1 – 10 of over 7000Kyudong Kim, Helena R. Tiedmann and Kasey M. Faust
The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related…
Abstract
Purpose
The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related changes, how these changes may apply to different companies, and which changes should continue post-pandemic.
Design/methodology/approach
We aim to identify pandemic-driven changes that have affected the construction workplace and the advantages and challenges associated with them. We then make recommendations for what could and should endure through the pandemic and beyond, and under what circumstances. To achieve this objective, we conducted both qualitative and quantitative analyses of 40 semi-structured interviews with US-based construction professionals.
Findings
Identified through these interviews were 21 pandemic-driven changes across six categories: management and planning, technology, workforce, health and safety, supply chain, and contracts. This study noted both positive and negative impacts of the changes on cost, schedule, productivity, collaboration, employee retention, flexibility, quality, and risk mitigation. Participants indicated that some changes should remain after the pandemic and others (e.g. select safety measures, schedule adjustments) should be temporary.
Originality/value
By incorporating these lessons learned into recommendations, the findings of this study will help businesses identify and implement the most appropriate improvements for their organizations. The findings also provide policymakers with valuable insights on how to promote innovation in the construction industry and potentially enact more effective policies during crises to drive long-term improvements.
Details
Keywords
Iddamalgoda Pathiranage Tharindu Sandaruwan, Jayasinghe Arachchige Bihara Janardana and Kesavan Manoharan
Construction professionals are the major contributors to developing a sustainable construction industry, whereas architects, engineers and quantity surveyors are the key…
Abstract
Purpose
Construction professionals are the major contributors to developing a sustainable construction industry, whereas architects, engineers and quantity surveyors are the key construction professionals who must play extraordinary roles in achieving better sustainable construction. Therefore, this study aims to identify the job attributes of key Sri Lankan construction professionals in addressing challenges associated with climate change.
Design/methodology/approach
The study adopted a mixed research approach. A literature review and preliminary semi-structured interviews were used to appraise the job roles of architects, engineers and quantity surveyors in addressing challenges associated with climate change. The data collected through the qualitative approach were used in an online questionnaire survey, and the findings were analysed using the relative index method.
Findings
The findings highlight that regardless of the knowledge of the professional category on green rating tools, carbon footprint, adaptation of renewable energies for the reduction of energy consumption, building information modelling-related applications and waste management concepts/practices are the foremost job attributes required for the key Sri Lankan construction professionals in addressing challenges associated with climate change.
Research limitations/implications
The results from this study provide a handful of guidance to construction industry professionals, national and international professional institutions, non-governmental organisations and other relevant authorities to address climate change within the built environment by identifying ways for improving the relevant key job attributes of construction industry professionals.
Originality/value
To the best of the authors’ knowledge, this is the first study that explores the job attributes of key Sri Lankan construction professionals in addressing the challenges associated with climate change.
Details
Keywords
Mohd Azrai Azman, Zulkiflee Abdul-Samad, Boon L. Lee, Martin Skitmore, Darmicka Rajendra and Nor Nazihah Chuweni
Total factor productivity (TFP) change is an important driver of long-run economic growth in the construction sector. However, examining TFP alone is insufficient to identify the…
Abstract
Purpose
Total factor productivity (TFP) change is an important driver of long-run economic growth in the construction sector. However, examining TFP alone is insufficient to identify the cause of TFP changes. Therefore, this paper employs the infrequently used Geometric Young Index (GYI) and stochastic frontier analysis (SFA) to measure and decompose the TFP Index (TFPI) at the firm-level from 2009 to 2018 based on Malaysian construction firms' data.
Design/methodology/approach
To improve the TFPI estimation, normally unobserved environmental variables were included in the GYI-TFPI model. These are the physical operation of the firm (inland versus marine operation) and regional locality (West Malaysia versus East Malaysia). Consequently, the complete components of TFPI (i.e. technological, environmental, managerial, and statistical noise) can be accurately decomposed.
Findings
The results reveal that TFP change is affected by technological stagnation and improvements in technical efficiency but a decline in scale-mix efficiency. Moreover, the effect of environmental efficiency on TFP is most profound. In this case, being a marine construction firm and operating in East Malaysia can reduce TFPI by up to 38%. The result, therefore, indicates the need for progressive policies to improve long-term productivity.
Practical implications
Monitoring and evaluating productivity change allows an informed decision to be made by managers/policy makers to improve firms' competitiveness. Incentives and policies to improve innovation, competition, training, removing unnecessary taxes and regulation on outputs (inputs) could enhance the technological, technical and scale-mix of resources. Furthermore, improving public infrastructure, particularly in East Malaysia could improve regionality locality in relation to the environmental index.
Originality/value
This study contributes to knowledge by demonstrating how TFP components can be completely modelled using an aggregator index with good axiomatic properties and SFA. In addition, this paper is the first to apply and include the GYI and environmental variables in modelling construction productivity, which is of crucial importance in formulating appropriate policies.
