Search results

1 – 10 of 165
Article
Publication date: 13 November 2023

Khaled Hesham Hyari and Mujahed Thneibat

Skewed pricing is a typical tactic used by tenderers in unit price projects to gain additional advantages at the expense of the owner or other competing tenderers. This paper aims…

Abstract

Purpose

Skewed pricing is a typical tactic used by tenderers in unit price projects to gain additional advantages at the expense of the owner or other competing tenderers. This paper aims to describe the development of a model for detecting skewed pricing in competitive tendering for unit price contracts.

Design/methodology/approach

The model evaluates how much the offered unit rates for work items deviate from the reasonable rate identified from the item’s submitted unit rates. Item rate deviations are integrated into a total deviation score for each submitted tender based on the relative weight of the work item to the total project amount. The model allows for assigning higher weights to work items that are more prone to skewed pricing, such as those that are performed early and those that are expected to experience quantity fluctuations.

Findings

The paper presents a detection model that uses only the submitted prices of the competing tenderers to perform the needed calculations, which reduces subjectivity in identifying skewed tenders. Two examples are given to demonstrate how the model may be used to detect skewed tenders.

Originality/value

The model supports tendering officials in the challenging task of identifying skewed tenders, which is required by rules and regulations governing public procurement. The model’s ease of use is expected to make it more widely used as a decision-support tool during the tender evaluation stage of real-world projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 29 November 2018

Karem Sayed Aboelazm

Country comparative studies especially in Africa on public procurement reforms toward financial control and accountability of public expenditure are limited. Meanwhile, these…

Abstract

Purpose

Country comparative studies especially in Africa on public procurement reforms toward financial control and accountability of public expenditure are limited. Meanwhile, these kinds of studies have potential for providing useful insights on how value for money through public procurement is being ensured across Africa. This paper attempts to provide this. The purpose of this paper is to highlight several policy recommendations for public management aimed at improving public procurement and public financial management (PFM) systems in Africa.

Design/methodology/approach

The paper adopts a qualitative case study using secondary data drawn from Global Integrity Index (GII) of the Transparency International and the World Bank’s Country Policy and Institutional Assessments databases to investigate variables that influence public procurement practices in three purposively selected African countries. The comparative approach for presenting some of the experiences of countries in public procurement methods is used in this paper.

Findings

The findings suggest three main variables, namely, government structure and economic variables, complicated by socio-cultural values interact to influence public procurement and PFM systems in the case study countries.

Research limitations/implications

Data for the GII indicators used were only available from 2013, which restricted the discussion of those indicators to a short span (2013–2015).

Social implications

The socio-cultural milieu within which public procurement takes place has implications for how governance structures function to deliver value-for-money public procurement.

Originality/value

This study adds value by comparing three countries within Africa to reveal common variables which influence public procurement and PFM systems.

Details

Journal of Advances in Management Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-7981

Keywords

Article
Publication date: 31 January 2024

Sigrid Betzelt, Ingo Bode and Sarina Parschick

Regarding how the public regulation of human services is perceived within welfare organizations and how the latter cope with it, the role of emotions (as mediators between…

Abstract

Purpose

Regarding how the public regulation of human services is perceived within welfare organizations and how the latter cope with it, the role of emotions (as mediators between structure and agency) proves highly relevant while often being hidden beneath the surface. This article shows how a specific approach to such regulation – here: managerialism – may impact on “emotional regimes” at the organizational and individual level, affecting the attainment of organizational goals and workers' health.

Design/methodology/approach

The article primarily draws on multiple qualitative case studies across two welfare sectors (four organizations) in Germany (continuing education/active inclusion; long-term care). The study research was conducted between 2020 and 2022 and based on 36 interviews with caseworkers and managers, focus group interviews and expert dialogues at industry level.

Findings

The results suggest that the managerialist regulation of welfare services breeds complex and ambiguous emotional regimes. Business-like management techniques elicit various emotions, affecting the motivational basis of human service work. While the experience of hard challenges may raise positive feelings, coping patterns often put strain on organizations and staff alike. In the short run, related emotional regimes tend to make service delivery proceed smoothly, yet in the long run they may have corrosive effects and problematic repercussions on macro-level developments.

Originality/value

The study highlights the role of emotions in publicly regulated human service settings by intermingling macro- and micro-level processes and thereby broadens the perspective of welfare state research as it reveals the impact of (managerialist) regulation on the dynamic organizational chemistry of such settings.

Details

International Journal of Sociology and Social Policy, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-333X

Keywords

Open Access
Article
Publication date: 7 December 2023

Neil Govender, Samuel Laryea and Ron Watermeyer

Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations…

Abstract

Purpose

Competitive tendering in South Africa is often associated with procurement based on the lowest fee tendered. Previous research on this topic did not provide in-depth examinations of how pricing within consulting engineering companies was affected by competitive tendering nor did it illuminate the extent to which professional services were impacted by competitive tendering. This paper aims to examine the implications of competitive tendering on pricing and delivery of consulting engineering services in South Africa.

Design/methodology/approach

A survey research strategy with a questionnaire as the research instrument elicited qualitative data from 28 experienced consulting engineers in South Africa. Thematic analysis was used to analyse qualitative data from the questionnaires.

