Article
Publication date: 17 July 2023

Nadira Islam Nila, Jhumana Akter and Md. Mehrab Hossain

Change orders are a typical occurrence in building projects. Change orders indirectly affect labor productivity, resulting in a significant delay in the completion of a building…

Abstract

Purpose

Change orders are a typical occurrence in building projects. Change orders indirectly affect labor productivity, resulting in a significant delay in the completion of a building project. Change orders cause labor productivity losses that are difficult to describe, establish and account for contractors and subcontractors. This study aimed to look at the influence of change orders on labor productivity and develop methods to mitigate their adverse effects.

Design/methodology/approach

To assess the change orders' impact on productivity levels a system dynamic model was developed and devise ways were developed to counteract these negative impacts in this research. The impact of change orders on labor productivity and project time was then controlled using techniques established. Finally, a case study of KUET's hall extension was chosen, and the model and principles developed were implemented.

Findings

This study established that if the project delivery date is set and change orders are occurring often, labor productivity will be impacted. With adequate monitoring and supplemental management techniques, it can be reduced by prolonging the project.

Originality/value

The developed policies aid to mitigate the effect of change orders on labor productivity.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 14 February 2023

Sadeq J. Alkhalifah, Firas M. Tuffaha, Laith A. Al Hadidi and Ahmad Ghaithan

The oil and gas construction projects in Saudi Arabia are commonly impacted by the frequent occurrence of change orders. Therefore, this study aims at determining the factors…

Abstract

Purpose

The oil and gas construction projects in Saudi Arabia are commonly impacted by the frequent occurrence of change orders. Therefore, this study aims at determining the factors influencing change orders in the oil and gas construction projects in Saudi Arabia.

Design/methodology/approach

Firstly, the factors are extracted by examining the literature and further refined through experts' feedback. Twenty-one factors were identified in this manner. Thirdly, the factors are prioritized using a questionnaire survey. Responses from 162 professionals have been collected through surveys and ranked using the significance index. The correlation between factor rankings between classes is assessed using Spearman's correlation coefficient. Lastly, using principal component analysis, a change order-related factors conceptual model is developed.

Findings

The five most significant factors were identified and ranked in a general manner or per the category involved. Four main types were involved: project management team (PMT), consultants, contractors and clients. Moreover, a change order-related factors model is proposed. The factors are grouped under four main groups: project definition and planning factors, project stakeholder-related factors, project execution-related factors and project performance and control factors.

Originality/value

Despite the vast factor-related literature in Saudi Arabia. Nevertheless, there has never been a study that investigates the factors influencing change orders in oil and gas projects in Saudi Arabia before. This study not only identifies the change order-related factors but also proposes a model that captures the importance of these factors. This model can aid project professionals in mitigating the impact of the most critical factors encountered during the various phases of the project.

Details

Built Environment Project and Asset Management, vol. 13 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 8 February 2022

Mohammad Hadi Charkhakan and Gholamreza Heravi

Although several studies have aimed to present models to predict conflict outcomes, fewer methods have been developed to analyze conflict manageability and provide management…

Abstract

Purpose

Although several studies have aimed to present models to predict conflict outcomes, fewer methods have been developed to analyze conflict manageability and provide management strategies based on prediction models. This research pitches into the manageability analysis of conflicts occur during the implementation of a proposed change in construction projects. In this way, a framework has been developed by defining two parameters: the predictability index and the preventability index.

Design/methodology/approach

Within this framework, the predictability index determines how many outcomes of the prediction model can be used for conflict management based on the degree of clarity. The preventability index demonstrates how preventive measures for conflict management can be identified. Eventually, three preventive measures can be determined: (1) identifying weaknesses of decision-making patterns and organizational culture, (2) identifying events that may be prevented using soft skills and (3) identifying differences among similar change-implementation scenarios and evaluating causes of the differences. To demonstrate the capabilities of proposed framework, a practical example has been analyzed.

Findings

The results show that the behavior of the project parties can be psychologically analyzed, and psychological conflicts can be distinguished from technical conflicts. Moreover, identifying the weaknesses of parties' decision-making patterns and their organizational culture is the most effective measure to prevent the conflicts.

Originality/value

This research contributes to the construction body of knowledge by quantifying the predictability and preventability of conflicts between the project parties in a construction project based on: (1) the certainty level of the conflict occurrence and (2) the level of alignment between predicted outcomes of the conflict occurrence and the issued change request and/or change order.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 31 October 2023

Emilia Kääriä and Ahm Shamsuzzoha

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the…

1242

Abstract

Purpose

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the most visible process to the customer, and therefore, its punctual and fluent order management is vital. It is observed that the high degree of manual work in the O2C process causes mistakes, delays and rework in the process. The purpose of this article is therefore to analyze the case company's current state of the O2C process as well as to identify the areas of development in this process by deploying the means of Lean Six Sigma tools such as value stream mapping (VSM).

