Article
Publication date: 7 November 2008

Grant Keeble Kululanga and Witness Shaibu Kuotcha

Some of the vital lessons that could have been learned from project reviews are lost by contractors because of lack of a structured framework for undertaking them. Even though the…

1551

Abstract

Purpose

Some of the vital lessons that could have been learned from project reviews are lost by contractors because of lack of a structured framework for undertaking them. Even though the construction business environment has moved toward modernising some of its business processes, unnecessary loss of lessons still characterise the industry. This paper aims to report a study that explores the development of a structured tool for measuring the constructs of the project review process in order to ensure organisational learning.

Design/methodology/approach

To ascertain the significance of the project review process, a study was undertaken in Malawi. A questionnaire survey was employed to elicit data on the constructs of the project review process that was distributed to Malawian registered construction contractors. Of the 84 sampled construction contractors, 60 completed questionnaires were received.

Findings

The results suggest that size and experience play a significant role in the way that construction contractors appropriate lessons from the various constructs of project reviews. Furthermore, the enablers of project review were significantly correlated to lessons learned, shared and planned for implementation at p <0.01 for a correlation coefficient of 0.875. However, implementation plans and application of total quality management tools in conducting project reviews had by far the least mean scores.

Research limitations/implications

The study forms the basis for further research; replication of this study to other parts of world could yield rich lessons for construction industry.

Originality/value

The constructs of project review process employed in this study can be used to design intervention frameworks for capturing lessons learned.

Details

Engineering, Construction and Architectural Management, vol. 15 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 19 October 2022

Ayodeji E. Oke

Sustainability of construction project is incomplete without putting into consideration the health and safety of the workforce and other stakeholders working on a project

Abstract

Sustainability of construction project is incomplete without putting into consideration the health and safety of the workforce and other stakeholders working on a project environment. One of the criteria used to evaluate the performance of a sustainable construction project is health. This chapter gives an insight on health as a yardstick for measuring the success of a sustainable construction project, with respect to the health of the personnel working on a project, meaning of health, what constitutes health and health in construction. It also buttresses value of the health of workforce in construction and the need to see health as an important project performance index, as a healthy construction manpower on a construction project will determine and translate the quick delivery of construction project and on time.

Article
Publication date: 8 April 2024

Hasith Chathuranga Victar and Anuradha Samarajeewa Waidyasekara

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address…

Abstract

Purpose

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address these issues, this study explores the application of Circular Economy (CE) strategies in minimising waste generation and optimising resource utilisation in Sri Lankan construction industry. The research focuses on the construction and building renovation and use and operate stages of the building project life cycle, recognising their significance in waste generation and resource consumption.

Design/methodology/approach

The research employed a qualitative approach, utilising the Delphi technique through three rounds of expert interviews. Seventeen experts were involved in the first round, followed by fifteen in the second round, and twelve in the final round. The collected data was analysed using manual content analysis methods.

Findings

The research findings revealed fifteen C&D WM issues in the construction and building renovation stage in Sri Lanka, along with suitable strategies to overcome each of them. Similarly, eight C&D WM issues were identified for the use and operate stage of the building, and corresponding strategies were provided to address each issue. By adopting CE strategies such as modular design and material reuse, construction projects can optimise the project's timeline, cost, and quality factors. These strategies enable efficient resource allocation, reduce waste generation, and contribute to the overall sustainability of the project. The impact of CE strategies on mitigating these issues within the project management iron triangle was also discussed.

Originality/value

This paper entails delving into how construction, building renovation, and operation stages of a building's life cycle intersect with CE strategies, which profoundly influence operational efficiency and long-term sustainability. By incorporating principles such as energy efficiency, water conservation, and circular product design, the paper illuminates how these strategies facilitate decreased energy usage, enhanced resource management, and diminished waste production throughout the building's lifespan.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 April 2024

Handan Kunkcu, Kerim Koc and Asli Pelin Gurgun

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking…

Abstract

Purpose

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking work–family conflict and high-quality relationships among project team members and explore mediating effects of life and job satisfactions.

Design/methodology/approach

A theoretical framework was established based on the spillover theory and social exchange theory. Data were obtained by a questionnaire survey conducted with 328 respondents working in construction projects. Structural equation modeling (SEM) was used to test interrelationships among work–family conflict, job satisfaction, life satisfaction and high-quality relationship.