Findings

Three key themes were identified, namely: considerations when determining consulting engineering fees on competitively tendered projects; the impact of reduced fees due to competitive tendering on the delivery of consulting engineering services; and interventions to prevent unsustainably “low” professional fees. Many consulting engineers in South Africa still determine fees using fee scales, while other considerations include resources, project complexity, risk, etc. Most participants asserted that design optimisation/value engineering, training, meetings and construction monitoring were adversely impacted by “low” fees.

Originality/value

This paper provides in-depth qualitative feedback from experienced consulting engineers (most having more than 20 years’ experience) on a topical issue in the South African construction industry. Thematic analysis was a novel method of analysis that was not used previously in this area of study.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 15 December 2022

Cong Wang, Henry Liu, Michael C.P. Sing and Jin Wu

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction…

Abstract

Purpose

Pre-construction of a project comprises stages that are pivotal for the procurement performance. It is defined as the duration from the project's initiation to construction. However, Private Public Partnerships (PPPs) have been subjected to a long pre-construction, thereby leading to an inefficient development process. Therefore, the purpose of this paper is to pay attention to the influencing factors elongating the pre-construction duration.

Design/methodology/approach

Based on data of 5,677 PPP projects between 2009 and 2021 in China, the authors adopt the Accelerated Failure Time (AFT) model in duration analysis to empirically analyze the following underlying dynamics determining the duration of PPP pre-construction stages: (1) policy uncertainty; (2) corruption; and (3) procurement method selection. To observe the influencing paths more specifically, the authors divided the pre-construction duration into the pre-tendering period and tendering period and regressed them separately.

Findings

The results indicate that the pre-construction duration is significantly prolonged with increased policy uncertainty and corruption degree as well as the use of tendering methods. Meanwhile, the above factors have a greater impact on the pre-tendering period than the tendering period.

Originality/value

The contribution of this study is twofold: (1) theoretically, this paper provides new evidence on the impact of PPP policy uncertainty, corruption and procurement method selection on the pre-construction duration. It complements empirical studies on the factors elongating the time efficiency of PPPs projects. (2) In practice, it provides a specific path for the government to improve the time efficiency of PPPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2024

Henrik Gislason, Jørgen Hvid, Steffen Gøth, Per Rønne-Nielsen and Christian Hallum

An increasing number of Danish municipalities wish to minimize tax avoidance due to profit shifting in their public procurement. To facilitate this effort, this study aims to…

Abstract

Purpose

An increasing number of Danish municipalities wish to minimize tax avoidance due to profit shifting in their public procurement. To facilitate this effort, this study aims to develop a firm-level indicator to assess the potential risk of profit shifting (PS-risk) from Danish subsidiaries of multinational corporations to subsidiaries in low-tax jurisdictions.

Design/methodology/approach

Drawing from previous research, PS-risk is assumed to depend on the maximum difference in the effective corporate tax rate between the Danish subsidiary and other subsidiaries under the global ultimate owner, in conjunction with the tax regulations relevant to profit shifting. The top 400 contractors in Danish municipalities from 2017 to 2019 are identified and their relative PS-risk is estimated by combining information about corporate ownership structure with country-specific information on corporate tax rates, tax regulations and profit shifting from three independent data sets.

Findings

The PS-risk estimates are highly significantly positively correlated across the data sets and show that 17%–23% of the total procurement sum of the Danish municipalities has been spent on contracts with corporations having a medium to high PS-risk. On average, PS-risk is highest for large non-Scandinavian multinational contractors in sectors such as construction, health and information processing.

Social implications

Danish public procurers may use the indicator to screen potential suppliers and, if procurement regulations permit, to ensure high-PS-risk bidders document their tax practices.

Originality/value

The PS-risk indicator is novel, and to the best of the authors’ knowledge, the analysis provides the first estimate of PS-risk in Danish public procurement.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 28 June 2023

Ahmed M. Ibrahim, Mohammad A. Hassanain and Mohamed H. Salaheldin

This research compares consultants' and contractors' professional practices and perspectives on the use of specifications in the engineering of built environment projects.

Abstract

Purpose

This research compares consultants' and contractors' professional practices and perspectives on the use of specifications in the engineering of built environment projects.

Design/methodology/approach

The study initiates with a review of literature, toward realizing (1) the need for inclusion of specifications, throughout the projects' stages (design, tender, construction and handing over), as well as the (2) causes and effects of defective specifications in design and execution of engineered projects. Additionally (3) the study investigates the challenges and causes of specification variations to projects' design and execution. The systematic methodology adopted in this research utilizes frequency indicators, to rank and correlate the perspectives of 60 professionals, who are experienced in consulting and contracting of mega public and private projects.

Findings

The research considers the uncertainties and differences that could be present in engineering developments and use of design specifications for projects' execution and handing over. The two groups of experts' (consultants and contractors) perspectives are usually observed as conflicting, in practice. Practices comparison of their experiences with engineering projects' specifications usability provides unique empirical findings. The analysis and assessment of the experts' knowledge, this research addresses gaps identified in the literature, providing valuable insights.

