Search results

1 – 10 of over 17000

Abstract

Details

Collaborative Risk Mitigation Through Construction Planning and Scheduling
Type: Book
ISBN: 978-1-78743-148-5

Abstract

Details

Nonlinear Time Series Analysis of Business Cycles
Type: Book
ISBN: 978-0-44451-838-5

Book part
Publication date: 1 March 2022

George Dimech, Rebecca Dalli Gonzi and Alan Wild

Purpose: Construction in Malta is generally characterised by small projects operated through fragmented contractual ties and limited technological advances. Through this study

Abstract

Purpose: Construction in Malta is generally characterised by small projects operated through fragmented contractual ties and limited technological advances. Through this study, the authors aim to examine the impact of changing client requirements on local construction, analyse the impact of these shifts on project expectations and explore how client requirements can be integrated into the ongoing design phases during the life cycle of the structure. Using a multi-million-euro, multi-phase residential, commercial, and redevelopment construction project as a case study, this paper presents an in-depth analysis of the short-term disruptions and long-term impacts while considering the implications for trade-offs.

Methodology: A mixed-methods approach was used to conduct the analysis. Qualitative data collected from semi-structured interviews showed that projects have different impacts on relationships even when the same organisations work on different trades within the same project. The quantitative data collected was used to analyse the variations caused by trade-offs from the original contracted work packages. The case study setting represents an example of a phenomenological methodology. It adapts existing theories to interpret what happens by examining an example of a phenomenon of interest. Although the conclusions cannot be generalised to the whole construction industry, its merit is that it addresses relationships and processes and is therefore ‘holistic’ rather than limited to isolated factors.

Findings: The findings, illustrate the effects or factors supported by the empirical data towards the main framework that supports the research study model for mapping trade-offs. The model is presented as a three-dimensional framework illustrating the dynamics of objectives, considerations, and time across project life cycles, and goes beyond the control parameters of the project management, cost, quality, and time triangle.

Conclusion: A set of recommendations are presented in relation to the drawing up of project briefs, procurement strategies, and the limitations and implications of embedding client changes.

Details

Managing Risk and Decision Making in Times of Economic Distress, Part A
Type: Book
ISBN: 978-1-80117-427-5

Keywords

Open Access
Book part
Publication date: 1 May 2019

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

For a number of years, the construction industry has seen an ongoing shift from design-bid-build to design-build contracts. This transition in contract type entails changes for…

Abstract

Purpose

For a number of years, the construction industry has seen an ongoing shift from design-bid-build to design-build contracts. This transition in contract type entails changes for both the organizations and the individuals involved. Consequently, the purpose of this paper is to investigate how the client manages the transition between the different contract types from an organizational change perspective in a project-led organization.

Design/Methodology/Approach

A multiple case study of six infrastructure projects with DB contracts, all managed by the Swedish Transport Administration, was conducted. The major source of data is semi-structured interviews with respondents from both the client and the contractors.

Findings

Results suggest that the transition has resulted in a mix of design-bid-build and design-build as contract type owing to issues when changing in a project-led organization. A change in vision also requires a concomitant change in culture, systems and roles.

Research Limitations/Implications

The study only includes cases from the Swedish transport infrastructure sector, which limits the generalizability. The findings are also indicative owing to the small number of cases.

Practical Implications

The findings further our understanding of managing change in complex projects, which might help practitioners to manage change in a more integrated way.

Originality/Value

The findings enrich our understanding of the systemic change that a switch in contract types can have in inter-organizational complex projects such as transport infrastructure projects. Furthermore, it emphasizes the intricate task of change management in project-led organizations and its effects on roles and responsibilities.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Book part
Publication date: 17 November 2010

Dian Marie Hosking

The S–O discourse includes themes that have been variously summarized as “objectivism” (Hermans, Kempen & van Loon, 1992) and “the received view of science” (or “RVS,” see…

Abstract

The S–O discourse includes themes that have been variously summarized as “objectivism” (Hermans, Kempen & van Loon, 1992) and “the received view of science” (or “RVS,” see Woolgar, 1996). Others, speaking of competing “paradigms” in qualitative research, have referred to some of these themes as “positivist” (Guba & Lincoln, 1994) — a confusing simplification for those familiar with the philosophy of inquiry. Relevant examples include narratives that, for example, distinguish between individuals and groups and more “macro” units such as organizations and society in ways that are overly suggestive of concrete, separately existing “things” with their own defining characteristics (Hosking & Morley, 1991).

