Search results

1 – 10 of over 67000
Article
Publication date: 7 October 2019

Lesiba George Mollo, Fidelis Emuze and John Smallwood

The manufacturing industry is a well-known source of interventions adapted to solve problems in the construction industry. The use of Training-Within-Industry (TWI) is one such…

Abstract

Purpose

The manufacturing industry is a well-known source of interventions adapted to solve problems in the construction industry. The use of Training-Within-Industry (TWI) is one such intervention adopted in the construction industry to solve the construction problem relating to occupational health and safety (OHS). The objectives of TWI are to help the industry to transfer knowledge and skills from management to the employees. Therefore, the purpose of this paper was to investigate whether TWI can reduce OHS problems by promoting “learning by doing” on construction sites.

Design/methodology/approach

A case-based-research method was used to investigate the reported OHS problems in the construction industry in South Africa. The data were quantitative and qualitative in nature; the questionnaire survey, semi-structured interview and focus group interview techniques were used to collect data in the study.

Findings

The findings provide a better understanding of the human contributions influencing the behaviour of people causing accidents on construction sites. The data show that construction project leaders struggle to promote “learning by doing” because of inappropriate behaviour, lack of communication and inadequate training provided to new workers on construction sites. Also, there is significant scope for TWI deployment in construction because of the inability of supervisors or management to promote “learning by doing” on construction sites.

Practical implications

Based on the research findings, it is discovered that OHS is a serious concern in the construction industry. Therefore, the adoption of learning by doing on a construction site would help to improve OHS outcome.

Originality/value

The study highlights the need to introduce TWI on construction sites to reduce human failure causing accidents. TWI could lead to improving the knowledge- and skills-transfer programmes for construction workers in favour of better safety performance.

Details

Journal of Financial Management of Property and Construction , vol. 24 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 1 March 2005

J.E. Tookey, P.A. Bowen, C. Hardcastle and Murray

The construction industry in the UK has been subject to frequent reports over recent years, all focusing on perceived inefficiencies within the industry and how processes can be…

Abstract

The construction industry in the UK has been subject to frequent reports over recent years, all focusing on perceived inefficiencies within the industry and how processes can be improved to deliver construction projects on time, and within cost and quality targets. Most notable of these reports have been Latham (1994) and Egan (1998), which contend that construction should come closer to manufacturing in design, development and supply chain practices to achieve ambitious improvement targets. The most frequently mentioned industries for such “benchmarking” are the aerospace and automotive industries. Concurrent Engineering (CE) appears to offer significant potential to the construction industry as a means to achieve these targets. This paper identifies key aspects of CE practice in aerospace manufacturers and, in the spirit of the Egan report, possibilities for their adoption in UK construction projects.

Details

Journal of Engineering, Design and Technology, vol. 3 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 April 2012

Adnan Enshassi, Faisal Arain and Bassam Tayeh

Subcontractors play a significant role in the Palestinian construction industry as about 90 per cent of the work is performed by subcontractors. The main objective of this paper…

1792

Abstract

Purpose

Subcontractors play a significant role in the Palestinian construction industry as about 90 per cent of the work is performed by subcontractors. The main objective of this paper is to identify and analyse the major problems which exist between the contractors and subcontractors in the construction industry in the Gaza Strip.

Design/methodology/approach

A questionnaire was designed to elicit contractors' and subcontractors' viewpoints regarding the most important causes of problems that affect the relationship between them. A total of 53 problems were identified based on a literature review, a pilot study was considered in this study and was listed under five groups. A total of 150 questionnaires were randomly sent to contractors and subcontractors. The respondents had extensive experience in the construction industry with average working experience of 20 years. The questionnaire was validated by the criterion‐related reliability test that measures the correlation coefficients between the factors selected for in each group and for all groups as one entity, and structure validity test (Spearman test).

Findings

The result of the survey indicated that, assigning part of the works to new subcontractor without informing the original subcontractor, contractor's financial problems, delay in contract progress payments, non‐adherence to the conditions of the contract, non‐adherence of the subcontractor to the time schedule, and lack of construction quality work were the most important causes of interface problems, while involvement in several projects with the contractor at the same time, weather conditions, and geological problems on site were considered as trivial causes of potential interface problems. Spearman's rank correlation tests showed that there are no differences in the viewpoints between contractors and subcontractors.

Originality/value

The research findings might assist practitioners to focus on major problems which have existed between the contractors and subcontractors in the construction industry in their present and future projects. By eliminating or minimizing these problems, subcontractors are encouraged to contribute significantly to the capital risk, resources, managerial effort, and business expertise supporting the largest industry in Palestine. The paper would be valuable for all academics and industry professionals involved in construction business in general.