Design/methodology/approach

The study was conducted as a mix of quantitative and qualitative analysis. Based on both the quantitative and qualitative data, a workshop on VSM was organized to analyze the current state of the O2C process of a case company, engaged in the energy and environment sector in Finland.

Findings

The results found that excessive manual work was highly connected to inadequate or incorrect data in pricing and invoicing activities, which resulted in canceled invoices. Canceled invoices are visible to the customer and have a negative impact on the customer experience. This study found that by improving the performance of the O2C process activities and improving communication among the internal and external stakeholders, the whole O2C process can perform more effectively and provide better customer value.

Originality/value

The O2C process is the most visible process to the customer and therefore its punctual and fluent order management is vital. To ensure that the O2C process is operating as desired, suitable process performance metrics need to be aligned and followed. The results gathered from the case company's data, questionnaire interviews, and the VSM workshop are all highlighted in this study. The main practical and managerial implications were to understand the real-time O2C process performance, which is necessary to ensure strong performance and enhance continuous improvement of the O2C process that leads to operational excellence and commercial competitiveness of the studied case company.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 26 April 2022

Asli Pelin Gurgun and Kerim Koc

Contract incompleteness with deficiency, inconsistency, defectiveness, and ambiguity in contract clauses, which can cause misunderstandings and misinterpretations, may result with…

Abstract

Purpose

Contract incompleteness with deficiency, inconsistency, defectiveness, and ambiguity in contract clauses, which can cause misunderstandings and misinterpretations, may result with disputes in projects. This study aims to investigate contract incompleteness factors with a hybrid fuzzy multi-criteria decision approach.

Design/methodology/approach

Contract incompleteness factors were ranked by fuzzy VIKOR (Visekriterijumska Optimizacija I Kompromisno Resenje) method, and the most significant factors were subjected to fuzzy decision-making trial and evaluation laboratory (DEMATEL) to examine their causal relationships. The study is not limited to ranking the identified factors solely, since their cause-effect interactions are also essential for proper risk management in construction projects.

Findings

Hybrid use of multi-criteria analysis reveals that ambiguity in enforceability including excessive demands and significant amendments in the scope of works are the top two causal contract incompleteness factors, while lack of implementation details and focus of focal point, and insufficient supporting and technical documents are the most affected ones.

Originality/value

Contractual causes of disputes due to contract incompleteness factors other than requirements of the contracts have been rarely investigated in the literature. The research is one of the first studies in the literature investigating the causal relationship among factors in construction contracts, which might lead to project disputes. Findings are expected to improve contract drafting, eventually contributing to effective risk management in construction projects.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 April 2024

Akhilesh Bajaj, Wray Bradley and Li Sun

The purpose of our study is to investigate the impact of corporate culture on sales order backlog.

Abstract

Purpose

The purpose of our study is to investigate the impact of corporate culture on sales order backlog.

Design/methodology/approach

The authors use regression analysis to examine the relation between corporate culture and the level of sales order backlog, an important leading indicator of firm performance.

Findings

Using a large panel sample of US firms for the period of 2003–2021, the authors find a significant and positive relation, suggesting that firms with strong corporate culture have a higher level of sales order backlog.

Originality/value

The study findings contribute to two separate areas of research: corporate culture in management literature and sales order backlog in accounting literature. Prior study has focused on the impact of corporate culture on current firm performance. This study extends prior research by investigating the impact of corporate culture on order backlog, an important leading indicator of future performance.

Details

Managerial Finance, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0307-4358

Keywords

Article
Publication date: 11 April 2023

Shekhar Rathor, Weidong Xia and Dinesh Batra

Agile principles have been widely used in software development team practice since the creation of the Agile Manifesto. Studies have examined variables related to agile principles…

Abstract

Purpose

Agile principles have been widely used in software development team practice since the creation of the Agile Manifesto. Studies have examined variables related to agile principles without systematically considering the relationships among key team, agile methodology, and process variables underlying the agile principles and how these variables jointly influence the achievement of software development agility. In this study, the authors tested a team/methodology–process–agility model that links team variables (team autonomy and team competence) and methodological variable (iterative development) to process variables (communication and collaborative decision-making), which are in turn linked to software development agility (ability to sense, respond and learn).

Design/methodology/approach

Survey data from one hundred and sixty software development professionals were analyzed using structural equation modeling methods.

Findings

The results support the team/methodology–process–agility model. Process variables (communication and collaborative decision-making) mediated the effects of team (autonomy and competence) and methodological (iterative development) variables on software development agility. In addition, team, methodology and process variables had different effects on the three dimensions of software development agility.

