Open Access
Article
Publication date: 8 February 2021

Eryk Głodziński

The purpose of this paper is to discuss contemporary knowledge relevant to the application of performance measurement (PMe) in the concept of OPM and to compare findings from a…

1651

Abstract

Purpose

The purpose of this paper is to discuss contemporary knowledge relevant to the application of performance measurement (PMe) in the concept of OPM and to compare findings from a literature review with solutions recommended for utilization by managers from general contractors operating in Poland. There are few studies related to the mentioned topic, much fewer describing the geographical area of Eastern Europe.

Design/methodology/approach

Triangulation of research methods was selected. First literature review, next desk research and finally descriptive statistical analysis and interview were conducted. The research methods were applied in three steps whose beginnings overlapped and the mid-term findings from one study complemented others.

Findings

PMe should be focused on management and governance issues. Its evaluation is related to various organizational levels (permanent organization, portfolio, program, project, construction site and supply chain), most of them are under valuated by practitioners. The conducted study pointed out that there are numerous supporting tools and measures applicable in organizational project management (OPM). The managers recommend combining various tools in one comprehensive OPM system, to limit multiple manual incorporations of the same data to the various databases. The managers call to increase the practical usefulness of researchers’ proposals, to educate the construction managers in the application of complex performance systems and to promote portfolio thinking.

Originality/value

The comparison of performance measurement solutions proposed by academia with experience collected from Polish construction managers could support the better application of theoretical ideas in practice.

Details

Measuring Business Excellence, vol. 25 no. 3
Type: Research Article
ISSN: 1368-3047

Keywords

Open Access
Article
Publication date: 26 June 2023

Petter Haglund and Mats Janné

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…

1131

Abstract

Purpose

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.

Design/methodology/approach

This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.

Findings

The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.

Research limitations/implications

This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.

Practical implications

BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.

Originality/value

To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 30 April 2021

Sepehr Alizadehsalehi and Ibrahim Yitmen

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality…

8962

Abstract

Purpose

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality (RC-to-XR).

Design/methodology/approach

IDEF0 data modeling method has been designed to establish an integration of reality capturing technologies by using BIM, DTs and XR for automated construction progress monitoring. Structural equation modeling (SEM) method has been used to test the proposed hypotheses and develop the skill model to examine the reliability, validity and contribution of the framework to understand the DRX model's effectiveness if implemented in real practice.

Findings

The research findings validate the positive impact and importance of utilizing technology integration in a logical framework such as DRX, which provides trustable, real-time, transparent and digital construction progress monitoring.

Practical implications

DRX system captures accurate, real-time and comprehensive data at construction stage, analyses data and information precisely and quickly, visualizes information and reports in a real scale environment, facilitates information flows and communication, learns from itself, historical data and accessible online data to predict future actions, provides semantic and digitalize construction information with analytical capabilities and optimizes decision-making process.

Originality/value

The research presents a framework of an automated construction progress monitoring system that integrates BIM, various reality capturing technologies, DT and XR technologies (VR, AR and MR), arraying the steps on how these technologies work collaboratively to create, capture, generate, analyze, manage and visualize construction progress data, information and reports.

Details

Smart and Sustainable Built Environment, vol. 12 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Book part
Publication date: 1 May 2019

Marco A. Bragadin and Kalle Kähkönen

This paper is based on research addressing quality of construction schedules. The paper aims to structure a Schedule Health Assessment method and present it as a means to carry…

Abstract

Purpose

This paper is based on research addressing quality of construction schedules. The paper aims to structure a Schedule Health Assessment method and present it as a means to carry out the evaluation of construction schedules.

Design/Methodology/Approach

The development of the Schedule Health assessment method can be characterised as constructive research. The structuring of the method is based on analysis of factors forming the overall quality of construction schedules. The method has been tested in a proof of concept study. This comprised a case study in which four master schedules developed by junior production managers were evaluated using the Schedule Health assessment method.

