Article
Publication date: 11 March 2022

Robert John Atkinson, Maheshi Tennakoon and Gayan Wedawatta

The lack of collaborative working within the UK construction industry is a long-standing issue that has often been highlighted. As a result, the construction industry in the UK is…

1468

Abstract

Purpose

The lack of collaborative working within the UK construction industry is a long-standing issue that has often been highlighted. As a result, the construction industry in the UK is encouraged to use novel procurement methods to create a collaborative working environment. This study aims to explore the collaborative features of the three new models of construction procurement introduced by the UK Government Construction Strategy in 2012.

Design/methodology/approach

Existing research/literature was reviewed to establish the key collaborative features of the new procurement models, and a questionnaire survey was adopted to obtain views of industry practitioners. A Relative Importance Index was used to analyse the collected data.

Findings

The sample of construction practitioners surveyed largely agrees with the effectiveness of collaborative features integrated within the models, with the benefits offered by early contractor involvement being seen as the most effective feature allowing collaboration. Contractual incentives, improved communication procedures and constant reflection and feedback can be used as effective strategies to enable greater collaboration in projects that use these new procurement models.

Research limitations/implications

Findings reported in the paper could help achieve greater collaboration in construction projects executed using the new models of construction procurement.

Originality/value

This study sheds light on the scepticism and/or conviction of industry practitioners regarding the collaborative benefits offered by the new procurement models, which have not yet been subjected to significant academic scrutiny.

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 18 January 2016

Graeme Bowles and James Morgan

The purpose of this paper is to understand the factors relating to the implementation of a new procurement initiative that affect performance and value for money (VFM). The study…

Abstract

Purpose

The purpose of this paper is to understand the factors relating to the implementation of a new procurement initiative that affect performance and value for money (VFM). The study is based on a four-year research project carried out on behalf of the Scottish Government to monitor and evaluate the performance and efficiency of a bulk procurement vehicle for social housing.

Design/methodology/approach

The researchers had a brief to monitor and evaluate the implementation of the procurement process and its influence on cost and efficiency targets. The study employed a mixed method approach with annual rounds of qualitative and quantitative data collection from project stakeholders including the contractors, consultants, clients and sponsor. Confidential semi-structured interviews were conducted on conclusion of the project to gauge views on how well the procurement process worked from the various perspectives and to reflect on the influence of the process on VFM.

Findings

The procurement programme failed to achieve the capital cost and efficiency savings targets quantified at the outset and on this measure alone VFM was not demonstrated, although there were a number of reported benefits. A major factor was the extent of process and behavioural change required from the project team and, although a procurement consultant was engaged to facilitate this, the theoretical benefits of “best practice” were not realized. The picture was further complicated by rapidly changing economic conditions experienced, and debate about the robustness of original cost savings targets.

Research limitations/implications

The findings and conclusions are of relevance and interest to clients and construction organisations undergoing change through adopting novel procurement processes.

Originality/value

The empirical nature of the study provides a comprehensive evidence base for the performance of a collaborative procurement programme and an understanding of the potential difficulties in attaining the theoretical benefits of procurement innovation.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 February 2015

Patrick Mapulanga

The purpose of this paper was to examine the challenges and opportunities the new public procurement legislation has created for academic librarians as regards the acquisition of…

2600

Abstract

Purpose

The purpose of this paper was to examine the challenges and opportunities the new public procurement legislation has created for academic librarians as regards the acquisition of library materials in academic libraries (university/college libraries) in Malawi.

Design/methodology/approach

The study used a multi-method approach. Quantitative data were collected through questionnaires. The questionnaires were sent online to the university/college libraries of seven major accredited public universities in Malawi. After an initial analysis of that data, qualitative data on patterns were obtained through a mailing listserve with all the possible 19 librarians. Responses were analysed and categorised using a thematic approach.

Findings

Academic libraries (university/college libraries) are involved in the internal procurement committees. Librarians are represented in internal procurement committees, though their representation differs from one institution to another. All the academic libraries (university/college libraries) either use the centralised or independent procurement methods. As a result, the public university libraries deal with agents as independents. Working as independents has negatively affected the libraries, as materials are procured at different prices and sometimes at higher prices, thereby ignoring the value for money.

Research limitations/implications

In academic libraries, the library consortia have pulled resources towards a basket fund for wide access and cheaper licensing. However, for print library materials, a collaborative procurement process in which the academic libraries identify an agent capable of achieving a supplier list and then purchase directly from the preferred suppliers seems not to have been tried in the most developing countries.

Practical implications

The study suggests that academic libraries (university/college libraries) should emulate the library consortia approach when dealing with agents. The academic libraries should consider collaborative procurement models as a means of procuring library materials.

Originality/value

Since the enactment of the public procurement legislation in Malawi, no research has been documented on the challenges and opportunities the public procurement act and the acquisition of library materials. This research seeks to bridge the literature gap.