Originality/value

The study provides in-depth recommendations and discusses possible trends and methods for enhancing specifications' usability in design engineering and execution of built environment projects. The analysis and recommendations present and assess experts' knowledge while bridge gaps identified from the literature.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 2 June 2023

Souad Nassir, Imane Lebdaoui, Youssef Chetioui and Hind Lebdaoui

Despite the digitalization reforms attempting to enhance public service quality, paper-based tendering is still widely used in a number of developing countries (i.e. Morocco)…

Abstract

Purpose

Despite the digitalization reforms attempting to enhance public service quality, paper-based tendering is still widely used in a number of developing countries (i.e. Morocco). This has led to many issues including waste of time, higher costs as well as labor-intensive issues. E-tendering has been widely recommended as a key resolution. Still, both scholars and practitioners raised concerns related the readiness of small and medium enterprises (SMEs) to this digitalization process. The current research aims to investigate the key drivers of SMEs intention to adopt electronic tendering in the context of an emerging African market (i.e. Morocco). Specifically, the authors focus on SMEs contributing to the public procurement process and registered in the online portal recently created by the Moroccan government.

Design/methodology/approach

To achieve this goal, the authors proposed a conceptual model combining the unified theory of acceptance and use of technology (UTAUT) and technology acceptance model (TAM). Based on data collected from suppliers participating in Moroccan public tenders, the authors empirically tested the conceptual model using a partial least squares (PLS) estimation.

Findings

Facilitating conditions and social influence had a positive impact on SMEs intention to adopt electronic tendering. The study’s findings also convey a negative impact of effort expectancy on SMEs intent to adopt e-tendering. Unexpectedly, perceived performance had no significant impact on the intention to adopt electronic bidding among Moroccan SMEs.

Originality/value

This research filled the gap in the literature with regards to SMEs e-Tendering readiness in emerging markets. With the recent digitalization reforms of public tendering in many developing economies (i.e. Morocco), the study findings can be used to improve not only government implementation of electronic bidding but also SMEs' user experience.

Details

Journal of Economic and Administrative Sciences, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1026-4116

Keywords

Article
Publication date: 28 March 2022

Muhammad Ayat, Azmat Ullah and Changwook Kang

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects…

Abstract

Purpose

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects in developing countries.

Design/methodology/approach

The main data set for this study was collected from the World Bank database consisting of 8,951 PPI projects that occurred in developing countries from 1996 to 2020. Hierarchical logistic regression was applied for investigating the effects of USPs on project success. Three moderators, namely, control of corruption, presence of local sponsor and project size were also included in the model to test the impact of their interactions with the USP on the performance of PPI projects. Further, to assess the impact of the effect of USPs, the average marginal effect was calculated. The framework used in this study consists of 18 control variables, three moderators and one noncontrolled independent variable (the USP).

Findings

The results of hierarchical logistic regression indicate that USPs have a significant and negative effect on the success of PPI projects occurring in developing countries. The negative effect of a USP weakens with the presence of local sponsors and stronger control of corruption in the host country. However, contrary to the authors’ expectations, the results show that project size does not significantly affect the association between USPs and the success of PPI projects. Moreover, the results of average marginal effects show that the negative impact of USP on the success of PPI projects ranges between 2.4% and 3.8%.

Originality/value

This study quantifies the negative impact of USP on the success of PPI projects in developing countries, which will be helpful for the practitioners to understand the associated risk with USP projects. Furthermore, it also identifies the moderating roles of control of corruption and the presence of local sponsors on the relationship between USP and the success of PPI projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 28 February 2024

Daniel Dramani Kipo-Sunyehzi, Abdul-Fatawu Abubakari and John-Paul Safunu Banchani

This study aims to focus on public policy concerning the implementation of public procurement policies in Nigeria and Ghana toward achieving value for money in the procurement of…

Abstract

Purpose

This study aims to focus on public policy concerning the implementation of public procurement policies in Nigeria and Ghana toward achieving value for money in the procurement of goods, services and works. It specifically analyzes some major administrative challenges Nigeria and Ghana are faced with in the administration/implementation of public procurement policies toward achieving value for money. It looks at the relationship between the state (regulatory authorities) and substate (procurement entities) in the public sectors of Nigeria and Ghana.

Design/methodology/approach

A comparative case study approach is adopted, where the two countries are compared in terms of achieving value for money. Data was collected from multiple sources, including in-depth interviews. The use of official documents and direct observations at the procurement regulatory authorities and entities’ premises.

Findings

This study found Nigeria often used the four Es – economy, efficiency, effectiveness and equity while Ghana mainly used the traditional five rights (right quantity, right quality, right price, right place and right time) as their criteria for ensuring value for money. The major administrative challenges found include corruption, low capacity of procurement personnel and poor knowledge of the procurement laws.

Social implications

It recommends effective collaboration between government and civil society groups in the fight against corruption in procurement-related activities, with the implication that there is a need for periodic training for public procurement officials.

Originality/value

It adds to the field of public procurement in terms of value for money in the procurement of goods, services and works in developing countries context.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

1 – 10 of 165