Findings

The results indicate that work–family conflict is negatively associated with both job and life satisfactions of construction professionals. In addition, there were direct and positive relationships between satisfaction domains and high-quality relationship capacity. The findings further support that job satisfaction plays a mediating role between work–family conflict and high-quality relationship among construction professionals, while life satisfaction does not mediate the relationship.

Originality/value

The effects of interrole conflicts on the context of satisfaction have been investigated previously; however, there is a lack of knowledge regarding its influence on high-quality relationship among project team members. This study extends the body of knowledge on high-quality relationships among project team members to understand how conflict and satisfaction factors influence interpersonal relationships in construction project management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 April 2024

Richard Kadan, Temitope Seun Omotayo, Prince Boateng, Gabriel Nani and Mark Wilson

This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While…

Abstract

Purpose

This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While past studies concentrated on selection and relationships, this study delved into how effective subcontractor management impacts project success.

Design/methodology/approach

This study used the Bayesian Network analysis approach, through a meticulously developed questionnaire survey refined through a piloting stage involving experienced industry professionals. The survey was ultimately distributed among participants based in Accra, Ghana, resulting in a response rate of approximately 63%.

Findings

The research identified diverse components contributing to subcontractor disruptions, highlighted the necessity of a clear regulatory framework, emphasized the impact of financial and leadership assessments on performance, and underscored the crucial role of main contractors in Integrated Project and Labour Cost Management with Subcontractor Oversight and Coordination.

Originality/value

Previous studies have not considered the challenges subcontractors face in projects. This investigation bridges this gap from multiple perspectives, using Bayesian network analysis to enhance subcontractor management, thereby contributing to the successful completion of construction projects.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 26 March 2024

Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An and Xueying Bao

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects

Abstract

Purpose

This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.

Design/methodology/approach

This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.

Findings

The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.

Originality/value

The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 February 2024

Agana Parameswaran, K.A.T.O. Ranadewa and Akila Pramodh Rathnasinghe

The proliferation of lean principles in the construction industry is offset by the enduring uncertainty among industry stakeholders regarding their respective roles in lean…

Abstract

Purpose

The proliferation of lean principles in the construction industry is offset by the enduring uncertainty among industry stakeholders regarding their respective roles in lean implementation. This uncertainty is further compounded by the scarcity of empirical investigations in this area. Consequently, this study undertakes the task of bridging this knowledge gap by identifying the critical roles of lean learners and their indispensable contributions to achieving successful lean implementation.

Design/methodology/approach

A qualitative exploratory approach informed by an interpretivism perspective was adopted. The case study strategy was employed to gather data from three contracting organisations that had implemented lean practices. Empirical data was collected through in-depth semi-structured interviews with fifteen industry experts and complemented by document reviews. To analyse the data, a code-based content analysis approach was employed using NVivo software, while Power BI software was utilised to develop a comprehensive force-directed graph visualisation.

Findings

The research findings substantiated nine lean learners and unveiled a set of seventy-three roles associated with them. The force-directed graph facilitated the identification of lean learners and their connections to the emerged roles. Notably, the graph highlighted the pivotal role played by project managers and internal lean trainers in ensuring the success of lean implementation, surpassing the contributions of other lean learners.

Originality/value

The implications of findings extend to industry professionals seeking to establish a robust lean learning framework to expedite lean implementation within the construction sector. This study not only provides a comprehensive definition of lean learners’ roles but also transcends specific construction types, making it a significant catalyst for global impact.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Book part
Publication date: 19 October 2022

Ayodeji E. Oke

Functionality as a measure of project performance encompasses definitions across literature, relevance and essentiality in construction as the industry moves towards sustainable…

Abstract

Functionality as a measure of project performance encompasses definitions across literature, relevance and essentiality in construction as the industry moves towards sustainable construction. Functionality in this section shows details in social functionality, as well as functionalities expressed in assessing, implementing project performance within set out target and goal. Furthermore, for functionality to be truly experienced in construction, many factors have to be gotten right. One of such is decision making that tends towards standard expatiated in the contract agreed without compromising budget, performance, collaboration, health and safety, communication, profit, satisfaction, quality, project cost, profitability among others.

Details

Measures of Sustainable Construction Projects Performance
Type: Book
ISBN: 978-1-80382-998-2