Details

Relational Practices, Participative Organizing
Type: Book
ISBN: 978-0-85724-007-1

Book part
Publication date: 9 July 2010

Thomas D. Beamish and Nicole Woolsey Biggart

Both neoclassical and Keynesian economists have widely favored the use of equilibrium models to understand economic activity, but dramatic periods of change such as the current…

Abstract

Both neoclassical and Keynesian economists have widely favored the use of equilibrium models to understand economic activity, but dramatic periods of change such as the current global economic downturn are poorly understood by assuming equilibrium. The economist Joseph Schumpeter tried to inject dynamism and disequilibrium into economic models by arguing for the role of entrepreneurs in creating microeconomic change, and for examining long-term macroeconomic change as represented in business cycles. No economist, including Schumpeter, has ever connected these two approaches to change and these approaches are not typically used as alternative and complementary ways of viewing transformation over time. We suggest that these theories can be connected in a “mesoeconomic” institutional analysis rooted in economic sociology; we demonstrate this connection by examining the US commercial building industry. This industry has changed in qualitatively distinct ways over the past two centuries in what we call market orders, economic orders sometimes lasting for decades or more. In each market order, entrepreneurs of different sorts are able to flourish and push forward institutional changes that result in long-term economic shifts. Credit and finance have been pivotal influences in each market order, a factor supporting Schumpeter's focus on entrepreneurial action and speculation and one not largely discussed today. We view the recent disruption of financial markets as a signal of the destruction of a reigning market order.

Details

Markets on Trial: The Economic Sociology of the U.S. Financial Crisis: Part B
Type: Book
ISBN: 978-0-85724-208-2

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports that…

Abstract

The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports that support the practice of the CSC were examined in both countries. It was discovered from the review of literature that the UK has a more detailed report targeted at improving the CSC than Australia. However, both countries have a common factor affecting their CSC which originates from fragmentation experienced within their supply chain. Construction stakeholders in the UK and Australia believe that collaboration and integration are vital components for improving performance. The majority of the contractors in both countries embrace collaborative working for the sole purpose of risk sharing, access to innovation and response to market efficiency. However, most of the models developed for managing the CSC in the UK are built around building information modelling (BIM). Also, the reviewed studies show that supply chain management practice will be effective following the following principle: shared objectives, trust, reduction in a blame culture, joint working, enhanced communication and information-sharing. Finally, the UK has a more established framework and more CSC models compared to Australia.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Book part
Publication date: 5 October 2018

Mohammad Raoufi, Nima Gerami Seresht, Nasir Bedewi Siraj and Aminah Robinson Fayek

Several different simulation techniques, such as discrete event simulation (DES), system dynamics (SD) and agent-based modelling (ABM), have been used to model complex…

Abstract

Several different simulation techniques, such as discrete event simulation (DES), system dynamics (SD) and agent-based modelling (ABM), have been used to model complex construction systems such as construction processes and project management practices; however, these techniques do not take into account the subjective uncertainties that exist in many construction systems. Integrating fuzzy logic with simulation techniques enhances the capabilities of those simulation techniques, and the resultant fuzzy simulation models are then capable of handling subjective uncertainties in complex construction systems. The objectives of this chapter are to show how to integrate fuzzy logic and simulation techniques in construction modelling and to provide methodologies for the development of fuzzy simulation models in construction. In this chapter, an overview of simulation techniques that are used in construction is presented. Next, the advancements that have been made by integrating fuzzy logic and simulation techniques are introduced. Methodologies for developing fuzzy simulation models are then proposed. Finally, the process of selecting a suitable simulation technique for each particular aspect of construction modelling is discussed.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Open Access
Book part
Publication date: 1 May 2019

Ole Jonny Klakegg, Lars Kristian Hunn and Per Fridtjof Larssen

Identify what kind of research we need to reach extraordinary performance in value chains in construction projects.

Abstract

Purpose

Identify what kind of research we need to reach extraordinary performance in value chains in construction projects.

Design/Methodology/Approach

Theory and qualitative case study (document study and interviews in the Bispevika project).

Findings

To change the collaborative game and transform the construction industry, there is a need for research on projects with extraordinary ambitions. The research needs to bridge from strategic level down into specific details in operations. We need contributions that do not follow the general tendency to limit perspectives and focus small, isolated questions. Research must be designed in a multidisciplinary fashion that includes aspects on all levels from individuals to across organisations in the project and even the industry itself. Research also needs to define a new “business model”. If not, research can become irrelevant rather than being a relevant partner producing knowledge and insights in the transformation of the construction industry.

Research Limitations/Implications

For researchers, this result indicates that there is a need for more complex, interdisciplinary research to be able to cover both the strategic and fundamental levels.

Practical Implications

The Bispevika project shows that both strategic direction and fundamental issues need attention and practical action.

Originality/Value

The research raises important aspects of a research agenda for the industry. This paper argues how research can contribute with relevant insights and will help define a more ambitious research agenda where the construction industries’ challenges can become the catalyst for also transforming future research design.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Abstract

Details

Construction Industry Advance and Change: Progress in Eight Asian Economies Since 1995
Type: Book
ISBN: 978-1-80043-504-9

1 – 10 of over 17000