Article
Publication date: 1 April 2014

Rami Hughes and David Thorpe

The purpose of the research discussed in this paper is to ascertain the perception, from the project manager's viewpoint, of factors affecting construction productivity in the…

2899

Abstract

Purpose

The purpose of the research discussed in this paper is to ascertain the perception, from the project manager's viewpoint, of factors affecting construction productivity in the State of Queensland, Australia.

Design/methodology/approach

The research was conducted by a structured questionnaire that was sent to 89 randomly selected construction project managers in Queensland, Australia. This questionnaire requested background information about the respondents and then sought a score, using a 0-4 Likert scale, from each of them with respect to the importance of 47 factors identified from the literature that were considered likely to affect construction productivity. The factors were stratified into primary factors and secondary factors contributing to three of the primary factors. There were 36 responses. These factors were rated by the respondents and then ranked using a relative importance index approach.

Findings

The research evaluated the relative importance of the primary factors with respect to their effect on construction productivity. The 15 highest ranking factors are discussed. Three factors – rework, poor supervisor competency, and incomplete drawings – were ranked as having a strong effect on construction productivity. There was also an analysis of the secondary factors in relation to three of the primary factors.

Research limitations/implications

The research focused on the State of Queensland in Australia. It had a response rate of 40 per cent. It provides insight into the factors affecting productivity on construction projects in Australia. Further research to investigate the identified factors in depth, using targeted interviews of expert project management professionals, is currently being undertaken.

Practical implications

The construction industry can use the findings in this paper as a basis for improving the productivity of construction projects.

Originality/value

This research is original research, which has highlighted a number of key areas of which construction productivity can be improved.

Details

Construction Innovation, vol. 14 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 10 April 2017

Sara Hajikazemi, Bjørn Andersen and Jan Alexander Langlo

The construction industry is a labor-intensive industry, hence, the presence of labor with high productivity at each stage of the project plays a significant role in achieving…

Abstract

Purpose

The construction industry is a labor-intensive industry, hence, the presence of labor with high productivity at each stage of the project plays a significant role in achieving project success. The purpose of this paper is to provide real-life empirical data about the current level of construction productivity, in this case electrical installation work, within construction projects in Norway. In addition, it was of interest to identify the areas which have the highest potential for improvement of labor productivity.

Design/methodology/approach

This study considers the construction labor productivity through an elaboration on productive vs unproductive time within construction projects. It is based on a “frequency study” done on eight construction projects in Norway. The “work sampling” method has been used for collection of empirical data. For each project, four electricians were observed an entire working day and the amount of time they spent on performing each activity was recorded every 60th seconds. The activities observed were based on a predefined set of activities.

Findings

The results of the observations show that on average, 61.1 percent of the time was direct value-added work. This number is significantly better than what is normally discussed as being productive time. However, the findings also show that there is still potential for improvement. The activities that have the highest potential for improvement include “material transfer,” “amendments to already executed installation,” “personal needs” and “waiting times.”

Practical implications

The study results will be of immense benefit to managers of construction projects as well as managers of construction organizations in enhancing their project performance and productivity.

Originality/value

This paper contributes both theoretically and empirically to the current discussion and findings on labor productivity and its relation to project success. The results presented in this paper have important implications of labor productivity in construction projects and future studies in the area of project performance.

Details

International Journal of Productivity and Performance Management, vol. 66 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 31 May 2019

Argaw Tarekegn Gurmu

The purpose of this paper is to identify and prioritise the safety and health practices, which are suitable to improve labour productivity in building construction projects, and…

1331

Abstract

Purpose

The purpose of this paper is to identify and prioritise the safety and health practices, which are suitable to improve labour productivity in building construction projects, and to investigate the association between company profiles, project characteristics and the safety practices.

Design/methodology/approach

The study adopted a mixed-method research design which involves two phases. In Phase I, qualitative data were collected and analysed to identify safety and health practices. In total, 19 experts who have experience in building construction projects were involved in the interviews. During Phase II, quantitative data were collected from contractors that are involved in the delivery of building projects using questionnaires which were administered via face-to-face interviews. After analysing the quantitative data, the safety and health practices were prioritised and the relationships between the practices and company profiles were investigated.

Findings

Safety and health policy, safety and health plan and hazard analysis are found to be the three most important practices that can improve productivity in building construction projects. The results of Spearman correlation analysis revealed that the level of implementation of the safety and health practices increases with project costs. Company experience and company size are positively associated with safety and health practices. Project delay is negatively correlated with safety and health practices.

Originality/value

The study provides useful information for international developers and contractors who want to do the construction business in Australia. Furthermore, contractors involved in the construction of building projects in Australia can implement the identified safety and health practices to improve labour productivity.