Findings

It is possible to construct a method for the quality evaluation of construction schedules.

Research Limitations/Implications

The completed testing is still rather limited since it is based merely on experiences of junior production managers with a single case.

Practical Implications

The Schedule Health assessment method can in a useful manner make the quality evaluation of construction schedules easy to approach and effective process.

Originality/Value

This research has produced a novel method for the quality evaluation of construction schedules.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 4 August 2023

Christopher Amoah

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the…

Abstract

Purpose

In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the construction of these houses is bedevilled with many issues; prominent among them are poor quality of the constructed houses. This study seeks to develop a quality management framework for achieving quality and efficiency in public-sector housing construction, a hallmark of the country's procurement goals.

Design/methodology/approach

Telephone interviews were conducted with construction professionals involved in constructing government social houses across South Africa, chosen randomly. The data gathered were analysed using the content analysis method.

Findings

The study found that the most significant cause of poor quality government-constructed social housing is multifaceted, categorised into project management-related, procurement-related, contractor-related, corruption-related and political-related.

Practical implications

Failure to develop and implement a quality management framework on government-constructed social housing leads to poor quality social housing.

Originality/value

The study has identified quality-related issues and has developed a Quality Management (QM) framework for the stakeholders involved in the construction of the houses to guide them in the project implementation process to ensure project success and quality standards.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 4 August 2022

Christopher Amoah and Hlatshwayo Nkosazana

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study…

4853

Abstract

Purpose

Contract risk management has become a critical mission, as contract issues may lead to a loss of vast amounts of money to parties involved or cause project failure. This study sought to identify effective management strategies to mitigate construction contract issues that might emerge during construction.

Design/methodology/approach

A quantitative research approach was adopted for the study. Structured questionnaires made up of close-ended questions were distributed to construction professionals in South Africa via the SurveyMonkey platform. The data were then analysed using descriptive statistics.

Findings

The findings indicate that the critical sources of contract-related disputes are ambiguous definitions of the contract parties' scope of their rights and obligations, lack of precise arrangements regarding the calculation of contractual penalties for failure to meet the deadline, lack of detailed specification of the works and specific milestones, lack of provisions regulating changes to the project documentation during the construction stage, an excessive amount of contractual penalties on contractor's side and lack of provisions regarding the rules of performing additional and replacement works and their settlement. However, for these disputes to be effectively managed, strategies such as reduction uncertainties in project's phases, setting up contingency plans, construction guarantee, extension of time claims, payment guarantee, retention and escalation clause should be implemented by the parties involved.

Research limitations/implications

Even though the empirical study focused on construction professionals in South Africa, the findings could be applied to other countries outside of South Africa.

Practical implications

To effectively manage and prevent contract disputes from averting project failures and losses to parties involved in the contract, construction professionals need to be aware of strategies that must be implemented before and during the project execution. If well implemented, these strategies will help a construction project be successful and experience fewer contractual disputes.

Originality/value

The study has identified the knowledge gap concerning suitable contract risk management strategies available for implementation to effectively prevent any contract parties from losing money, time and project failure.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 4 April 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa and Mantoa Ramotshela

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about…

4600

Abstract

Purpose

Stakeholder engagement in construction projects is an ingredient that contributes to project optimal performance. Many developing countries have a paucity of literature about stakeholders' engagement in construction projects. Therefore, the study investigated South Africa's shareholders' engagement in construction projects and recommended possible measures to mitigate potential limitations.

Design/methodology/approach

The researchers collated data from South African experts in stakeholder engagement via a phenomenology type of qualitative research design. They explored the “perceived hindrances” facing stakeholders' engagement in construction projects and proffer measures to mitigate them. The study analysed collected data via thematic analysis and achieved saturation. Three themes emerged from the analysed data.

