Search results

1 – 10 of over 27000
Article
Publication date: 1 April 2024

Frank Ato Ghansah

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the…

Abstract

Purpose

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the high complexity of accurately representing and modelling the physics behind the DTs process. This study thus organises and consolidates the fragmented literature on DTs implementation for smart buildings at the facility management stage by exploring the enablers, applications and challenges and examining the interrelationships amongst them.

Design/methodology/approach

A systematic literature review approach is adopted to analyse and synthesise the existing literature relating to the subject topic.

Findings

The study revealed six main categories of enablers of DTs for smart building at the facility management stage, namely perception technologies, network technologies, storage technologies, application technologies, knowledge-building and design processes. Three substantial categories of DTs application for smart buildings were revealed at the facility management stage: efficient operation and service monitoring, efficient building energy management and effective smart building maintenance. Subsequently, the top four major challenges were identified as being “lack of a systematic and comprehensive reference model”, “real-time data integration”, “the complexity and uncertainty nature of real-time data” and “real-time data visualisation”. An integrative framework is finally proposed by examining the interactive relationship amongst the enablers, the applications and the challenges.

Practical implications

The findings could guide facility managers/engineers to fairly understand the enablers, applications and challenges when DTs are being implemented to improve smart building performance and achieve user satisfaction at the facility management stage.

Originality/value

This study contributes to the knowledge body on DTs by extending the scope of the existing studies to identify the enablers and applications of DTs for smart buildings at the facility management stage and the specific challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 1 April 2024

Srikant Gupta, Pooja S. Kushwaha, Usha Badhera and Rajesh Kumar Singh

This study aims to explore the challenges faced by the tourism and hospitality industry following the COVID-19 pandemic and to propose effective strategies for recovery and…

Abstract

Purpose

This study aims to explore the challenges faced by the tourism and hospitality industry following the COVID-19 pandemic and to propose effective strategies for recovery and resilience of this sector.

Design/methodology/approach

The study analysed the challenges encountered by the tourism and hospitality industry post-pandemic and identified key strategies for overcoming these challenges. The study utilised the modified Delphi method to finalise the challenges and employed the Best-Worst Method (BWM) to rank these challenges. Additionally, solution strategies are ranked using the Criteria Importance Through Intercriteria Correlation (CRITIC) method.

Findings

The study identified significant challenges faced by the tourism and hospitality industry, highlighting the lack of health and hygiene facilities as the foremost concern, followed by increased operational costs. Moreover, it revealed that attracting millennial travellers emerged as the top priority strategy to mitigate the impact of COVID-19 on this industry.

Originality/value

This research contributes to understanding the challenges faced by the tourism and hospitality industry in the wake of the COVID-19 pandemic. It offers valuable insights into practical strategies for recovery. The findings provide beneficial recommendations for policymakers aiming to revive and support these industries.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 10 April 2024

Christoph Dörrenbächer, Mike Geppert and Ödül Bozkurt

The purpose of this study is to address the relationship between multinational corporations (MNCs) and grand challenges. Stressing the moderating impact of stakeholders and…

Abstract

Purpose

The purpose of this study is to address the relationship between multinational corporations (MNCs) and grand challenges. Stressing the moderating impact of stakeholders and governments, it frames and introduces the six contributions of the special issue, equally divided into those illustrating how MNCs contribute to the existence of grand challenges and those exploring how MNCs contribute to addressing grand challenges.

Design/methodology/approach

Based on a review of the existing literature on the relationship between MNCs and grand challenges and recent developments in mainstream international business, the viewpoint emphasizes the need to move beyond a one-sided focus on the positive contributions of MNCs to grand challenges.

Findings

The special issue contributions reveal that even established MNCs are actively engaged in strategic efforts to perpetuate unsustainable practices and minimize the impact of societal rules and stakeholders. The contributions also highlight the complications when MNCs aim to tackle grand challenges.

Practical implications

Displaying positive practices of how MNCs contribute to the solution of grand challenges should not be considered a functional substitute for regulatory action, contrary to the frequent assertion of MNCs and their political representatives.

Originality/value

This special issue is the first one in IB to address the relationship between MNCs and grand challenges from an empirical vantage point.

Details

Critical Perspectives on International Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1742-2043

Keywords

Open Access
Article
Publication date: 16 April 2024

Patrick Kraus, Elias Fißler and Dennis Schlegel

In recent years, the robotic process automation (RPA) technology has increasingly been used to automate business processes. While a lot of research has been published on the…

Abstract

Purpose

In recent years, the robotic process automation (RPA) technology has increasingly been used to automate business processes. While a lot of research has been published on the potential and benefits of the technology, only a few studies have conducted research on challenges related to RPA adoption. Hence, this study aims to identify and discuss challenges related to RPA implementation projects.

Design/methodology/approach

Following an inductive methodology, interviews have been conducted with consultants who were involved in multiple RPA implementation projects. Hence, their extensive experience and views contribute to a detailed and in-depth understanding of the phenomena under research.

Findings

The results suggest that there are various process-related, technical, resource-related, psychological and coordinative challenges that must be considered when conducting an RPA implementation project.

Originality/value

This paper contributes to knowledge by presenting a new typology of challenges, as well as providing an in-depth discussion of the individual challenges that organizations face.

Details

International Journal of Organizational Analysis, vol. 32 no. 11
Type: Research Article
ISSN: 1934-8835

Keywords

Article
Publication date: 19 March 2024

Weiyi Cong, Shoujian Zhang, Huakang Liang and Qingting Xiang

Job stressors have a considerable influence on workplace safety behaviors. However, the findings from previous studies regarding the effect of different types of job stressors…

Abstract

Purpose

Job stressors have a considerable influence on workplace safety behaviors. However, the findings from previous studies regarding the effect of different types of job stressors have been contradictory. This is attributable to, among other factors, the effectiveness of job stressors varying with occupations and contexts. This study examines the effects of challenge and hindrance stressors on construction workers' informal safety communication at different levels of coworker relationships.

Design/methodology/approach

A three-dimensional framework of informal safety communication is adopted, including self-needed, citizenship and participatory safety communication. Stepwise regression analysis is then performed using questionnaire survey data collected from 293 construction workers in the Chinese construction industry.

Findings

The results demonstrate that both challenge and hindrance stressors are negatively associated with self-needed and citizenship safety communication, whereas their relationships with participatory safety communication are not significant. Meanwhile, the mitigation effects of the coworker relationship (represented by trustworthiness and accessibility) on the above negative impacts vary with the communication forms. Higher trustworthiness and accessibility enable workers faced with challenge stressors to actively manage these challenges and engage in self-needed safety communication. Similarly, trustworthiness promotes workers' involvement in self-needed and citizenship safety communication in the face of hindrance stressors, but accessibility is only effective in facilitating self-needed safety communication.

Originality/value

By introducing the job demands-resources theory and distinguishing informal safety communication into three categories, this study explains the negative effects of challenge and hindrance job stressors in complex and variable construction contexts and provides additional clues to the current inconsistent findings regarding this framework. The diverse roles of challenge and hindrance job stressors also present strong evidence for the need to differentiate between the types of informal safe communication.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Frank Ato Ghansah, Weisheng Lu and Benjamin Kwaku Ababio

The COVID-19 pandemic has impacted the construction industry, yet still, it is unclear from existing studies about the critical challenges imposed on quality assurance (QA)…

Abstract

Purpose

The COVID-19 pandemic has impacted the construction industry, yet still, it is unclear from existing studies about the critical challenges imposed on quality assurance (QA), particularly Cross-border Construction Logistics and Supply Chain (Cb-CLSC). Thus, this study aims to identify and examine the critical challenges of QA of Cb-CLSC during the COVID-19 pandemic.

Design/methodology/approach

The aim is achieved via an embedded mixed-method approach pragmatically involving a desk literature review and engaging 150 experts across the globe using expert surveys, and results confirmed by semi-structured interviews. The approach is based on Interpretive Structural Modelling (ISM) as its foundation.

Findings

The study revealed ten critical challenges of QA, with the top four including “the shortage of raw construction material (C7)”, “design changes (C6)”, “collaboration and communication difficulties (C1)” and “changes in work practices (C10)”. However, examining the interrelationships among the critical challenges using ISM confirmed C7 and C10 as the most critical challenges. The study again revealed that the critical challenges are sensitive and capable of affecting themselves due to the nature of their interrelationship based on MICMAC analysis. Hence, being consistent with why all the challenges were considered critical amid the pandemic. Sentiment analysis revealed that the critical challenges have not been entirely negative but also positive by creating three areas of opportunities for improvement: technology adoption, worker management, and work process management. However, four areas of challenges in the QA include cost, raw material, time, and work process, including inspection, testing, auditing, communication, etc.

Practical implications

The finding provides a convenient point of reference to researchers, policymakers, practitioners, and decision-makers on formulating policies to enhance the effectiveness of construction QA during the pandemic through to the post-pandemic era.

Originality/value

The study enriches the extant literature on QA, Cb-CLSC, and the COVID-19 pandemic in the construction industry by identifying the critical challenges and examining the interrelationships among them. This provides a better understanding of how the construction QA has been affected by the pandemic and the opportunities created.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 February 2024

Nurin Athilah Masron, Suhaiza Ismail and Zaini Zainol

The objectives of this study are twofold. Firstly, this study aims to examine the challenges of green public procurement (GPP) involvement among small- and medium-sized…

Abstract

Purpose

The objectives of this study are twofold. Firstly, this study aims to examine the challenges of green public procurement (GPP) involvement among small- and medium-sized enterprises (SMEs) government suppliers. Secondly, it investigates the differences in the perceived challenges between the small- and medium-sized groups of companies.

Design/methodology/approach

The study draws on the quantitative method. The questionnaire was distributed to SMEs that supply green goods or services to the government and which are listed in the MyHijau directory. Using convenience sampling, a total of 394 questionnaires were distributed and 126 usable questionnaires were received, representing a response rate of 31.98%. A descriptive analysis of the mean score, standard deviation and mean score ranking was used to analyse the overall results. The t-test analysis was carried out to examine the differences between the small- and medium-sized groups of companies.

Findings

All five categories of the barriers, i.e. financial, legal, people, knowledge and organizational challenges, are perceived as the important challenges for SMEs’ involvement in GPP. Of the five categories, “having lack of knowledgeable staff on GPP” under the category of “people” challenge is ranked as the most major barrier. In relation to the differences between the two groups of enterprises (small- and medium-sized), medium enterprises are more affected by two items under the “organization” challenge, i.e. “The company has not targeted suppliers that promote environmentally-friendly products/services” and “The company has not established a clear objective on purchase of green products and services”, as compared to the small-sized enterprises through their GPP involvement.

Social implications

By understanding the difficulties faced by SMEs in engaging with GPP, various practical measures can be formulated to support the SME businesses in mitigating the challenges faced for their involvement with GPP, which subsequently will lead to the country’s target to reach the sustainable development goals.

Originality/value

This study extends empirical evidence on barriers or challenges that may hinder the involvement in government green procurement, with a specific focus on SME government suppliers.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 16 February 2024

Ayodeji Emmanuel Oke, John Aliu, Lydia Uyi Ehiosun, Ahmed Farouk Kineber and Seyi Segun Stephen

The construction industry in Nigeria, like many others worldwide, grapples with increasing demands for enhanced efficiency, transparency and security. While distributed ledger…

Abstract

Purpose

The construction industry in Nigeria, like many others worldwide, grapples with increasing demands for enhanced efficiency, transparency and security. While distributed ledger technology (DLT) offers substantial potential in tackling these issues, its implementation faces numerous obstacles. This study aims to investigate the challenges hindering the adoption of DLT within the Nigerian construction sector, capitalizing on a recognized research gap in this field.

Design/methodology/approach

A comprehensive literature review identified 20 challenges to DLT adoption. A structured questionnaire was developed and distributed to 98 construction professionals selected from a pool of 5,330 members using purposive and snowball sampling. Background information was assessed using frequency and percentage, data normality with the Shapiro–Wilk test and nonparametric data compared using the Kruskal–Wallis H-test. Factor analysis was then used to reduce the challenges into a more coherent set.

Findings

Findings revealed the top five challenges: power supply issues, data privacy and compliance, an uncertain legal framework, insufficient training and education and a lack of skilled workforce. Further analysis revealed four clusters of challenges, namely, technical and infrastructure barriers, organizational and cultural challenges, financial and economic challenges and regulatory and legal challenges.

Practical implications

Through the evaluation of challenges and potential strategies to overcome them, this study aims to lay a foundation that assists construction entities in effectively harnessing the benefits of DLT while navigating the obstacles inherent in its adoption.

Originality/value

This study contributes to the existing body of knowledge by offering insights into the challenges surrounding the adoption of DLT, specifically within the Nigerian construction sector. By juxtaposing the findings from this study with existing research conducted in other countries such as India, South Africa and the USA, a more comprehensive understanding of the challenges unique to the Nigerian context can be gained.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 31 January 2024

Zaid Alwashah, Ghaleb J. Sweis, Husam Abu Hajar, Waleed Abu-Khader and Rateb J. Sweis

This study aims to examine the challenges facing the construction industry practitioners toward adopting digital construction technologies in the Jordanian construction industry.

Abstract

Purpose

This study aims to examine the challenges facing the construction industry practitioners toward adopting digital construction technologies in the Jordanian construction industry.

Design/methodology/approach

Quantitative methods were used by reviewing the related literature to include 16 challenges that face the Jordanian construction industry in adopting digital construction. A questionnaire was used to achieve the desired study objectives for 373 respondents from various institutions and companies. The questionnaire was analyzed with SPSS using statistical tests such as mean score, Kruskal–Wallis H test and factor analysis.

Findings

After collecting the quantitative data, the study showed that the most challenges facing construction industry practitioners toward adopting digital construction techniques are lack of qualified workers, high requirement for computing equipment’s, high initial cost of bringing these technologies to the market and construction firms low investment in research and development. These challenges faced by respondents were divided into three main factors, namely, construction’s nature, financial constraints and poor management support.

Originality/value

This study provides information and statistics on the challenges that face individuals or companies toward adopting digital construction techniques in Jordan. It proposes recommendations and proper practical implantation strategies to overcome the challenges.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 January 2024

Mohammad Mehrabioun Mohammadi

This research aims to examine the challenges of recruiting participatory action research (PAR) in managing innovation projects. An enhanced methodology based on PAR was developed…

Abstract

Purpose

This research aims to examine the challenges of recruiting participatory action research (PAR) in managing innovation projects. An enhanced methodology based on PAR was developed to mitigate the challenges related to recruiting PAR in managing innovation projects. The proposed methodology was evaluated by comparing it to established methodologies/frameworks such as Scrum, Design Thinking (DT) and The Lean Startup (TLS). The evaluation aimed to determine the advantages and limitations of the proposed methodology in managing innovation projects.

Design/methodology/approach

The proposed enhanced methodology consists of eight steps, ranging from developing an understanding of the industry and business structure to learning and knowledge management. In addition, the enhanced methodology uses other techniques, such as Force field analysis and 12 boundary questions.

Findings

The research findings indicate that using the proposed methodology can improve the formalization of collaboration in PAR, enabling the organization to respond better to market changes. It helps define the project scope more clearly, encouraging innovation, addressing communication barriers and considering different worldviews and practical issues. Based on the findings, the proposed enhanced methodology could complement other methodologies/frameworks such as Scrum, DT and TLS.

Research limitations/implications

The current research adds to the existing literature by identifying the challenges of recruiting PAR in managing innovation projects. A deductive reasoning process was utilized because there is no comprehensive research concerning the challenges of recruiting PAR in managing innovation projects. On the other hand, the PAR 4-phase cycle has been reviewed and enhanced to manage innovation projects.

Practical implications

The proposed methodology was used in a new product development project. The case study was done on one of the payment service provider companies that design, develop and deploy a digital product for marketing, installation, repair and maintenance of electronic funds transfer at point of sale devices.

Originality/value

No research has yet sought to identify the challenges of using PAR in innovation project management (IPM). Identifying the challenges associated with applying PAR in the IPM and providing an enhanced methodology to mitigate the challenges could fill a gap in IPM studies.

Details

International Journal of Managing Projects in Business, vol. 17 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

1 – 10 of over 27000