Details

International Journal of Productivity and Performance Management, vol. 68 no. 8
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 9 April 2018

Argaw Tarekegn Gurmu and Ajibade Ayodeji Aibinu

The purpose of this paper is to identify and prioritize management practices that have the potential to improve labor productivity in multi-storey building construction projects.

1429

Abstract

Purpose

The purpose of this paper is to identify and prioritize management practices that have the potential to improve labor productivity in multi-storey building construction projects.

Design/methodology/approach

The study adopted two-phase mixed-methods research design and 58 project managers, contract administrators and project coordinators were involved in the survey. During Phase I, qualitative data were collected from 19 experts using interviews and the management practices that could enhance labor productivity in multi-storey building construction projects were identified. In Phase II, quantitative data were collected from 39 contractors involved in the delivery of multi-storey building projects by using questionnaires. The data were analyzed to prioritize the practices identified in Phase I.

Findings

Well-defined scope of work, safety and health policy, safety and health plan, hazard analysis, long-lead materials identification, safe work method statement, and toolbox safety meetings are the top seven practices that have the potential to improve labor productivity in multi-storey building projects.

Originality/value

The research identifies the management practices that can be implemented to enhance labor productivity in multi-storey building construction projects in the context of Australia. Being the first study in the Australian context, the findings can be used as benchmark for international comparison.

Details

International Journal of Productivity and Performance Management, vol. 67 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 24 August 2018

Farshid Baniassadi, Amin Alvanchi and Ali Mostafavi

Safety and productivity are key concerns in the construction projects. While safety looks to the construction workers need to work in a safe environment, productivity affects the…

Abstract

Purpose

Safety and productivity are key concerns in the construction projects. While safety looks to the construction workers need to work in a safe environment, productivity affects the project’s profitability and is of a paramount importance from the project owner’s view. The different perspective to the safety and productivity from these two major players in construction projects poses a potential for the conflict between the two. This problem can be fundamentally addressed by methods concurrently improving project safety and productivity. The paper aims to discuss this issue.

Design/methodology/approach

To this aim, a discrete event simulation (DES) based framework applicable was proposed for complex and hazardous operations. The utility of the framework was tested using a case study of an eight-story residential building in the north-east part of Tehran, Iran. The excavation and stabilization operation was identified as the most hazardous and critical operation in this case. The framework could improve safety and productivity of this operation by 38 and 4 percent, respectively.

Findings

This framework is a complement to the conventional construction project safety and productivity planning methods. Its main application is in complex and hazardous construction operations.

Originality/value

For the first time, a comprehensive framework for concurrently improving safety and productivity of an entire project was proposed in this research. DES was used as the main modeling tool in the framework to provide an ex-ante evaluation foundation applicable to a wide range of construction projects.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 11
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 April 2018

Roberta Pellegrino and Nicola Costantino

The purpose of this paper is to focus on productivity as it unfolds during the execution of a particular task, i.e., reinforced concrete operations. The main aim is understanding…

Abstract

Purpose

The purpose of this paper is to focus on productivity as it unfolds during the execution of a particular task, i.e., reinforced concrete operations. The main aim is understanding whether the learning effect explaining the improvement of productivity in subsequent cycles of a given repetitive construction process is mainly attributable to a pure worker learning (independent on the specific site) or to the experience developed by the crew on the site conditions.

Design/methodology/approach

The authors conduct a research that empirically investigates and compares the change in productivity data of a single worker during his/her working life and that of a crew involved in specific repetitive work, such as the concreting activities of a multi-storey building.

Findings

The findings suggest differentiating between productivity gain as a result of the learning effect of the individual worker throughout his/her working life (which is independent of the specific project and site) and that of a crew composed by more workers which repeat reinforced concrete operations in a given specific project.

Research limitations/implications

Despite the great attention reserved to learning in construction, few researchers discuss on the real applicability of the learning curve (LC) theory in the construction industry. The authors contribute to this literature by empirically investigating the contributions that the learning effect of the individual worker and that of a crew repeating a given task (i.e. reinforced concrete operations) in a given project have on the productivity improvement for subsequent cycles of the repetitive construction process.

Practical implications

The findings of this study have important managerial implications. The shape of the LC of the individual worker implies that learning increases relatively slowly in his/her working life (particularly after one to two years), while the effects of the crew experience are immediately significant in a time range of few weeks. This means that a single “one-off” multi-storey building project will show in the first storey the “historical,” individual productivity of the individual workers (i.e. not going to vary significantly in the next few weeks). The productivity improvement in the further storeys will only depend on the project-specific (and collective, for the crew) “learning” due, for example, to better coordination or to other issues that are progressively solved moving from the first storey to the following ones. So, the project-specific LC increases in a faster way than the individual one, and the overall productivity can be improved by accelerating the project-specific learning rate with more accurate project-specific design and management.