Details
Keywords
Claims are increasingly becoming a norm in construction projects and thus an area that is attracting interventions through researches. This paper aims to establish causes–effects…
Abstract
Purpose
Claims are increasingly becoming a norm in construction projects and thus an area that is attracting interventions through researches. This paper aims to establish causes–effects relationship of claims in construction projects.
Design/methodology/approach
This is correlation study type of study that attempts to establish causes–effects relationship of claims in construction projects. Significant causes and effects of construction claims were determined using one-sample t-test. To establish the relationship, the significant causes and effects of construction claims were correlated using bivariate correlation analysis.
Findings
Among the significant causes, variations, change of scope of the project and delay in completion of works have high level of significant positive relationship with five to six other causes and positive relationship with multiple effects ranging from five to six. Besides, among significant effects, delay in completion and delivering of construction projects, poor contractual relationship among parties and extension of time have significant positive relationship with multiple causes.
Research limitations/implications
The findings of this study are limited to causes-causes relationship and causes–effects relationship of claims in construction projects. This means effects–effects relationship was not covered that could be an important area to investigate as some of causes and effects are at times termed interchangeably.
Practical implications
With reference to previous studies which have focused on determining the causes and effects of construction claims, the findings of the current study have specific contribution on claims management as it divulges the causes of constructions claims that have multiplier effects to the project as a result of their linkage.
Originality/value
The paper unveils causes of claims with multiplier effects to construction projects for project participants to devise strategies to minimize and consequently eliminate them.
Details
Keywords
Asli Pelin Gurgun, Kerim Koc and Handan Kunkcu
Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of…
Abstract
Purpose
Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of technologies to address delays in construction projects and aims to address three research questions (1) to identify the adopted technologies and proposed solutions in the literature, (2) to explore the reasons why the delays cannot be prevented despite disruptive technologies and (3) to determine the major strategies to prevent delays in construction projects.
Design/methodology/approach
In total, 208 research articles that used innovative technologies, methods, or tools to avoid delays in construction projects were investigated by conducting a comprehensive literature review. An elaborative content analysis was performed to cover the implemented technologies and their transformation, highlighted research fields in relation to selected technologies, focused delay causes and corresponding delay mitigation strategies and emphasized project types with specific delay causes. According to the analysis results, a typological framework with appropriate technological means was proposed.
Findings
The findings revealed that several tools such as planning, imaging, geo-spatial data collection, machine learning and optimization have widely been adopted to address specific delay causes. It was also observed that strategies to address various delay causes throughout the life cycle of construction projects have been overlooked in the literature. The findings of the present research underpin the trends and technological advances to address significant delay causes.
Originality/value
Despite the technological advancements in the digitalization era of Industry 4.0, many construction projects still suffer from poor schedule performance. However, the reason of this is questionable and has not been investigated thoroughly.
Details
Keywords
Mohammad Alhusban, Faris Elghaish, M. Reza Hosseini and Mohammad Mayouf
Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major…
Abstract
Purpose
Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major impact on the success of building information modelling (BIM) implementation in construction projects. Despite the close links between these two concepts, research on the effect of procurement approaches on BIM implementation is scarce. To address this gap, this paper aims to investigate the barriers that affect BIM implementation through the lens of procurement approaches.
Design/methodology/approach
A mixed-method approach was adopted using a questionnaire survey (n = 116) and interviews with key stakeholders (n = 12) in Jordan. The outcomes of the quantitative parts were augmented with findings from interviews.
Findings
It was revealed that the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common design-bid-build (DBB) to more collaborative procurement approaches remains infeasible in view of the realities that govern the construction industry.
Research limitations/implications
It was revealed the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common DBB to more collaborative procurement approaches remains infeasible given the realities that govern the construction industry.
Originality/value
As the first of its kind, a set of recommendations for establishing supportive, workable procurement that does not deviate significantly from common procedures and practices is presented. Rather than advocating a shift to procurement approaches that are aligned with BIM, the findings offer novel insight into the necessity of developing a framework within the boundaries of the current and widely adopted procurement approaches to address the identified construction procurement issues and facilitate BIM implementation.
Details
Keywords
Murat Cevikbas, Ozan Okudan and Zeynep Işık
The purpose of this paper is to propose a disruption claim management (DCM) life cycle and a risk management framework to provide comprehensive guidance to construction…
Abstract
Purpose
The purpose of this paper is to propose a disruption claim management (DCM) life cycle and a risk management framework to provide comprehensive guidance to construction practitioners for facilitating effective and efficient DCM.