Details

Library Review, vol. 64 no. 1/2
Type: Research Article
ISSN: 0024-2535

Keywords

Article
Publication date: 11 October 2011

Oihab Allal‐Chérif and Salvator Maira

The length and sheer scale of the current economic crisis has surprised most managers, who were unprepared to deal with such a situation. Standing at the heart of their…

3386

Abstract

Purpose

The length and sheer scale of the current economic crisis has surprised most managers, who were unprepared to deal with such a situation. Standing at the heart of their businesses, procurement managers need to limit the negative impact of the crisis. Restructuring and cost killing are usually the first responses. However, some buyers are pioneering a new kind of collaborative management that, instead of increasing the pressure on suppliers and reducing risk‐taking to a minimum, advocates taking new initiatives. The purpose of this paper is to present a new, “collaborative buyer” approach to the management of the procurement function.

Design/methodology/approach

This qualitative research uses a constructivist methodology based on interviews of 12 buying experts. It develops scenarios and identifies the features of collaborative procurement. In order to map the future of the procurement function, this research looks at the expectations and forecasts of the players involved. The aim is a comprehensive, long, rational, ownership approach that is action oriented.

Findings

The paper offers an overview of new, foresight‐based procurement practices, based on the subtle but precise perception of the faint signs of coming change by people immersed in the procurement sector. The procurement professionals agreed to co‐construct a new buyer profile resulting from changes to the old buyer profile and the convergence of other occupations with new skills and expertise.

Originality/value

The aim is to carefully co‐construct a picture of the future of the procurement function. The paper presents new forms of internal and external collaboration, the roles and specific skills of this type of “buyer of the future,” and how the globalised economy is becoming an increasingly community based, collaborative virtual environment.

Details

International Journal of Physical Distribution & Logistics Management, vol. 41 no. 9
Type: Research Article
ISSN: 0960-0035

Keywords

Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

3318

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 July 2015

Karen Manley and Le Chen

The purpose of this paper is to propose a new model to show how continuous joint learning of participant organisations improves project performance. Performance heterogeneity…

1038

Abstract

Purpose

The purpose of this paper is to propose a new model to show how continuous joint learning of participant organisations improves project performance. Performance heterogeneity between collaborative infrastructure projects is typically examined by considering procurement systems and their governance mechanisms at static points in time. The literature neglects to consider the impact of dynamic learning capability, which is thought to reconfigure governance mechanisms over time in response to evolving market conditions.

Design/methodology/approach

There are two stages of conceptual development. In the first stage, the management literature is analysed to explain the standard model of dynamic learning capability that emphasises three learning phases for organisations. This standard model is extended to derive a novel circular model of dynamic learning capability that shows a new feedback loop between performance and learning. In the second stage, the construction management literature is consulted, adding project lifecycle, stakeholder diversity and three organisational levels to the analysis to arrive at the collaborative model of dynamic learning capability.

Findings

The collaborative model should enable construction organisations to successfully adapt and perform under changing market conditions. The complexity of learning cycles result in capabilities that are imperfectly imitable between organisations, explaining performance heterogeneity on projects.

Originality/value

The collaborative model provides a theoretically substantiated description of project performance, driven by the evolution of procurement systems and governance mechanisms. The model’s empirical value will be tested in future research.

Article
Publication date: 18 July 2016

Karen Manley and Le Chen

Collaboration is thought to offer significant benefits over traditional contracts, however there is little existing research concerning how these benefits can be optimized. To…

1141

Abstract

Purpose

Collaboration is thought to offer significant benefits over traditional contracts, however there is little existing research concerning how these benefits can be optimized. To address this gap, a survey investigated the impact of client characteristics on the time and cost efficiency of collaborative infrastructure projects. The paper aims to discuss these issues.

Design/methodology/approach

The survey of experienced senior practitioners of Australian collaborative infrastructure projects yielded 320 valid responses. Cluster analysis, one-way between group ANOVA tests and independent sample t-tests were used to confirm that three client characteristics are critical to time and cost performance: client sector (public/private); client experience with asset procurement; and client approach to price competition.

Findings

Projects procured by experienced private sector clients were found to meet targeted levels of performance, regardless of their approach to team selection. Among projects procured by experienced public sector clients, groups of relatively low and high performing projects could be distinguished, regardless of their approach to team selection. Projects run by teams selected competitively on non-price criteria prior to the pricing stage exhibited significantly better performance than those run by teams that competed on the price of the project to win the work.

Research limitations/implications

This study focussed only on analysis of three client characteristics. Future research may consider a broader range of contextual variables. Results are based on perceptual data rather than objective data.

Practical implications

The findings show collaborative infrastructure clients in the construction sector should be less concerned about inexperience than they might have been, and more interested in single-team selection approaches than they might have been.