Originality/value

The results contribute to the literature on organizational IT management by establishing a team/methodology–process–agility model that can serve as a basis for developing a core theoretical foundation underlying agile principles and practices. The results also have practical implications for organizations in understanding and managing holistically the different roles that agile methodological, team and process factors play in achieving software development agility.

Details

Information Technology & People, vol. 37 no. 2
Type: Research Article
ISSN: 0959-3845

Keywords

Open Access
Article
Publication date: 29 June 2023

Shamirah Najjinda, Kasimu Sendawula, Samson Omuudu Otengei, Ahmad Walugembe and Saadat Nakyejwe Lubowa Kimuli

The purpose of this study is to establish whether dynamic capabilities mediates the association between social capital and sustainable growth of full-service restaurants in…

1365

Abstract

Purpose

The purpose of this study is to establish whether dynamic capabilities mediates the association between social capital and sustainable growth of full-service restaurants in Kampala, Uganda.

Design/methodology/approach

This study is cross-sectional and correlational in nature. A self-administered questionnaire was used to gather data from 154 full-service restaurants in Kampala. Statistical Package for the Social Sciences (SPSS.25) and Medgraph – Excel Version were used to conduct correlation, hierarchical regression and mediation analysis on the data in order to establish the mediating role of dynamic capabilities.

Findings

Study findings revealed that first, social capital and dynamic capabilities significantly predict sustainable growth of full-service restaurants, second, social capital is significantly associated with dynamic capabilities and third, dynamic capabilities significantly mediate social capital and sustainable growth of full-service restaurants.

Originality/value

The study confirmed that dynamic capabilities significantly mediate social capital and sustainable growth of full-service restaurants unlike the previous studies that focused on the direct association between the study variables in explicating sustainable growth.

Details

Journal of Work-Applied Management, vol. 15 no. 2
Type: Research Article
ISSN: 2205-2062

Keywords

Article
Publication date: 1 November 2023

Yann Truong and Yosr Ben Tahar

Crises, such as COVID-19 pandemic, are critical events that provoke important changes in organizational practices, regulations and actors' roles. The pharmaceutical sector has…

Abstract

Purpose

Crises, such as COVID-19 pandemic, are critical events that provoke important changes in organizational practices, regulations and actors' roles. The pharmaceutical sector has been strongly affected because of the urgency to produce drugs that are effective and safe. However, the validation process and regulations are historically restrictive in this sector. This study aims to study how biotechnology firms, small companies lacking resources, have undertaken strategic actions during crisis time to induce important changes to their advantage within such a highly regulated environment.

Design/methodology/approach

Interviews were conducted with 21 managers in four mRNA-based biotechnology firms.

Findings

Results showed that rhetorical strategies and institutional actions are used in order to manage change opportunities. Media attention, greater openness of state agencies and public willingness to accept new ways of treatment illustrated this opportunity of change in favor of biotechnology firms.

Originality/value

Highly regulated environments tend to be unfavorable to smaller firms with limited resources to overcome these constraints. The authors show that times of crisis can reverse this assumption through the provision of new opportunities as long as the smaller firms skillfully use strategic actions to exploit the institutional changes at play.

Details

International Journal of Entrepreneurial Behavior & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1355-2554

Keywords

Open Access
Article
Publication date: 30 November 2021

Bianca Bindi, Romeo Bandinelli, Virginia Fani and Margherita Emma Paola Pero

The purpose of this paper was to investigate what types of supply chain strategies (SCS) are implemented within luxury fashion companies, according to the drivers that regulate…

11126

Abstract

Purpose

The purpose of this paper was to investigate what types of supply chain strategies (SCS) are implemented within luxury fashion companies, according to the drivers that regulate competitiveness in this sector (brand positioning, distribution channel, type and line of product). Moreover, the objective was to define which key performance indicators (KPIs) should be measured according to the chosen strategy, and finally to evaluate the alignment of luxury fashion companies with the proposed indicators.

Design/methodology/approach

The literature review was the first step performed. Thereafter, a case study was conducted and the sample, composed of six companies, was selected, a questionnaire was then developed to guide the interviews, after which the data were collected. From the data, a primary case analysis was conducted, from which cross-case patterns were also researched.

Findings

From the results obtained, it was possible to state that companies involved in the case study adopted different SCS within the same company according to the drivers that regulate the sector competitiveness. As a result, the product line was shown to be the only driver that affected both the alignment between the expected and implemented SCS, respectively, and the alignment with the selected KPIs.

Originality/value

The paper provides valuable insights to companies that are trying to align SCS and KPIs. The close link between these aspects had not yet been explored previously. In particular, there were no indications about the KPIs that have to be measured for a specific SCS.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 5
Type: Research Article
ISSN: 1741-0401

Keywords

1 – 10 of over 19000