Article
Publication date: 27 March 2024

Temesgen Agazhie and Shalemu Sharew Hailemariam

This study aims to quantify and prioritize the main causes of lean wastes and to apply reduction methods by employing better waste cause identification methodologies.

Abstract

Purpose

This study aims to quantify and prioritize the main causes of lean wastes and to apply reduction methods by employing better waste cause identification methodologies.

Design/methodology/approach

We employed fuzzy techniques for order preference by similarity to the ideal solution (FTOPSIS), fuzzy analytical hierarchy process (FAHP), and failure mode effect analysis (FMEA) to determine the causes of defects. To determine the current defect cause identification procedures, time studies, checklists, and process flow charts were employed. The study focuses on the sewing department of a clothing industry in Addis Ababa, Ethiopia.

Findings

These techniques outperform conventional techniques and offer a better solution for challenging decision-making situations. Each lean waste’s FMEA criteria, such as severity, occurrence, and detectability, were examined. A pairwise comparison revealed that defect has a larger effect than other lean wastes. Defects were mostly caused by inadequate operator training. To minimize lean waste, prioritizing their causes is crucial.

Research limitations/implications

The research focuses on a case company and the result could not be generalized for the whole industry.

Practical implications

The study used quantitative approaches to quantify and prioritize the causes of lean waste in the garment industry and provides insight for industrialists to focus on the waste causes to improve their quality performance.

Originality/value

The methodology of integrating FMEA with FAHP and FTOPSIS was the new contribution to have a better solution to decision variables by considering the severity, occurrence, and detectability of the causes of wastes. The data collection approach was based on experts’ focus group discussion to rate the main causes of defects which could provide optimal values of defect cause prioritization.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 13 July 2023

Haitham Alajmani, Salma Ahmed and Sameh Monir El-Sayegh

This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19…

Abstract

Purpose

This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19 pandemic onset. The study also measures the likelihood of the effects caused by these delays.

Design/methodology/approach

A mixed approach of both qualitative and quantitative. Literature review was conducted to extract 40 factors of delays and 10 effects of delays. A survey was then administered to construction professionals in the UAE to collect the perceptions on the severity and frequency of factors of the causes of delays using a Likert Scale of 1–5 where 1 represented very low and 5 represented very high. Similarly, the respondents were also asked to rate the likelihood of the occurrence of the effects of the delays based on a Likert scale of 1–5 as well. Furthermore, Spearman’s rank correlation was also conducted to compute the level of agreement between the different parties; owner, consultants and contractors.

Findings

The results revealed that the top five factors of delays include: award the project for the lowest bidder, delay in progress payment, change orders by the owner, poor subcontractor performance and inadequate planning and scheduling by the contractor. The findings of this study emphasize the financial challenges and economic crisis brought upon the construction industry due to the pandemic. Furthermore, the pandemic also shifted the perceptions of construction professionals, who are now more aware of the delays caused by awarding the project to the lowest bidder who would not have the required qualifications to conduct efficient planning and scheduling that are relevant in the case of extraordinary events such as Covid-19. Moreover, a high level of agreement between the consultants and contractors was observed, with a Spearman’s rank correlation of 0.804. Additionally, the most likely effects of delays concluded from this study were time overrun/extension and poor quality of work.

Originality/value

Literature review is very rich in the field of construction projects delays. However, there is very limited research on the impact of Covid-19 in the context of construction projects delays, and insights from construction professionals regarding this matter are particularly lacking in literature. Therefore, this paper bridges the gap in literature by providing perceptions of construction professionals on the impact of Covid-19 on the factors causing delays in the UAE construction industry. The findings of this research are expected to be an invaluable resource for future to help the construction industry heal faster when encountering similar epidemics or extraordinary events.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 12 January 2024

Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Abstract

Purpose

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Design/methodology/approach

A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.

Findings

The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.

Practical implications

The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.

Originality/value

The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?

Details

International Journal of Operations & Production Management, vol. 44 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 13 December 2022

Jonah Duckworth, Abid Hasan and Imriyas Kamardeen

Data from different countries suggest a higher prevalence of anxiety, depression and suicides among manual and trade workers in the construction industry than in the general…

1029

Abstract

Purpose

Data from different countries suggest a higher prevalence of anxiety, depression and suicides among manual and trade workers in the construction industry than in the general population. The present review examines the causes and effects of poor mental health and the effectiveness of interventions to improve manual and trade workers' mental health in the construction industry. It also identifies gaps in research and makes several suggestions for practice and future research.

Design/methodology/approach

A systematic literature review was conducted to examine and consolidate evidence reported in 54 relevant journal articles published between 2010 and 2021 on the mental health of manual and trade workers.

Findings

Three major themes emerged in the review of the 54 journal articles: causes of poor mental health, effects of poor mental health and interventions to improve mental health. The leading causes of poor mental health among construction manual and trade workers are poor work-life balance, high job demand, poor cultural norms and mental health stigma, chronic bodily pain, lack of social support, workplace injustice and job insecurity. The prominent effects of poor mental health are suicidality, drug and alcohol addiction, poor workplace safety and poor work performance. Moreover, the study found that some of the strategies recently implemented in the construction industry to improve mental health are deemed ineffective, or their effectiveness remains inconclusive.

Research limitations/implications

The review's scope is limited to research on manual and trade workers, and it did not investigate the mental health of construction professionals and construction management students.

Originality/value

The review provides valuable insights into the causes and effects of poor mental health among manual and trade workers and the effectiveness of mental health interventions in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 10 April 2023

An Thi Binh Duong, Tho Pham, Huy Truong Quang, Thinh Gia Hoang, Scott McDonald, Thu-Hang Hoang and Hai Thanh Pham

The present study is performed to identify the propagation mechanism of the ripple effect as well as examine the simultaneous impact of risks on supply chain (SC) performance.

2652

Abstract

Purpose

The present study is performed to identify the propagation mechanism of the ripple effect as well as examine the simultaneous impact of risks on supply chain (SC) performance.

Design/methodology/approach

A theoretical framework with many hypotheses regarding the relationships between SC risk types and performance is established. The data are collected from a large-scale survey supported by a project of the Japanese government to promote sustainable socioeconomic development for the Association of Southeast Asian Nations (ASEAN) region, with the participation of 207 firms. Structural equation modeling (SEM) is used to test the hypotheses of the theoretical framework.

Findings

It is indicated that human-made risk causes operational risk, while natural risk causes both supply risk and operational risk. Furthermore, the impacts of human-made risk and natural risk on performance are amplified through operational risk.

Research limitations/implications

This study is one of the first attempts that identifies the propagation mechanism of the ripple effect and examines the simultaneous impact of risks on performance in construction SCs.

Originality/value

Although many studies on risk management in construction SCs have been carried out, they mainly focus on risk identification or quantification of risk impact. It is observed that research on the ripple effect of disruptions has been very scarce.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 July 2023

Adekunle Sabitu Oyegoke, Ben Williams Fisher, Saheed Ajayi, Temitope Seun Omotayo and Duga Ewuga

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate…

Abstract

Purpose

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate the disruptive effects on the supply chain. Covid-19 and Brexit disruption and their longevity effects in the short, medium and long term on the supply chain are relied upon to develop the framework.

Design/methodology/approach

The study adopted a mixed-method approach with a sequential explanatory design. The main disruptive factors were identified through a literature review, and key factors were selected through a focus group exercise. A questionnaire survey was carried out to sample opinions from the practitioners; 41 questionnaires were received and analysed using the relative importance index (RII) method for ranking the factors and percentage frequency distribution to determine the longevity effects. Five follow-up semi-structured interviews were conducted over the telephone and later transcribed.

Findings

The results of Covid-19 disruption indicate that material cost increase ranked first (RII: 0.863), logistics cost increase and supply chain interaction ranked second and third, respectively. They have long-term, medium-term and short-term longevity effects, respectively. The lowest-rated factors were communication (RII: 0.561), staff shortages (RII: 0.629) and impact on relationships (RII: 0.639). The three most ranked Brexit disruptive factors are supply chain interaction (RII: 0.775), material cost increase (RII: 0.766) and logistic and haulage delay (RII: 0.717). The first two factors have long-term effects, and the logistics and haulage delays have a medium-term impact. The mitigating solutions suggested in the framework are collaborative working, stronger resilience to external forces and better transparency and communication that will lead to good relationships among the supply chain members.

Research limitations/implications

The scope of the study was limited to the UK construction industry; however, the pandemic effect on supply chain can serve as critical learning curve in other developed and developing countries.

Practical implications

The study will help the government and construction firms to understand the focal areas of importance in solving the supply chain disruption problems based on the effects of Brexit and Covid-19. The research would be useful in ensuring the proactive involvement of the government and contracting firms in their preparedness for similar events in the future. The results could be interpreted for critical learning in other developed/developing countries.

Originality/value

Identifying and ranking the supply chain disruptive factors affecting the small‐ and medium‐sized enterprises (SMEs) in the UK construction industry has been the focal point of this study. The study also proposes a simple but effective framework comprising the highly ranked factors, their longevity effects and mitigating measures. This will help the SMEs manage future/similar external events affecting the supply chain.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 3 April 2024

Deraniyagalage Chanaka Karunarathna, H.A.H.P. Perera, B.A.K.S. Perera and P.A.P.V.D.S. Disaratna

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with…

Abstract

Purpose

Delays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with resource allocation. Thus, this study investigates the influence of delay in utility shifting for extension of time claims in road construction projects (RCPs) in Sri Lanka.

Design/methodology/approach

The study used a quantitative approach with three rounds of Delphi surveys to gather empirical data. Further, the probability impact assessment was used to carefully analyse the data and appraise the information gathered.

Findings

The findings initially revealed 33 causes of delays in utility shifting for extension of time claims in RCPs in Sri Lanka. Ultimately, 11 severe causes were identified based on their high probability and impact, concluding with 45 strategies that were assigned to overcoming those most severe causes of delay.

Originality/value

This study will contribute to the industry and theory by providing solutions to handle utility-shifting delays with the linkage of preventing time extension claims for RCPs in Sri Lanka. Further, there is a dearth of literature in the research area, both locally and globally. Thus, the findings of this research will provide a benchmark for further detailed studies in other countries as well.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 21 December 2022

Prashan Bandara Wijesinghe and Prasanna Illankoon

The purpose of this study was to improve the overall equipment effectiveness (OEE) of the production process of the shredder operation of ABC company, an industrial waste…

Abstract

Purpose

The purpose of this study was to improve the overall equipment effectiveness (OEE) of the production process of the shredder operation of ABC company, an industrial waste management company which supplies pre-processed industrial waste as alternative fuel to a cement plant.

Design/methodology/approach

This case study investigated all possible availability and performance losses that caused the shredder system’s OEE and various problem-solving techniques, such as root cause analysis and Pareto analysis, were used to find the root cause of the reduced OEE.

Findings

After analysing this case study, three significant loss factors were identified from all the availability and performance losses, which caused the shredder system’s OEE losses. Practical solutions were found for the effect of those loss factors to improve the machine’s OEE and productivity.

Research limitations/implications

This case study has been concentrated on only analysing of losses and improvement of OEE in the production process and not about cost analysis between loss and improvements.

Originality/value

This paper shows how to improve the OEE of a production process through various problem-solving techniques by identifying its losses and how to achieve the best solutions for those losses in a practical manner.

Details

Journal of Global Operations and Strategic Sourcing, vol. 17 no. 2
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 2 April 2024

Amit Vishwakarma, Deepti Mehrotra, Ritu Agrahari, Manjeet Kharub, Sumit Gupta and Sandeep Jagtap

The apparel and textile sector poses a significant environmental challenge due to its substantial contribution to pollution in the form of air, water and soil pollution. To combat…

Abstract

Purpose

The apparel and textile sector poses a significant environmental challenge due to its substantial contribution to pollution in the form of air, water and soil pollution. To combat these issues, the adoption of sustainable practices is essential. This study aims to identify and analyse the barriers that hinder the progress of sustainability in the apparel and textile industry. By consulting experts in the field, critical barriers were identified and given special attention.

Design/methodology/approach

To achieve the research objective, an integrated approach involving Interpretive Structural Modelling (ISM) and fuzzy MICMAC decision-making techniques was employed. The results were further validated through the Decision-Making Trial and Evaluation Laboratory (DEMATEL) method.

Findings

The findings highlight that barrier related to clothing disposal, inadequate adaptation to modern technology, challenges affecting sector efficiency and issues related to fashion design are crucial in influencing the remaining six barriers. Based on the outcomes of the DEMATEL method, a comprehensive cause-and-effect diagram was constructed to gain a deeper understanding of these challenges.

Practical implications

This research provides valuable insights for policymakers and stakeholders in the apparel and textile industry. It offers a strategic framework to address and overcome sustainability barriers, promoting the development of a more environmentally responsible and resilient sector.

Originality/value

The purpose of this research is to conduct an in-depth investigation of the barriers apparel and textile sectors. It is feasible that both the management team and the medical experts who provide direct patient care could benefit from this research.

Details

Journal of Advances in Management Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-7981

Keywords