Design/methodology/approach
DCM life cycle was initially developed through a focus group discussion (FGD) with the participation of the construction practitioners who have diverse experiences about DCM. The life cycle is comprised of 6 phases and also includes proper reactions of the owners and contractors. Then, 42 risk factors that can impact the deliverables of DCM were identified through a literature review and an additional FGD session. This was then followed by a Fuzzy Analytical Hierarchy Process (FAHP) which was performed to evaluate the importance of each risk factor in terms of the factor's impact on the success of DCM. Additionally, consistency analysis was performed to further maximize the reliability of the results.
Findings
Findings revealed that a proactive and systematic approach should be adopted and DCM practices should be initiated before any disruption event is triggered. Accordingly, the proposed framework recommends DCM practices to be initiated early in the contract development phase since compensation for the disruption might be recovered only to the extent that the contract permits. The contract-related risks were given top priority by the experts so that the results of the fuzzy AHP analysis also verified the significance of the contract development phase. Besides contract-related risks, risks related to insufficient site observation, ignorance of the project team, cognitive bias and conflict of interest were determined as the most significant DCM risks, needing an urgent and sophisticated risk response plan. Lastly, results suggested that “Site observation and record-keeping” is the most formidable phase since the phase's implementation on a continuous basis could create unforeseen organizational challenges such as mismanagement of project records, especially in the dynamic and turbulent environment of the construction projects.
Originality/value
Disruption – which is caused mostly by change – is inevitable in construction projects due to their sophisticated nature. DCM, therefore, becomes crucial to compensate losses of contractors and eliminate or diminish the prolonged dispute resolution process. Existing studies, however, do not provide a comprehensive theoretical basis for the DCM life cycle and DCM life cycle's potential risks so that DCM life cycle's promising benefits can hardly be materialized. Thus, developing a DCM life cycle and associating DCM life cycle with risk management, this study is highly believed to make a promising theoretical contribution to the DCM domain since this is one of the earliest attempts in the literature. Additionally, this research provides construction practitioners with an insight into the effective implementation of DCM practices in construction projects.
Details
Keywords
Mughees Aslam, Edmund Baffoe-Twum and Sohail Malik
Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the…
Abstract
Purpose
Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the construction sector of Pakistan, it has not been extensively explored. This study aims to address this knowledge gap by identifying and predicting current lean practices and assessing the strengths and weaknesses of LC implementation in Pakistan.
Design/methodology/approach
Using robust statistical methods to analyze 92 valid responses, the study reveals that approximately 54% of lean practices are currently in use in the construction industry of Pakistan, with a population mean ranging from 52.7% to 55.6%.
Findings
Surprisingly, the research identifies instances where some construction firms in Pakistan are implementing LC practices, even though they have only a limited understanding of its underlying principles. Notably, certain subprinciples, such as visual management, top management commitment to change, employee training, process cycle time reduction and production optimization, are less integrated within the construction industry. Exploring the possibility of implementing LC, recommendations for strategies to implement LC in Pakistan are suggested, aligning with the conceptual model proposed by the researchers.
Originality/value
The novelty of this work offers insights that can serve as a comprehensive guide for developing nations. It provides a structured approach to assess and benchmark LC practices, which, in turn, can contribute to a more efficient and effective construction industry. Moreover, the strategies proposed in this research can aid developing countries in the efficient implementation of LC. This will have a positive implication for both economic and developmental outcomes.
Details
Keywords
Ayman Ahmed Ezzat Othman and Yomna Abdelghany El-Saeidy
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design…
Abstract
Purpose
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process.
Design/methodology/approach
A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to examine their perception and application of ESI towards reducing CW generated during the design process. Based on the results of the above, the research developed a framework to facilitate ESI during the design process to reduce CW.
Findings
Through literature review, the research highlighted the causes of CW generated during the design process and identified the benefits and challenges that encounter ESI in ADFs. Results of data analysis showed that “last-minute changes due to client requirements” was ranked the highest challenges of ESI in ADFs in Egypt followed by “lack of design experience”. Moreover, “providing technical information about materials and equipment and their capabilities” was ranked by respondents as the highest contributions of suppliers during the design process which leads to waste reduction followed by “better estimation of materials and costs”. Finally, respondents stated that “resistance of ADFs to include suppliers in the design phase” was ranked the highest challenge of ESI in the design process followed by “no clear guidelines or policies that organise ESI”.
Research limitations/implications
Because of the conceptual nature of the proposed framework, it has to be tested and validated to ensure its capability to overcome the challenges of ESI as an approach for reducing CW generated during the design process.
Practical implications
This research presents a practical solution to the problem of CW generated during the design process through ESI.
Originality/value
The research discussed the causes of CW originated from the design process and the benefits and challenges of ESI in ADFs. It investigated the perception and application of ESI in ADFs in Egypt. The proposed framework which was designed to facilitate the integration of suppliers in the early stages of the project life cycle represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.
Details
Keywords
Mohammad Mayouf and Ciaran Gilligan
In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered…
Abstract
Purpose
In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project.
Design/methodology/approach
An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor.
Findings
The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects.
Originality/value
The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.
Details