challenges and uncertainties are in the areas drawing approval, supply chain, critical equipment availability, soll type, control room, soil type, employee availability, environmental clearances, safety and wildlife clearances. This project demonstrates the ownership issues, why it is difficult to complete a project on time in the Northeast of India or why public sector project gets delayed.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

Case study
Publication date: 20 January 2017

Kenneth M. Eades, George (Yiorgos) Allayannis and Minas Terlidis

The case examines one of the most significant infrastructure projects in southeastern Europe during a time when the legal and financial environment for project financing was in…

Abstract

The case examines one of the most significant infrastructure projects in southeastern Europe during a time when the legal and financial environment for project financing was in its infancy (early to mid-1990s). Athens needed a ring road to support its bid to host the 2004 Olympic Games. The road was technically—as well as logistically—complex, involving 33 municipalities and construction that involved a major metropolitan area (Athens) populated by more than 3.5 million inhabitants. The case examines the economics of the project, how private-public partnerships (PPPs) are structured, and the broader field of infrastructure finance.

Details

Darden Business Publishing Cases, vol. no.
Type: Case Study
ISSN: 2474-7890
Published by: University of Virginia Darden School Foundation

Keywords

Case study
Publication date: 5 May 2016

Lumina S. Albert, Grace Hanley Wright and Thomas J. Dean

The Neenan Company is a construction firm based in Fort Collins, Colorado, known for their efforts in pioneering the advancement of the design/build approach to construction. With…

Abstract

Synopsis

The Neenan Company is a construction firm based in Fort Collins, Colorado, known for their efforts in pioneering the advancement of the design/build approach to construction. With a history of industry leadership, innovative contracting methods, and ethical business practices, the company now faces management, customer relations, and financial challenges. Serious structural problems were discovered in a number of public schools and other buildings built by the company. Thrown into a whirlwind of shock, Randy Myers, President of the company, must consider how to respond to the crisis, and how to prevent these issues in the future. Written from his perspective, this case provides a platform for considering the challenges that can result from industry innovation, ethical decision-making, and crisis management.

Research methodology

For the development of this case, the authors interviewed the top management at the Neenan Company: Founder David Neenan, President Randy Myers, and Donna Smith, Vice President of Business Development. The authors also interviewed current employees, previous employees of Neenan, representatives of school buildings built by Neenan, stakeholders, other experts in the construction field and existing customers of the company. The company made internal documents available to the authors, including financial statements and quality control and assessment tools, which were provided by Ryan Dellos, Chief Financial Officer. The authors surveyed financial documents and business documents to analyze pertinent information and data relevant to the case. All the interviews were recorded, coded, and analyzed to include multiple perspectives. Extensive online research was conducted on the construction industry and The Neenan Company which included several news articles and interviews on David and Randy. Additionally, the authors carefully studied the news reports by The Denver Post and other related press materials. Experts from the construction field and financial field provided assistance with data analysis and interpretation. The authors used a variety of academic resources to draw connections between the issues faced by Neenan and concepts discussed in business courses.

Relevant courses and levels

This case has applications in entrepreneurship, small business management, business ethics, leadership, organizational structure/design, and new venture management courses at both undergraduate and graduate levels. It also contains critical areas of decision-making relevant to an advanced strategic management course. The case can be introduced at any stage of the term, and is specifically relevant to discussions focussing on innovation and growth, corporate social responsibility, ethical decision-making, stakeholder theory, entrepreneurial crisis management, and long-term venture success.

Details

The CASE Journal, vol. 12 no. 2
Type: Case Study
ISSN: 1544-9106

Keywords

Case study
Publication date: 20 January 2017

David Besanko and João Tenreiro Gonçalves

Rede Alta Velocidade, SA (RAVE), the state-owned company responsible for planning and developing a major high-speed rail project in Portugal, must persuade both public officials…

Abstract

Rede Alta Velocidade, SA (RAVE), the state-owned company responsible for planning and developing a major high-speed rail project in Portugal, must persuade both public officials and lenders that the project is worth undertaking. It must also make a recommendation on the appropriate organizational form for the enterprise. Specifically, it must determine the role of the Portuguese government in financing and operating the high-speed rail network, with options ranging from full development and management of the project by the public sector to completely private development and management. Lying in between these two polar cases were a variety of hybrid models, often referred to as public-private partnerships (PPPs). Using data in the case, students have the opportunity to perform a benefit-cost analysis of the project. They also must think carefully about the optimal role of the government in a major new infrastructure project.

After analyzing and discussing the case, students will be able to:

  • Understand the nature of a global public good

  • Perform a back-of-the-envelope benefit-cost analysis of polio eradication

  • Discuss the appropriate strategy for eradicating an infectious disease

  • Apply game theory to analyzing which countries would be likely to contribute funds toward global polio eradication

  • Discuss the role of private organizations in the provision of global public goods

Understand the nature of a global public good

Perform a back-of-the-envelope benefit-cost analysis of polio eradication

Discuss the appropriate strategy for eradicating an infectious disease

Apply game theory to analyzing which countries would be likely to contribute funds toward global polio eradication

Discuss the role of private organizations in the provision of global public goods

Details

Kellogg School of Management Cases, vol. no.
Type: Case Study
ISSN: 2474-6568
Published by: Kellogg School of Management

Keywords

Case study
Publication date: 5 January 2015

Sidharth Sinha

Greenko, a renewable power generating company investing in biomass, small and medium hydro power and wind power projects, had projected to achieve 1GW (Giga Watt = 1000 Mega Watt…

Abstract

Greenko, a renewable power generating company investing in biomass, small and medium hydro power and wind power projects, had projected to achieve 1GW (Giga Watt = 1000 Mega Watt) of installed capacity by March 2015. The company had been financing its projects with debt from Indian banks and financial institutions on a project finance basis and it had to now decide whether to refinance the project finance debt with an international bond issue of USD 550 million. The case provides an opportunity to discuss the public policy and financing aspects of renewable energy in India.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 30 July 2018

Goutam Dutta

S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to…

Abstract

S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to discuss his village road-making project in Pradhan Mantri Gram Sadak Yojona (PMGSY). This case discusses how the concept of work breakdown is used to subdivide all the activities of road-making into different sub activities (earthwork, bridgework, roadwork and other miscellaneous activities) in different levels.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

1 – 10 of 743