Details

Journal of Financial Management of Property and Construction, vol. 17 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 23 September 2019

Sparsh Johari and Kumar Neeraj Jha

The purpose of this paper is to investigate the factors that discourage construction workers from undergoing skill development training, and to suggest steps for making the…

1639

Abstract

Purpose

The purpose of this paper is to investigate the factors that discourage construction workers from undergoing skill development training, and to suggest steps for making the training programmes more attractive to them.

Design/methodology/approach

The research used an exploratory approach of unstructured interviews with construction workers (bottom-up approach), and the guided group brainstorming technique with the help of experienced industry professionals (top-down approach).

Findings

From the unstructured interviews, five inhibiting factors were identified which discourage construction workers from undergoing training. Furthermore, to recognise the causes of the inhibiting factors, 13 possible causal attributes (PCAs) were identified from the brainstorming approach. Subsequently, these PCAs were classified into five possible causal factors (PCFs) on the basis of those concerned stakeholder(s) that are most closely involved and most responsible for fixing them.

Research limitations/implications

The research provides recommendations to practitioners for pragmatic and permanent resolution of each of the PCFs, which serves as a framework for the construction industry to reduce the scarcity of trained workers in the industry. Also, the results may serve as a model for the planning and successful implementation of any new skill-training programme for the construction workers in any developing economy, such as India.

Originality/value

This research contributes to the literature by highlighting the views of construction workers on the training establishments, which very few studies have considered in the past. Also, the research provides a detailed process of brainstorming approach, which will help the research community to appreciate its use in studies related to the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 6 February 2023

Begum Sertyesilisik

Production-related industrial zones, super structures and infrastructures are constructed by the construction industry. Nearly all industries and their environmental emissions are…

Abstract

Production-related industrial zones, super structures and infrastructures are constructed by the construction industry. Nearly all industries and their environmental emissions are influenced by the construction industry including its sub-industries, companies and their supply chains. Furthermore, cities play an important role in economic growth. Cities are hubs for productivity, production, supply and demand, and innovation with the help of their human capital and built environment (e.g. offices, factories, industrial zones, infrastructures, etc.).

Industrial growth fosters urbanisation which is vital for the supply side in the economy to reach to the human resources. Urbanisation which supports industrial growth obstacles industries’ efficiency due to urbanisation problems (e.g. traffic, air and water pollution, health problems).

Construction industry and its sub-industries affect total factor productivity growth in nearly all industries. Construction industry can be a facilitator industry for economic growth and industrial growth considering total factor productivity growth and environment aspects. All industries’ green and sustainable total factor productivity growth can be supported by rethinking construction industry, its sub-industries and their outputs (e.g. construction materials, built environment, cities) as well as construction project management processes.

This chapter aims to introduce carbon capturing smart construction industry model to foster green and sustainable total factor productivity growth of industries. This chapter emphasises current and potential roles of construction industry, its sub-industries and their outputs in fostering other industries’ growth through green and sustainable total factor productivity growth. It focusses on carbon capturing technologies and design at different levels. Furthermore, this chapter emphasises cities’ role in green and sustainable total factor productivity growth. This chapter provides recommendations for construction industry policies and carbon capturing cities/built environment model to solve urbanisation problems and to foster industrial growth and green and sustainable total factor productivity growth. This chapter is expected to be useful to all stakeholders of the construction industry, policy makers, and researchers in the relevant field.

Details

The Impact of Environmental Emissions and Aggregate Economic Activity on Industry: Theoretical and Empirical Perspectives
Type: Book
ISBN: 978-1-80382-577-9

Keywords

Article
Publication date: 29 April 2021

Sevilay Demirkesen and Algan Tezel

The purpose of this study is to explore the challenges hindering the adoption of Industry 4.0 (I4.0) among construction companies.

3150

Abstract

Purpose

The purpose of this study is to explore the challenges hindering the adoption of Industry 4.0 (I4.0) among construction companies.

