1 – 10 of over 3000Abdulkabir Opeyemi Bello, Doris Omonogwu Eje, Abdullahi Idris, Mudasiru Abiodun Semiu and Ayaz Ahmad Khan
The growing demand for housing and infrastructure, as well as the requirement for affordable housing, has been a significant factor, necessitating investigation for sustainable…
Abstract
Purpose
The growing demand for housing and infrastructure, as well as the requirement for affordable housing, has been a significant factor, necessitating investigation for sustainable approaches and implementation of alternative construction innovations. Hence, this study aims to identify and assess the drivers for implementing modular construction systems (MCS) in developing countries.
Design/methodology/approach
The study adopts a quantitative research approach to seek respondents’ opinions on the factors that can drive the implementation of MCS in developing countries. Accordingly, a structured questionnaire was used as an instrument of data collection based on five Likert scales. The data was analysed using the mean score, one sample t-test, Kruskal–Wallis, factor analysis (FA) and Pearson correlation analysis.
Findings
Results show that 15 of the 16 major identified drivers were statistically significant towards implementing MCS, which indicates that the drivers are crucial for implementing MCS in developing countries. However, the Kruskal–Wallis test reveals that the respondents have varying opinions on the identified drivers. FA categorised the drivers into four categories, namely, “management and sustainability”, “key performance”, “know-how and logistics” and “regulations and policies”. A strong relationship among the four categories of drivers was established using Pearson correlation, which indicated that all the drivers’ categories are essential for implementing MCS in developing countries.
Originality/value
This study identified and assessed the drivers towards implementing MCS in developing countries. The study concludes that the identified drivers are essential for implementing MCS in developing countries. Also, the study considers the government the most placed player in driving the implementation of MCS in developing countries.
Details
Keywords
Abdulkabir Opeyemi Bello, Ayaz Ahmad Khan, Abdullahi Idris and Hamzat Mohammed Awwal
This study aimed to identify and assess the barriers to implementing modular construction systems (MCS) in developing country's architecture, engineering and construction (AEC…
Abstract
Purpose
This study aimed to identify and assess the barriers to implementing modular construction systems (MCS) in developing country's architecture, engineering and construction (AEC) industry, targeting built environment professionals from Nigeria and South Africa.
Design/methodology/approach
The study adopted a quantitative research method, using a structured questionnaire to seek the opinions of the professionals on the identified categories of barriers.
Findings
Results indicated that all identified categories of barriers were statistically significant using a one-sample t-test at p = 0.05 significance level which indicates they are critical towards the implementation of MCS in developing countries. Assessment of the opinion of the professionals using the Kruskal–Wallis scale showed that they hold similar views on the barriers to the adoption of MCS. Pearson correlation shows a high correlation coefficient amongst the barrier categories and an acceptable level of significance (p = 0.05).
Research limitations/implications
This study is limited to two significant African countries (Nigeria and South Africa) selected based on the gross domestic product (GDP). Further studies can consider developing countries outside Africa and investigate broader respondents.
Practical implications
The study provides implications on the barriers affecting MCS in developing countries for the academia, industry and government to have an insight into the barriers and make informed decisions and policies.
Originality/value
The research satisfies the need to study the barriers affecting the MCS in developing countries that can mitigate housing deficits. This innovative construction method has been adopted and implemented in developed countries, and the result has been positive.
Details
Keywords
Phuong T.C. Phan and Zhipeng Zhou
This paper aims to inquire into the awareness of Vietnamese architects about design for safety (DfS) and the level of engagement in applying DfS among them to get a generic view…
Abstract
Purpose
This paper aims to inquire into the awareness of Vietnamese architects about design for safety (DfS) and the level of engagement in applying DfS among them to get a generic view of the implementation of DfS in Vietnam.
Design/methodology/approach
Quantitative research was used, in which a questionnaire was sent to Vietnamese architects to evaluate how they consider and apply DfS in the design process. Inferential and descriptive statistics then analysed the obtained data to identify the role of each factor.
Findings
The results from the survey conclude that Vietnamese architects have low engagement in applying DfS despite their high awareness and positive attitude towards DfS. Besides, the participants showed the need for further DfS education and training, which is lacking in Vietnamese formal education. In addition, the research also confirms that DfS education and training have positive impacts on the frequency of DfS implementation in Vietnam.
Research limitations/implications
This research contributes to the knowledge of DfS implementation in developing countries. In line with this, further studies on the DfS concept in developing countries are needed to draw a more objective overview and give the solution for the low DfS appliance.
Originality/value
To the best of the authors’ knowledge, this is the first study inquiring into the implication of DfS in Vietnam, contributing to improving the lack of knowledge in this field in developing countries and Vietnam in particular.
Details
Keywords
Ahmed Farouk Kineber, Ayodeji Emmanuel Oke, Ali Hassan Ali, Oluwaseun Dosumu, Kayode Fakunle and Oludolapo Ibrahim Olanrewaju
This study aims to explore the critical application areas of radio frequency identification (RFID) technology for sustainable buildings.
