1 – 10 of 319Energy security concerns and regional economic interests are driving the construction of more coal mines and coal-fired power stations, though government mandates will set a cap…
Details
DOI: 10.1108/OXAN-DB286455
ISSN: 2633-304X
Keywords
Geographic
Topical
Afiqah R. Radzi, Nur Farhana Azmi, Syahrul Nizam Kamaruzzaman, Rahimi A. Rahman and Eleni Papadonikolaki
Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result…
Abstract
Purpose
Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result, industry professionals reject DT even in BIM-based construction projects due to reluctance to innovate. Furthermore, researchers have repeatedly developed tools and techniques with the same goals using DT and BIM to assist practitioners in construction projects. Therefore, this study aims to assist industry professionals and researchers in understanding the relationship between DT and BIM and synthesize existing works on DT and BIM.
Design/methodology/approach
A systematic review was conducted on published articles related to DT and BIM. A total record of 54 journal articles were identified and analyzed.
Findings
The analysis of the selected journal articles revealed four types of relationships between DT and BIM: BIM is a subset of DT, DT is a subset of BIM, BIM is DT, and no relationship between BIM and DT. The existing research on DT and BIM in construction projects targets improvements in five areas: planning, design, construction, operations and maintenance, and decommissioning. In addition, several areas have emerged, such as developing geo-referencing approaches for infrastructure projects, applying the proposed methodology to other construction geometries and creating 3D visualization using color schemes.
Originality/value
This study contributed to the existing body of knowledge by overviewing existing research related to DT and BIM in construction projects. Also, it reveals research gaps in the body of knowledge to point out directions for future research.
Details
Keywords
Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…
Abstract
Purpose
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.
Design/methodology/approach
Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.
Findings
The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.
Originality/value
A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.
Details
Keywords
Francis Nuako, Frank Ato Ghansah and Thomas Adusei
It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…
Abstract
Purpose
It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”
Design/methodology/approach
This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.
Findings
This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.
Practical implications
When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.
Originality/value
The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.
Details
Keywords
Stella Lippolis, Dario Dell’Osa and Ezio Ritrovato
Through the reconstruction of the events of some foreign entrepreneurs who worked in the territory of the Italian city of Bari in the first half of the 19th century, this paper…
Abstract
Purpose
Through the reconstruction of the events of some foreign entrepreneurs who worked in the territory of the Italian city of Bari in the first half of the 19th century, this paper aims to analyze the role of entrepreneurial migration in the economic development of Apulia land in this period.
Design/methodology/approach
This study adopts a theoretical framework that combines the concept of mixed embeddedness in a multifocal perspective, with the model of the diffusion of innovation focusing on the role of the so-called agency of actors, and of the network, in the dissemination of innovation. The theoretical framework is applied to multiple case studies to compare the evidence that emerged from the simultaneous analysis of several situations.
Findings
By analyzing how innovations have spread within the network of entrepreneurs of that time, it is possible to identify some relevant aspects related to the mechanisms of dissemination of innovations in the context of entrepreneurial migration. Specifically, the opportunity structure is intended in an even broader sense than indicated in the classic approach to mixed embeddedness: it is considered as the result of the joint interaction of the political, institutional and economic context of several places, and the behavioral dynamics of several groups.
Research limitations/implications
Due to the specific method chosen, the outcomes of the research might apply to a narrow context. Therefore, the results need to be tested and confirmed in further empirical studies, and by applying multiple research methods.
Practical implications
Findings are useful and significant in the analysis of the link that exists between the diffusion of innovations and migrant entrepreneurship, and then the conclusions can be applied and extended to the current phenomenon of migration-related innovations, with specific reference to developing countries.
Social implications
Findings can be applied and extended to the current phenomenon of migration-related innovations and highly skilled migration, with specific reference to developing countries.
Originality/value
This paper contributes to shed new light on the contextual and multifocal factors that influence the development of innovations in the networks of migrant entrepreneurship, in a specific historical period and a specific context. Combining social, human and financial capital with the wider opportunity structure, this study also provides a comprehensive understanding of the modalities through which migrant and high-skilled entrepreneurs could innovate.
Details
Keywords
Angeliki Kylili, Phoebe-Zoe Georgali, Petros Christou and Paris Fokaides
The built environment is taking enormous leaps towards its digitalization. Computer-aided tools such as building information modeling (BIM) are found in the forefront of this…
Abstract
Purpose
The built environment is taking enormous leaps towards its digitalization. Computer-aided tools such as building information modeling (BIM) are found in the forefront of this evolution, playing a critical role in creating the foundations for the upcoming development of smart low-carbon cities. However, the potential of BIM is still untapped – links will need to be created among the available and forthcoming methodologies under one integral operational system. The purpose of this paper is to present an integrated BIM-based life cycle-oriented framework for achieving sustainable constructions at the pre-construction phase. The developed framework represents an example of the approaches that the construction industry will need to adopt to integrate the different tools under an integrated smart city context.
Design/methodology/approach
The methodological approach follows the development of four same-volume different-configuration three-dimensional BIM designs, which are coupled with life cycle assessment (LCA) tools for establishing sustainable building design.
Findings
The results of this paper indicated that the choice of building design and shape can play a significant role in reducing the embodied energy and embodied carbon of buildings, achieving a reduction of up to 15% compared to a reference building of same volume and gross floor area.
Originality/value
The originality of this paper is found in its approach application by coupling three-dimensional BIM models with LCA data, the use of reinforcement detailing in an nD BIM study and the employment of country-specific LCA databases.