Design/methodology/approach

The construction industry needs innovative technologies due to its complex and dynamic nature. In this respect, the latest trends such as digitalization, building information modeling (BIM), Internet of things (IoT) are of utmost importance in terms of fostering the change in managing projects and encouraging industry practitioners to adopt the change for better performance. This paper focuses on I4.0adoption among construction companies. In this respect, a questionnaire was designed and administered to construction professionals to reveal the challenges in I4.0 adoption among construction firms. The respondents were requested to fill in the questionnaire on the I4.0 efforts of their companies. The questionnaire was intended to collect the perceptions of industry practitioners working at large construction companies. Based on these, the challenges listed were ranked based on their relative importance and success indices. Finally, the Mann–Whitney U test was conducted to test whether statistically significant responses exist among groups of respondents (i.e. young and old companies, large and small, high and low revenue and main area of expertise).

Findings

The results of the study indicated that resistance to change, unclear benefits and gains and cost of implementation are the major important challenges in terms of I4.0 adoption in construction projects. On the other hand, the data analysis implied that the majority of construction organizations successfully deal with the problems arising from lack of standardization, legal and contractual issues and cost of implementing in terms of promoting I4.0 adoption.

Research limitations/implications

The study is expected to guide construction practitioners in terms of benefitting from I4.0 applications and deliver projects with better outcomes. This study might be used as a guide for the companies aiming to start their I4.0 transformation knowing the challenges and develop strategies for how to handle them. A concrete plan would help them achieve greater performance and benefit from the I4.0 implementation at the maximum level. Finally, the study implies that construction firms shall prepare action plans for handling each challenge listed and monitor their performance based on the planned and actual data of their projects.

Originality/value

This study investigates the major challenges of I4.0 among construction companies. This is one of the important studies, which puts I4.0 focus forefront of the construction industry with a clear identification of challenges that construction organizations have to address to transform their organizations into construction 4.0. The study has the potential to guide both industry practitioners and researchers to develop awareness for the benefits of using the latest technology and fostering innovation. This is expected to create value for construction clients in terms of achieving the product with serious gains such as time and cost.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 April 2010

Wafaa Nadim and Jack S. Goulding

The purpose of this paper is to report on findings from the first stage of an ongoing research with regard to the UK construction industry's perception of offsite production (OSP…

6641

Abstract

Purpose

The purpose of this paper is to report on findings from the first stage of an ongoing research with regard to the UK construction industry's perception of offsite production (OSP) adoption/uptake, in an attempt to inform the second stage of the research (not reported in this paper) to infer the skills/knowledge areas needed for the wider uptake of OSP.

Design/methodology/approach

The objective of this paper was to capture the UK construction industry's perception vis‐à‐vis OSP characteristics using a quantitative approach. Postal surveys were employed to collect industry perception which was then analysed statistically for inference and conclusion.

Findings

Findings from 36 large construction organisations suggest that irrespective of respondents' organisations prime activity or professions, the majority of respondents perceive OSP to be the future of the UK construction industry; with a considerable belief that the industry is ready to embrace OSP. Nevertheless, the industry do not seem to fully appreciate OSP, which is implied by the uncertainty recorded in most of the responses.

Research limitations/implications

Whilst the data validity and sample set coherence can be considered robust and defendable, it should be acknowledged that care needs to be taken when interpreting results, especially as the data collected depended heavily on the survey approach. Furthermore, these findings are limited to the UK context only, as such, the level of generalisability/repeatability outside this context may not be representative of the findings presented here.

Originality/value

OSP falls under the overarching umbrella of modern methods of construction, which is high on the UK Government Agenda. OSP has attracted numerous research over the last decades; however, there is limited literature to quantify industry perception in this regard, especially to enable the inference and prioritisation of skills and knowledge areas needed to support the wider uptake of OSP (not reported in this paper).

Details

Construction Innovation, vol. 10 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 1 August 2019

Desalegn Girma Mengistu and Gangadhar Mahesh

The state of the different practices in construction industry determines its performance level. Hence, improving performance of construction industry needs assessing state of the…

Abstract

Purpose

The state of the different practices in construction industry determines its performance level. Hence, improving performance of construction industry needs assessing state of the practices in the industry and devising improvement intervention. The purpose of this paper is to measure improvement requirement level of different construction management practice areas and to identify the underlying improvement dimensions in Ethiopian construction industry.

Design/methodology/approach

Questionnaire survey was developed for data collection based on a thorough literature review which yielded 28 construction management practice areas. Purposive sampling method was used to select respondents for the survey. Mean score was used to identify the required improvement level, and one sample T-test was carried out to identify significance of improvement requirement. Factor analysis was conducted to identify the underlying dimensions of the construction management practice areas.

Findings

Findings indicate 27 areas need significant improvement. This shows the low level of adoption of good construction management practices in Ethiopian construction industry. Factor analysis resulted in the areas being grouped to four broad improvement dimensions, namely, project management, organization management, knowledge and risk management and project development and contract management.