Originality/value

This paper enhances the understanding of the contributions that the learning effect of the individual worker and that of a crew repeating a given task (i.e. reinforced concrete operations) in a given project have on the productivity improvement for subsequent cycles of the repetitive construction process. This will contribute to improve the planning and control of site work activities, avoiding time and money wastefulness.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 April 2022

Caryn Khye Lyn Tan and Zulkiflee Abdul-Samad

This paper aims to study the reaction of construction project managers in coping with workforce productivity challenges that arise from the COVID-19 pandemic.

1490

Abstract

Purpose

This paper aims to study the reaction of construction project managers in coping with workforce productivity challenges that arise from the COVID-19 pandemic.

Design/methodology/approach

Quantitative research via questionnaires targeting the project managers from G7 contractor companies in Malaysia was carried out in the data collection process. In total, 182 responses have been analysed descriptively and inferentially using SPSS software.

Findings

The research discovers that most of the construction projects and their workforce productivity were adversely impacted by the COVID-19 pandemic. Besides, the strategies adopted by project managers in Malaysia and the ranking of strategies based on their effectiveness were indicated.

Originality/value

The findings of this research have contributed to a new understanding of the construction workforce productivity during the COVID-19 era from the perspective of project managers in Malaysia. A guideline established from the ranking of strategies would be useful to ensure the survival of the industry in Malaysia aftermath of the COVID-19 pandemic.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 8
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 30 March 2020

Argaw Tarekegn Gurmu

The main objective of this research is to identify the most important human resource management (HRM) practices, which have the potential to enhance labour productivity using…

Abstract

Purpose

The main objective of this research is to identify the most important human resource management (HRM) practices, which have the potential to enhance labour productivity using fuzzy synthetic evaluation approach.

Design/methodology/approach

The study used a mixed-methods research design in which qualitative data were collected and analysed during Phase I and quantitative data were analysed during Phase II. Nineteen experts who have experience in building construction projects were involved in interviews conducted in Phase I. During Phase II, quantitative data were collected from contractors that were involved in the delivery of building projects using questionnaires and the data were analysed using FSE technique.

Findings

Clear delegation of responsibility, stability of organisational structure and crew composition are found to be the three most important HRM practices that can enhance productivity in building construction projects. The findings of the study showed that the overall importance index computed using the FSE model is 3.65 (≈ 4) with an equivalent linguistic term of “very important”. The study also suggested that the top three HRM practices should be implemented conjointly as there is no significant difference among their weights.

Originality/value

The output of this research can provide important information regarding the HRM practices in the Australian construction industry. Thus, international developers or contractors who want to do construction business in Australia can implement the essential HRM practices so that the productivity of their construction projects will not be affected negatively.

Details

International Journal of Productivity and Performance Management, vol. 70 no. 2
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 30 September 2014

Parviz Ghoddousi and, Behzad T. Alizadeh, M. Reza Hosseini and Nicholas Chileshe

Building upon the results of a critical review of previous studies, the purpose of this paper is to present a framework to enhance the reliability of the theoretical model for…

Abstract

Purpose

Building upon the results of a critical review of previous studies, the purpose of this paper is to present a framework to enhance the reliability of the theoretical model for international benchmarking of labour productivity (TMIBLP) method for construction project activities. The next part of the paper presents the results of implementing the proposed framework for construction activities in the Iranian construction industry.

Design/methodology/approach

This paper draws upon a critical review of the literature to highlight the drawbacks of the previous studies concerning implementing TMIBLP within the construction industry. Identifying these shortcomings, the authors propose a framework for construction projects, which presents the procedure for deploying TMIBLP for construction activities in a reliable manner. The final section of the paper demonstrates the empirical implementation of the proposed framework within the Iranian construction industry.

Findings

The primary contributions of the paper include: identifying the drawbacks of previous studies within the construction context, the framework that would lead construction managers towards more reliable implementation of benchmarking for construction projects, and determining the baseline of erecting steel structures in a developing country.

Practical implications

A practical implementation of the TMIBLP method was presented to address the lack of research in Iran and to show the feasibility of using the framework developed. The authors investigated the daily labour productivity for the activity of structural steel erection for six projects in Tehran in order to determine the values of the baseline productivity for each project. Accordingly, the disruption index, performance ratio and project management index as the project benchmarks were calculated for all six projects.

Originality/value

Underlining the necessity of implementing methods such as TMIBLP, this study outlines the outcomes of the first study on the benchmarking of construction activities deploying the proposed framework and using the data on erecting steel structures from six construction projects in Iran. The discussions provide guidelines for construction project managers regarding benchmarking labour productivity. The paper concludes with suggestions for future research opportunities.

Details

Benchmarking: An International Journal, vol. 21 no. 6
Type: Research Article
ISSN: 1463-5771

Keywords