Details
Keywords
Giulia Piantoni, Laura Dell'Agostino, Marika Arena and Giovanni Azzone
Measuring shared value (SV) created in innovation ecosystems (IEs) is increasingly relevant but complex, given the multidimensional and multiactor nature of both concepts, which…
Abstract
Purpose
Measuring shared value (SV) created in innovation ecosystems (IEs) is increasingly relevant but complex, given the multidimensional and multiactor nature of both concepts, which challenges traditional performance measurement systems (PMSs). Moving from this gap, the authors propose an integrated approach to extend the balanced scorecard (BSC) for measuring and monitoring SV creation at IE level.
Design/methodology/approach
The proposed approach combines the most recent contributions on PMS in IEs and SV to define perspectives and dimensions that are better suited to deal with the nature of both IEs and SV. The approach is also applied to the real case (Alpha) of an Italian IE through a step wise method. Starting from the IE vision, the authors identify in the strategy map the specific objectives related to each perspective/dimension combination and then associate a performance indicator with each objective.
Findings
The resulting SV BSC is composed of indicators interconnected along different perspectives and dimensions. The application of the approach to the real case proves its feasibility and highlights characteristics, advantages and disadvantages of the SV BSC when used at IE level. The authors also provide guidelines for its application to other IEs.
Originality/value
The study contributes to the research on PMS by introducing and applying to a real case an integrated approach to assess SV in IEs, overcoming the shortcomings of PMS framed for single firms. It can be of interest for both researchers in the field of ecosystems value creation and practitioners managing or promoting such complex structures.
Details
Keywords
Rhoda Ansah Quaigrain, De-Graft Owusu-Manu, David John Edwards, Mavis Hammond, Mabel Hammond and Igor Martek
Occupational safety issues among employees remains a contemporary and omnipresent concern. In developing countries, safety-related problems are amplified, resulting in higher…
Abstract
Purpose
Occupational safety issues among employees remains a contemporary and omnipresent concern. In developing countries, safety-related problems are amplified, resulting in higher incidences of serious accidents and occupational diseases. This study aims to evaluate employees’ knowledge and attitudes toward occupational health and safety, and how these influence overall occupational health and safety compliance. Ghana’s oil and gas industry provides the contextual backdrop for this research, given it is characterized by high rates of injury.
Design/methodology/approach
A positivist and deductive research strategy was used to quantitatively analyze both primary and secondary data sources. A structured survey was administered to industry employees, and multiple linear regression was used to establish the effects of employee’s knowledge and attitude toward occupational health hazards on overall health and safety compliance.
Findings
The findings indicate that most employees had both a high level of knowledge and positive attitude toward mitigating occupational health hazards. Moreover, the study reveals that most employees complied with occupational health safety practices. However, the study also reveals that the effect of employees’ knowledge and attitude toward occupational health hazards does not translate into deployment of comprehensive safety practices. Interestingly, female employees were found to be more knowledgeable and compliant with occupational health and safety practices than their male counterparts.
Practical implications
Premised upon the findings, the study recommends: implementation of relevant education and training programs encompassing the proper usage of machinery and equipment, tailored hazard safety training appropriate to specific employee job requirements, effective dissemination of risk information and governance initiatives that enforce strict adherence to correct safety procedures.
Originality/value
The study uniquely examines the influence of employee’s knowledge of health and safety to overall compliance within the oil and gas industry. Cumulatively, the study’s findings and recommendations contribute to improving the occupational health and safety outcomes within the industry.
Details
Keywords
The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…
Abstract
Purpose
The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.
Design/methodology/approach
A systematic literature review was conducted to fulfill the purpose of this study.
Findings
The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.
Originality/value
The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.
Details
Keywords
Ewald Kuoribo, Peter Amoah, Ernest Kissi, David John Edwards, Jacob Anim Gyampo and Wellington Didibhuku Thwala
Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work…
Abstract
Purpose
Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work outside of their geographical spectrum; however, the multicultural dissimilarities of construction workforces within the project management team (and how these may impact upon project productivity performance) have been given scant academic attention. To bridge this knowledge gap, this paper aims to analyse the effects of a multicultural workforce on construction productivity.
Design/methodology/approach
The epistemological positioning of the research adopted mixed philosophies (consisting of both interpretivism and postpositivism) to undertake a deductive and cross-sectional survey to collate primary quantitative data collected via a closed-ended structured questionnaire. Census sampling and convenience sampling techniques were adopted to target Ghana’s construction workforce and their opinions of the phenomenon under investigation. Out of 96 questionnaires administered, 61 were retrieved. The data obtained were analysed by using mean score ranking, relative important index, one sample t-test and multiple regression. The reliability of the scale was checked by using Cronbach’s alpha coefficient.
Findings
From the t-test analysis, 11 variables sourced from extant literature, and the null hypothesis for the study was not rejected and all factors (except high cost of training and improper gender diversity management) were affirmed as negative effects of the multicultural workforce on construction productivity. Using multiple regression analysis, six of the independent variables were shown to impact upon productivity. The goodness of fit was verified by collinearity and residual analysis. The model’s validation revealed a relatively high predictive accuracy (R2 = 0. 589), implying that the results could be generalized. In culmination, these findings suggest that the predictors can be used to accurately predict the effects of multicultural workforce on construction productivity performance.
Practical implications
The findings indicate that multicultural workforce/teams have a substantial effect on overall construction productivity in the construction sector; consequently, stakeholders must address this issue to enhance productivity across the sector.
Originality/value
The current study significantly contributes to our understanding of how multicultural workers/teams affect construction productivity in the construction business perspective and how to respond to the negative menace.
Details