Originality/value

The findings provide information for appropriate action by the stakeholders to raise standards of adopted construction management practices. It also show areas of construction management which require more focused research in the context of Ethiopian construction industry. Considering the similarity of nature of construction industry problems in developing countries, the findings can be extended to similar countries.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 February 2001

GEORGE OFORI and GU GANG

The construction management literature discusses the benefits which companies derive from having their operations certified to the ISO 9000 series of quality management systems…

Abstract

The construction management literature discusses the benefits which companies derive from having their operations certified to the ISO 9000 series of quality management systems (QMS). In Singapore, quality has been a topical issue in the construction industry for the past decade. ISO 9000 certification, which has been a major part of the construction quality development programme, is now mandatory for large construction contracting and consultancy organizations wishing to register to undertake public‐sector projects. This paper reports on a study on the role which ISO 9000 implementation plays in the quality development of Singapore's construction industry by ascertaining the perceptions, objectives, motivations and experiences (including benefits and problems) relating to quality in general, and to ISO 9000 certification and implementation in particular. A questionnaire‐based survey of large construction companies was conducted. It was found that construction firms benefit from QMS certification, and face no significant problems with it. Recommendations are made for enhancing the benefits of ISO 9000 and ensuring that it has a positive long‐term impact on the development of Singapore's construction industry.

Details

Engineering, Construction and Architectural Management, vol. 8 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2021

Mahdi Bastan, Masoumeh Zarei, Reza Tavakkoli-Moghaddam and Hamed Shakouri G.

The Iranian construction industry has been grappling with numerous problems in recent years, including rework, high costs and design errors. Engineers in this field have always…

1282

Abstract

Purpose

The Iranian construction industry has been grappling with numerous problems in recent years, including rework, high costs and design errors. Engineers in this field have always highlighted the use of modern technological methods of construction to improve quality and productivity and reduce time and cost. One of these technologies is the so-called building information modeling (BIM), which has been very difficult to adopt and implement in Iran. The purpose of this study is to propose a systemic and holistic model to analyze the dynamics of adoption and implementation of BIM in this country. The purpose of this paper is to understand the dynamics of BIM acceptance to identify the most effective policy to maximize it in the Iranian manufacturing industry.

Design/methodology/approach

A two-stage methodology has been developed to achieve the purpose of the research. In the first stage, a technology acceptance model for BIM acceptance was developed using the grounded theory (GT) method. This conceptual model provides a holistic basis for building a simulation model. Thus, in the second stage, we used the dynamics system methodology to extract a dynamic model from the conceptual one. This dynamic model can simulate different policies and may be used to evaluate their respective effectiveness.

Findings

In this study, using the GT method, we obtained 510 primary codes, 118 secondary codes, 50 concepts and 17 categories. After determining the relationships between categories through axial coding, we reached a conceptual model based on selective coding. Mention some of the variables of the conceptual model. Awareness, security, perceived usefulness and perceived ease of use are some of the most important variables of this model. In the next part, this conceptual model was run using system dynamics and, thus, turned into a causal model in which all the effective variables on BIM technology and their relationships with each other are specified. The stock and flow diagram of the problem and its related equations were presented. To improve the model and solve the problem, we examined the four policies as four future scenarios on the model: continuing the status quo, development of specialist workforce training, bolstering governmental support and increasing awareness via advertisement within. The simulation results showed that government support is the most effective policy for maximizing BIM acceptance in Iran.

Practical implications

In addition to enumerating all the factors affecting BIM technology, this paper proposes a systemic model that provides an accurate and comprehensive view of the acceptance of this technology. In this regard, by introducing feedback loops, as well as reinforcing and balancing factors versus factors causing stasis, the model offers a much deeper insight into mechanisms associated with BIM development and its barriers. Therefore, this study provides a very useful perspective and basis for policy-makers and all stakeholders to accept and implement BIM technology. The findings of this study can lead to more accurate policy-making, removal of acceptance barriers, promotion of incentives, and consequently more effective acceptance of BIM technology.

Originality/value

In this study, a new mixed research method was used. The innovation of our study lies in its simultaneous use of GT method to construct an accurate and holistic model and applying the system dynamics methodology to build a holistic and systemic model of the BIM acceptance problem. This research also provides a suitable standard and tool for studying BIM technology in developing countries.

Details

Kybernetes, vol. 51 no. 1
Type: Research Article
ISSN: 0368-492X

Keywords

1 – 10 of over 67000