Findings

Findings show that efficient stakeholder engagement will enhance team collaboration and integrated construction project delivery. Results identified the perceived limitations facing stakeholders' engagement in South Africa's construction projects and categorised them into individual perceived hindrances, organisational perceived hindrances and government-related perceived hindrances. Also, findings proffer measures to mitigate perceived hindrances via policies and programmes within the sector.

Practical implications

Besides enhancing policymakers and other stakeholders in South Africa's construction industry to understand the benefits of stakeholder engagement better, the study may stir up the construction sector's stakeholders to embrace enhanced and effective stakeholders' management.

Originality/value

This study contributes to construction project practice that involves stakeholders, as it reveals the underlying causes of perceived hindrances facing stakeholders' engagement in construction projects. Also, it proffers feasible solutions to mitigate these hindrances and enhance stakeholders' engagement within South Africa's construction projects.

Details

Benchmarking: An International Journal, vol. 31 no. 3
Type: Research Article
ISSN: 1463-5771

Keywords

Open Access
Article
Publication date: 21 September 2021

Mats Janné and Anna Fredriksson

The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and…

2993

Abstract

Purpose

The construction industry is reluctant to utilize construction logistics centres (CLC). To understand why, the purpose of the study is to increase the understanding of drivers and challenges of CLC utilization.

Design/methodology/approach

Adopting an activity-based cost methodology, nine construction projects' CLC utilization in a Swedish urban development project is analyzed for a time period of three years (2013–2016).

Findings

There is a difference between drivers and challenges for implementing and utilizing CLCs, which are often implemented to reduce third-party disturbances. The drivers to utilize a CLC, however, stem from achieving efficient logistics. The authors identify two different utilization strategies; the CLC is used either for just-in-time (JIT) deliveries or as a consolidation point.

Research limitations/implications

The study shows that construction logistics is to some extent repeating some mistakes of its big brother, city logistics. The study hypothesizes that there are differences between CLC implementation and utilization drivers and challenges that are often overlooked, which can explain the lack of CLC utilization.

Practical implications

The study shows that it is crucial for construction projects to develop and formulate a logistics strategy for how to utilize the setup, i.e. deciding whether to use the setup as a consolidation point leading to fewer deliveries and more materials on-site, or as JIT, leading to more deliveries but fewer materials on-site.

Social implications

CLCs can reduce environmental impact and third-party disturbances. However, to make this come true, acceptance among the users is needed. The study provides understanding of drivers and barriers for CLC implementation and utilization that can increase acceptance among users (i.e. construction projects).

Originality/value

The current study is one of the first studies to analyze CLC utilization.

Details

The International Journal of Logistics Management, vol. 33 no. 5
Type: Research Article
ISSN: 0957-4093

Keywords

Open Access
Article
Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…

13957

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 28 October 2021

Gavin Dennehy, Bobby Kennedy and John Spillane

The purpose of this study is to identify the factors relating to the integration and compliance of Building Control (Amendment) Regulations 2014 (BC(A)R 2014) in large Irish…

1015

Abstract

Purpose

The purpose of this study is to identify the factors relating to the integration and compliance of Building Control (Amendment) Regulations 2014 (BC(A)R 2014) in large Irish construction organisations.

Design/methodology/approach

To achieve the aim, a mixed method approach is adopted, initially, providing a critique of the literature review, followed by a combination of 7 semi-structured interviews and 30 questionnaires from industry practitioners.

Findings

Findings demonstrate that BC(A)R has had a significant positive effect on the industry, eliminating previous bad practice, by increasing the accountability for professionals signing-off on new buildings, and highlights the emphasis on certification in successfully achieving practical completion on projects.

Practical implications

The findings provide further justification on the need for compliance, and integration, of BC(A)R in the Irish construction sector, offering further evidence, where needed, on the benefit of its adoption.

Originality/value

The originality and value of this research lies in the limited number of studies in the area, particularly in the context of large Irish construction projects, which this study aims to fulfil.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords