Search results
1 – 10 of over 3000Kyudong Kim, Helena R. Tiedmann and Kasey M. Faust
The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related…
Abstract
Purpose
The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related changes, how these changes may apply to different companies, and which changes should continue post-pandemic.
Design/methodology/approach
We aim to identify pandemic-driven changes that have affected the construction workplace and the advantages and challenges associated with them. We then make recommendations for what could and should endure through the pandemic and beyond, and under what circumstances. To achieve this objective, we conducted both qualitative and quantitative analyses of 40 semi-structured interviews with US-based construction professionals.
Findings
Identified through these interviews were 21 pandemic-driven changes across six categories: management and planning, technology, workforce, health and safety, supply chain, and contracts. This study noted both positive and negative impacts of the changes on cost, schedule, productivity, collaboration, employee retention, flexibility, quality, and risk mitigation. Participants indicated that some changes should remain after the pandemic and others (e.g. select safety measures, schedule adjustments) should be temporary.
Originality/value
By incorporating these lessons learned into recommendations, the findings of this study will help businesses identify and implement the most appropriate improvements for their organizations. The findings also provide policymakers with valuable insights on how to promote innovation in the construction industry and potentially enact more effective policies during crises to drive long-term improvements.
Details
Keywords
Mohd Azrai Azman, Zulkiflee Abdul-Samad, Boon L. Lee, Martin Skitmore, Darmicka Rajendra and Nor Nazihah Chuweni
Total factor productivity (TFP) change is an important driver of long-run economic growth in the construction sector. However, examining TFP alone is insufficient to identify the…
Abstract
Purpose
Total factor productivity (TFP) change is an important driver of long-run economic growth in the construction sector. However, examining TFP alone is insufficient to identify the cause of TFP changes. Therefore, this paper employs the infrequently used Geometric Young Index (GYI) and stochastic frontier analysis (SFA) to measure and decompose the TFP Index (TFPI) at the firm-level from 2009 to 2018 based on Malaysian construction firms' data.
Design/methodology/approach
To improve the TFPI estimation, normally unobserved environmental variables were included in the GYI-TFPI model. These are the physical operation of the firm (inland versus marine operation) and regional locality (West Malaysia versus East Malaysia). Consequently, the complete components of TFPI (i.e. technological, environmental, managerial, and statistical noise) can be accurately decomposed.
Findings
The results reveal that TFP change is affected by technological stagnation and improvements in technical efficiency but a decline in scale-mix efficiency. Moreover, the effect of environmental efficiency on TFP is most profound. In this case, being a marine construction firm and operating in East Malaysia can reduce TFPI by up to 38%. The result, therefore, indicates the need for progressive policies to improve long-term productivity.
Practical implications
Monitoring and evaluating productivity change allows an informed decision to be made by managers/policy makers to improve firms' competitiveness. Incentives and policies to improve innovation, competition, training, removing unnecessary taxes and regulation on outputs (inputs) could enhance the technological, technical and scale-mix of resources. Furthermore, improving public infrastructure, particularly in East Malaysia could improve regionality locality in relation to the environmental index.
Originality/value
This study contributes to knowledge by demonstrating how TFP components can be completely modelled using an aggregator index with good axiomatic properties and SFA. In addition, this paper is the first to apply and include the GYI and environmental variables in modelling construction productivity, which is of crucial importance in formulating appropriate policies.
Details
Keywords
Asli Pelin Gurgun, Kerim Koc and Handan Kunkcu
Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of…
Abstract
Purpose
Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of technologies to address delays in construction projects and aims to address three research questions (1) to identify the adopted technologies and proposed solutions in the literature, (2) to explore the reasons why the delays cannot be prevented despite disruptive technologies and (3) to determine the major strategies to prevent delays in construction projects.
Design/methodology/approach
In total, 208 research articles that used innovative technologies, methods, or tools to avoid delays in construction projects were investigated by conducting a comprehensive literature review. An elaborative content analysis was performed to cover the implemented technologies and their transformation, highlighted research fields in relation to selected technologies, focused delay causes and corresponding delay mitigation strategies and emphasized project types with specific delay causes. According to the analysis results, a typological framework with appropriate technological means was proposed.
Findings
The findings revealed that several tools such as planning, imaging, geo-spatial data collection, machine learning and optimization have widely been adopted to address specific delay causes. It was also observed that strategies to address various delay causes throughout the life cycle of construction projects have been overlooked in the literature. The findings of the present research underpin the trends and technological advances to address significant delay causes.
Originality/value
Despite the technological advancements in the digitalization era of Industry 4.0, many construction projects still suffer from poor schedule performance. However, the reason of this is questionable and has not been investigated thoroughly.
Details
Keywords
Mohammad Alhusban, Faris Elghaish, M. Reza Hosseini and Mohammad Mayouf
Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major…
Abstract
Purpose
Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major impact on the success of building information modelling (BIM) implementation in construction projects. Despite the close links between these two concepts, research on the effect of procurement approaches on BIM implementation is scarce. To address this gap, this paper aims to investigate the barriers that affect BIM implementation through the lens of procurement approaches.
Design/methodology/approach
A mixed-method approach was adopted using a questionnaire survey (n = 116) and interviews with key stakeholders (n = 12) in Jordan. The outcomes of the quantitative parts were augmented with findings from interviews.
Findings
It was revealed that the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common design-bid-build (DBB) to more collaborative procurement approaches remains infeasible in view of the realities that govern the construction industry.
Research limitations/implications
It was revealed the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common DBB to more collaborative procurement approaches remains infeasible given the realities that govern the construction industry.
Originality/value
As the first of its kind, a set of recommendations for establishing supportive, workable procurement that does not deviate significantly from common procedures and practices is presented. Rather than advocating a shift to procurement approaches that are aligned with BIM, the findings offer novel insight into the necessity of developing a framework within the boundaries of the current and widely adopted procurement approaches to address the identified construction procurement issues and facilitate BIM implementation.
Details
Keywords
Mughees Aslam, Edmund Baffoe-Twum and Sohail Malik
Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the…
Abstract
Purpose
Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the construction sector of Pakistan, it has not been extensively explored. This study aims to address this knowledge gap by identifying and predicting current lean practices and assessing the strengths and weaknesses of LC implementation in Pakistan.
Design/methodology/approach
Using robust statistical methods to analyze 92 valid responses, the study reveals that approximately 54% of lean practices are currently in use in the construction industry of Pakistan, with a population mean ranging from 52.7% to 55.6%.
Findings
Surprisingly, the research identifies instances where some construction firms in Pakistan are implementing LC practices, even though they have only a limited understanding of its underlying principles. Notably, certain subprinciples, such as visual management, top management commitment to change, employee training, process cycle time reduction and production optimization, are less integrated within the construction industry. Exploring the possibility of implementing LC, recommendations for strategies to implement LC in Pakistan are suggested, aligning with the conceptual model proposed by the researchers.
Originality/value
The novelty of this work offers insights that can serve as a comprehensive guide for developing nations. It provides a structured approach to assess and benchmark LC practices, which, in turn, can contribute to a more efficient and effective construction industry. Moreover, the strategies proposed in this research can aid developing countries in the efficient implementation of LC. This will have a positive implication for both economic and developmental outcomes.
Details
Keywords
Ayman Ahmed Ezzat Othman and Yomna Abdelghany El-Saeidy
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design…
Abstract
Purpose
The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process.
Design/methodology/approach
A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to examine their perception and application of ESI towards reducing CW generated during the design process. Based on the results of the above, the research developed a framework to facilitate ESI during the design process to reduce CW.
Findings
Through literature review, the research highlighted the causes of CW generated during the design process and identified the benefits and challenges that encounter ESI in ADFs. Results of data analysis showed that “last-minute changes due to client requirements” was ranked the highest challenges of ESI in ADFs in Egypt followed by “lack of design experience”. Moreover, “providing technical information about materials and equipment and their capabilities” was ranked by respondents as the highest contributions of suppliers during the design process which leads to waste reduction followed by “better estimation of materials and costs”. Finally, respondents stated that “resistance of ADFs to include suppliers in the design phase” was ranked the highest challenge of ESI in the design process followed by “no clear guidelines or policies that organise ESI”.
Research limitations/implications
Because of the conceptual nature of the proposed framework, it has to be tested and validated to ensure its capability to overcome the challenges of ESI as an approach for reducing CW generated during the design process.
Practical implications
This research presents a practical solution to the problem of CW generated during the design process through ESI.
Originality/value
The research discussed the causes of CW originated from the design process and the benefits and challenges of ESI in ADFs. It investigated the perception and application of ESI in ADFs in Egypt. The proposed framework which was designed to facilitate the integration of suppliers in the early stages of the project life cycle represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.
Details
Keywords
Mohammad Mayouf and Ciaran Gilligan
In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered…
Abstract
Purpose
In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project.
Design/methodology/approach
An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor.
Findings
The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects.
Originality/value
The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.
Details
Keywords
Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva
Sources highlight that lack of systematic labour training components results in low performance and productivity of labour, which leads the construction industry of many countries…
Abstract
Purpose
Sources highlight that lack of systematic labour training components results in low performance and productivity of labour, which leads the construction industry of many countries to face various challenges. This study aims to quantify the variations in the performance and productivity levels of labour in building construction projects through the applications of effective work-based training components.
Design/methodology/approach
A comprehensive literature review and a series of experts’ discussions with action-oriented communication approaches were conducted to develop a set of practices related to labour training, performance assessment and productivity measurements within a framework. The developed practices were applied to around 100 labourers working on nine building construction projects through a construction supervisory training programme.
Findings
The study presents the detailed patterns of the significant changes in labour performance and productivity levels. The majority of trained labourers have grown to perform the work process with some relevant theoretical and operational knowledge and skills. The overall results spotlight the significant behavioural changes that can be observed in workforce operations by improving labour performance, which resulted in implementing effective labour-rewarding practices within a framework.
Research limitations/implications
Although the study findings were limited to the Sri Lankan context, the proposed practices can be applied to the industry practices of the construction sector of other developing countries and the other developing industries in similar ways/scenarios.
Practical implications
The study outcomes contribute to uplifting the work qualities of labourers with life-long learning opportunities and unlocking the potential barriers for expanding the local labour supply while controlling the excessive inclination of the local firms towards foreign labour. This paper describes further implications and future scopes of the study elaborately.
Originality/value
The study provides generalised mechanisms and practices that transform the labour characteristics and add new attributes for strengthening the values of construction supervision practices to obtain well-improved work outputs. The study outcomes reinforce the chain relationships among the training elements, labour performance and productivity levels, leading to upgrading current planning and operational management practices, especially adding constructive mechanisms in resource levelling and productivity benchmarking practices.
Details
Keywords
Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan
In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…
Abstract
Purpose
In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.
Design/methodology/approach
A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.
Findings
The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.
Research limitations/implications
The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.
Practical implications
This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.
Originality/value
The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.
Details
Keywords
By providing an overview of the existing knowledge on public governance in the context of Construction 4.0, this review serves as a valuable resource for researchers, policymakers…
Abstract
Purpose
By providing an overview of the existing knowledge on public governance in the context of Construction 4.0, this review serves as a valuable resource for researchers, policymakers and practitioners interested in understanding the current state of public governance in the context of Construction 4.0 and identifying avenues for future research and practical implementation.
Design/methodology/approach
This article presents a systematic and comprehensive review of the academic literature on public governance in the context of Construction 4.0. To ensure a systematic and rigorous selection of source material, the study adopts the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines.
Findings
By examining a wide range of scholarly works, the review identifies and discusses eight recurring themes that are crucial for understanding the role of public governance in Construction 4.0. These themes include policy and regulation, infrastructure and investment, skill development and education, digital inclusion and access, collaboration and partnerships, data governance and privacy, interactions with environmental and societal goals and the impact of Construction 4.0 on public governance itself. The review highlights a significant disparity between the normative debates on the importance of public governance in Construction 4.0 and the empirical knowledge available regarding its practical implementation. While the literature emphasizes the need for effective governance mechanisms to address the challenges and opportunities presented by Construction 4.0, there is a notable lack of empirical research examining the actual implementation and outcomes of public governance strategies.
Originality/value
This is the first systematic review of academic literature on public governance in the context of Construction 4.0.
Details