Abstract
Purpose
This study aims to explore the critical application areas of radio frequency identification (RFID) technology for sustainable buildings.
Design/methodology/approach
The quantitative research approach was adopted through a structured questionnaire administered to relevant stakeholders of construction projects. The data collected were analysed with the exploratory factor analysis, relative importance index (RII) and fuzzy synthetic evaluation (FSE).
Findings
The study’s results have categorised the crucial areas of application where construction industry stakeholders should focus their attention. These areas are divided into four categories: management technologies, production technologies, sensing technologies and monitoring technologies. The findings from the FSE indicate that monitoring technologies represent the most significant category, whereas management technologies rank as the least significant. Moreover, the RII analysis highlights that tools management stands out as the most important application of RFID, while dispute resolution emerges as the least significant RFID application.
Practical implications
The study establishes the core areas of RFID application and their benefits to sustainable buildings. Consequently, it helps stakeholders (consultants, clients and contractors) to examine the RFID application areas and make informed decision on sustainable construction. Furthermore, it provides systematic proof that can aid the implementation of RFID in developing countries.
Originality/value
The study provides an insight into the possible application areas and benefits of RFID technology in the construction industry of developing countries. It also developed a conceptual frame for the critical application areas of RFID technology in the construction industry of developing countries.
Details
Keywords
Lekan Damilola Ojo, Deji Rufus Ogunsemi, Ahmed Elyamany and Ayodeji Emmanuel Oke
The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for…
Abstract
Purpose
The adoption of value management (VM) has been on the rise in the construction industry, especially in the past decade. Identifying the main barriers to VM application for ameliorating poor project outcomes in the construction industry is a critical step to overcoming its implementation. Therefore, this study aims to examine the barriers to the adoption of VM in the Nigerian construction industry (NCI) and identify the critical ones for action by construction stakeholders.
Design/methodology/approach
This study used two rounds of Delphi surveys with 15 VM experts to identify the challenges to VM adoption. The Delphi team’s data from the two surveys were analysed using descriptive statistics. The mean-mode approach was used to identify ten major barriers to VM adoption based on the consensus reached during the second round of the Delphi poll. Following that, an interrater agreement analysis and a significant level analysis were performed.
Findings
Of the 17 identified barriers hindering VM adoption on construction projects in the NCI, 10 were found to be profound after statistical analyses of the data. The significant barriers include communication gap between the client and other consultants; delay in design preparation because of VM services; the pretext that VM is being practiced in the construction industry; and the wrong perception of VM by construction professionals, among others. The findings of the analysis suggested that the lack of VM adoption in the NCI was because of inadequate knowledge of VM techniques among construction professionals. Therefore, it is advised that VM training be provided for concerned stakeholders to address the lack of VM expertise among Nigerian construction professionals.
Practical implications
This study investigated the barriers to VM adoption on construction projects in the NCI with the opinions of a few construction professionals who can be regarded as VM experts. As against obtaining large survey responses from construction professionals who may not be knowledgeable in the VM process, the limited VM experts’ responses provide a valid basis for drawing inferences and making recommendations to address the paucity of VM applications in the NCI.
Originality/value
Through a Delphi survey, the critical barriers to the adoption of VM were identified, along with recommendations to help construction stakeholders overcome the challenges and enjoy the benefits of VM.
Details
Keywords
Chau Ngoc Dang, Warit Wipulanusat, Peem Nuaklong and Boonsap Witchayangkoon
In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green…
Abstract
Purpose
In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green innovation practices and develop a measurement model for quantifying the green innovation degrees of construction firms.
Design/methodology/approach
A mixed-methods research approach is adopted. First, an extensive literature review is performed to identify potential green innovation items, which are then used to design a preliminary questionnaire. Next, expert interviews are conducted to pilot-test this questionnaire. Subsequently, by using a convenience non-probability sampling method, 88 valid responses are collected from construction firms in Vietnam. Then, one-sample and independent-samples t tests are employed to assess the importance of green innovation practices. Fuzzy synthetic evaluation (FSE) is also applied to quantitatively compare such practices. Finally, green innovation level (GIL) is proposed to measure the green innovation indexes and validated by a case study of seven construction firms.
Findings
This study identifies 13 green innovation variables, of which several key practices are highlighted for small/medium and large construction firms. The results of FSE analysis indicate that green process innovation is the most vital green category in construction firms, followed by green product and management innovations, respectively. As a quantitative measure, GIL could allow construction firms to frequently evaluate their green innovation indexes, thereby promoting green innovation practices comprehensively. Hence, construction firms would significantly enhance green competitive advantages and increasingly contribute to green and sustainable construction developments.
Originality/value
This research is one of the first attempts to integrate various green innovation practices into a comprehensive formulation. The established indexes offer detailed green innovation evaluations, which could be considered as valuable references for construction practitioners. Furthermore, a reliable and practical tool (i.e. GIL) is proposed to measure the GILs of construction firms in developing countries.
Details
Keywords
Stephen Akunyumu, Frank Fugar and Emmanuel Adinyira
The failure rate of international construction joint venture (ICJV) projects has been noted to be high in developing countries due to the complexity and risky nature of…
Abstract
Purpose
The failure rate of international construction joint venture (ICJV) projects has been noted to be high in developing countries due to the complexity and risky nature of construction projects in the international market. The purpose of this study is to identify and evaluate the risks facing ICJV projects in Ghana.
Design/methodology/approach
A risk register was developed through a comprehensive literature review. The identified risks were then used in a questionnaire survey involving local and foreign partners in ICJV projects in Ghana.
Findings
From a total of 74 risks identified, categorized into country-level risks, market-level risks and project-level risks, the “top ten” risks found to be the most critical risks facing ICJV projects in Ghana include unstable currency exchange rates, inflation, design changes, high-interest rate, budget overrun, cash flow problems of the client, economy fluctuation, difficulty in obtaining approval of projects from host government authorities/bureaucracy, potential financial distress of JV partner and bribery and corruption.
Originality/value
This study provides a comprehensive list of risks ICJV partners are likely to encounter on their projects in developing countries. Furthermore, this study improves on one of the major limitations of previous ICJV studies by collecting data from both partners of the ICJV, appropriate for cross-cultural examination and comparison.
Details
Keywords
Ali Hassan Ali, Ahmed Farouk Kineber, Ahmed Elyamany, Ahmed Hussein Ibrahim and Ahmed Osama Daoud
This study aims to identify the most significant barriers and the stationary barrier to modular construction (MC) implementation and promote MC widespread use. By doing so, the…
Abstract
Purpose
This study aims to identify the most significant barriers and the stationary barrier to modular construction (MC) implementation and promote MC widespread use. By doing so, the construction industry can leverage the benefits of MC, such as faster construction times, improved quality control, reduced waste and increased sustainability.
Design/methodology/approach
This study uses a Gini’s mean analysis approach to identify the stationary barriers hindering the MC adoption in residential projects. The research focuses on the Egyptian context and uses a questionnaire survey to gather data from professionals in the construction industry.
Findings
According to the survey findings, the top five significant MC barriers are inability to modify the design; contractors asking for high bidding prices (higher initial cost); scepticism, conservation and resistance of clients to innovation and change; transportation restrictions; and lack of a one-size-fits-all tool for the design. In addition, Gini’s mean of dispersion demonstrated that the stationary barrier that faces MC adoption is the apprehension that architectural creativity will suffer because of MC.
Practical implications
The identified obstacles could be useful for decision makers in countries that have not yet adopted MC and may aid in the planning process to manage the risks associated with MC projects. The paper stresses the significance of devising techniques to overcome these barriers and proposes several methods to tackle these challenges.
Originality/value
This study fills the knowledge gap by identifying the stationary barrier and emphasising the potential risks associated with MC barriers. Furthermore, it suggests several strategies for overcoming and reducing these barriers in developing countries residential projects.
Details
Keywords
The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost…
Abstract
Purpose
The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost. Accordingly, it is expected that these design documents must be of high quality to engender the attainment of the desired project objectives. The purpose of this study is to analyze the factors that affect the quality of design documentation in construction projects in the context of a developing country.
Design/methodology/approach
This study used a descriptive research design involving professionals from firms offering services in areas of design and documentation, mainly architectural, quantity surveying and engineering. A total of 80 out of 84 questionnaires were received and analyzed using IBM SPSS Statistics Version 25, and a factor analysis approach was used to categorize the factors into smaller five groups.
Findings
The factors were subsequently categorized according to size, time, staff, quality and training-related factors. Collectively, large size of the project, inadequate supervision of junior design staff, low professional fees, procurement process and system, failure to adopt quality management systems and allocation or assigning of staff to more than one project at the same time have high influence (component loading of 700) in respective groups.
Research limitations/implications
The reliance on data to analyze the factors of design documents in construction projects in developing economies context, using a Tanzanian exemplar, is considered a limitation. Developing countries with similar economic characteristics, procurement systems and cultural setup could benefit from the results of this study.
Practical implications
The study of factors affecting quality of design and documents in construction projects serves as a guide for built environment firms in Tanzania in conducting effective business and ensuring quality design documents, hence improved project performance. Understanding the nature of relationship between the design and construction teams as well as the impact of design documents on project performance is of great importance for the design teams of future projects and other decision-makers to pay attention when preparing design and related documents, especially during design stage of construction projects in developing countries.
Originality/value
The study contributes the knowledge by providing useful insights on the subject through a categorization of the factors affecting the quality of design documentation and exploring the nature of relationship between the design and construction teams in construction projects within a previously unexplored Tanzanian context focusing on a traditional procurement system for future improvement of project delivery, hence project success.
Details
Keywords
Francis Nuako, Frank Ato Ghansah and Thomas Adusei
It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…
Abstract
Purpose
It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”
Design/methodology/approach
This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.
Findings
This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.
Practical implications
When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.
Originality/value
The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.