Originality/value

The results indicate significant performance differences between client types. In particular, experienced public sector clients had more polarized performance outcomes, compared to the private sector.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 October 2010

Brodie McAdam

The purpose of this paper is to identify some of the legal problems posed by full adoption of building information modelling (BIM) for construction design, and to propose a…

3586

Abstract

Purpose

The purpose of this paper is to identify some of the legal problems posed by full adoption of building information modelling (BIM) for construction design, and to propose a potential procurement solution for implementation in the UK.

Design/methodology/approach

Legal problems associated with BIM implementation are identified from a literature review, which is then drawn on to outline a potential best practice model for BIM procurement. Two US BIM procurement initiatives – American Institute of Architects (AIA) Document E202 and ConsensusDOCS 301 – are then analysed in relation to their fit with the model for BIM procurement in the UK market.

Findings

Drawing on lessons learned from the AIA and ConsensusDOCS initiatives, the paper concludes that collaborative procurement, perhaps by way of partnering, appears to be an appropriate model for BIM procurement in the UK. However, it notes that empirical research is required in order to identify precisely the best legal approach.

Research limitations/implications

The paper is a scoping work, identifying the ground which needs to be explored before firm conclusions can be drawn.

Originality/value

The legal aspects of BIM procurement remain a relatively unexplored field, and this analysis instructively draws together many of the key threads.

Details

International Journal of Law in the Built Environment, vol. 2 no. 3
Type: Research Article
ISSN: 1756-1450

Keywords

Article
Publication date: 25 September 2009

J. Gordon Murray

This paper aims to consider the problem of public procurement's contribution in moving from the current global economic downturn and accelerating the economic recovery.

5610

Abstract

Purpose

This paper aims to consider the problem of public procurement's contribution in moving from the current global economic downturn and accelerating the economic recovery.

Design/methodology/approach

A literature review is used to establish perceived local government procurement best practice. Secondary research is then drawn upon to establish local government procurement's response to the current economic recession. The paper is set within the context of English local government. The paper's contribution is in highlighting that perceived best public procurement practice may well, in the short‐term, be inappropriate and perhaps delay economic recovery. Suggestions for more radical short‐term procurement strategic interventions are set out and justified as accelerating the economic recovery. The suggestions are considered appropriate, not only for the current crisis, but also for future economic downturns or indeed any country facing such a situation.

Findings

The analysis suggests that English local government procurement strategy generally remains unaltered from that adopted prior to the economic recession. It is then argued that current best practice may well hinder an economic recovery and a short‐term shift in procurement strategy is required.

Research limitations/implications

The economic recession is a current phenomenon and the secondary research could well suffer from self‐selection bias, nevertheless the review of current policy documents suggests that a short‐term shift in procurement strategy is justified.

Practical implications

The paper identifies the weaknesses in current procurement strategy prior to setting out a short‐term alternative procurement strategy that could help public procurement managers accelerate a viable economic recovery.

Originality/value

The current global economic downturn represents a major challenge to public sector organisations, yet there remains an assumption that English local government procurement strategy developed during a period of economic boom, is appropriate during the recession. This paper challenges that assumption and sets out a procurement strategy that could accelerate economic recovery. The strategy advocated can be tested and the lessons learnt utilised in other countries or during future periods of economic downturn.

Details

Supply Chain Management: An International Journal, vol. 14 no. 6
Type: Research Article
ISSN: 1359-8546

Keywords

Open Access
Article
Publication date: 13 October 2023

Roland Hellberg

A deteriorating security situation and an increased need for defence equipment calls for new forms of collaboration between Armed Forces and the defence industry. This paper aims…

1072

Abstract

Purpose

A deteriorating security situation and an increased need for defence equipment calls for new forms of collaboration between Armed Forces and the defence industry. This paper aims to investigate the ways in which the accelerating demand for increased security of supply of equipment and supplies to the Armed Forces requires adaptability in the procurement process that is governed by laws on public procurement (PP).

Design/methodology/approach

This paper is based on a review of current literature as well as empirical data obtained through interviews with representatives from the Swedish Defence Materiel Administration and the Swedish defence industry.

Findings

Collaboration with the globalized defence industry requires new approaches, where the PP rules make procurement of a safe supply of defence equipment difficult.

Research limitations/implications

The study's empirical data and findings are based on the Swedish context. In order to draw more general conclusions in a defence context, the study should be expanded to cover more nations.

Practical implications

The findings will enable the defence industry and the procurement authorizations to better understand the requirements of Armed Forces, and how to cooperate under applicable legal and regulatory requirements.

Originality/value

The paper extends the extant body of academic knowledge of the security of supply into the defence sector. It serves as a first step towards articulating a call for new approaches to collaboration in defence supply chains.