Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Ruman Thapa, Niranjan Devkota, Krishna Dhakal, Vaibhav Puri, Surendra Mahato and Udaya Raj Paudel

Obtaining building permit certificate is an essential component of construction endeavors, but it can be cumbersome sometimes. The process is frequently beset with obstacles…

45

Abstract

Purpose

Obtaining building permit certificate is an essential component of construction endeavors, but it can be cumbersome sometimes. The process is frequently beset with obstacles, including bureaucratic impediments, red-tapism, prolonged authorization protocols and insufficient inter-agency collaboration which result in project timeline extension, cost escalation and applicant dissatisfaction. Therefore, this study aims to examine customer satisfaction with the assessment of building construction permit certificates in Lalitpur, Nepal.

Design/methodology/approach

Following the notion of evaluation model theory, this study adopts an explanatory research design to determine the causal relationship between latent and observed variables. People who have recently completed the construction of their building and those people whose construction work is pending make up the population for the study. A total of 198 samples were collected by following the convenience sampling method from Lalitpur, Nepal. The primary data are collected by using the structured questionnaire with the interview process where the data are statistically evaluated using descriptive and inferential analysis using the KOBO toolbox, SPSS and AMOS. The connection between variables was examined using structural equation modeling (SEM).

Findings

Results indicate that the negligence of the employees, the attitude of the employees, the need for additional costs and the hiring of the agent are the most significant obstacles encountered by customers during the process of getting construction permit. Regarding the whole assessment system, the general population expresses displeasure. SEM results indicate that environment and quality are significantly related to customer satisfaction.

Originality/value

This paper's novelty lies in its Nepal-specific inquiry into the relationship between building permit acquisition procedures and customer contentment. The study provides a distinctive viewpoint on this context by combining evaluation model theory and SEM. The localized approach emphasizes the importance of customized strategies to improve customer satisfaction, adding to the current literature on the subject. The study's use of SEM as a quantitative analysis tool enhances its methodological rigor. This interdisciplinary research offers valuable insights for academics, practitioners and policymakers in Nepal and contributes to the wider field of construction and customer satisfaction.

Details

Journal of Economic and Administrative Sciences, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1026-4116

Keywords

Article
Publication date: 5 September 2023

Lorea Narvaiza, José Antonio Campos, María Luz Martín-Peña and Eloísa Díaz-Garrido

Digital service innovation (DSI) is a type of technological innovation that is recognized in practice in the innovation structure of companies. Given the breadth of digital…

Abstract

Purpose

Digital service innovation (DSI) is a type of technological innovation that is recognized in practice in the innovation structure of companies. Given the breadth of digital technologies that enable digital services and the variety of these services, analysis is needed to discern the nature of these services, as well as the process that culminates in co-innovation. The literature on DSI is fragmented and spread across multiple research areas. This fragmentation impedes conceptualization of the elements that constitute DSI. This paper describes the nature of DSI through the process and elements of initiation, adoption and routinization of DSI in the context of digital service platforms (DSPs).

Design/methodology/approach

This paper presents a single exploratory case study of a provider of a leading digital solution in customer relations. The data analysis is based on abductive reasoning.

Findings

The paper conceptualizes the nature of DSI and describes the process and elements of DSI (phases, actors, functions and interactions). It contributes to building a common language for DSI research in service management. The analysis shows that DSI in DSPs is synonymous with co-innovation. This paper offers insight into how co-innovation occurs, using hybrid agile methodologies with the coordination of multiple actors and multilateral interactions.

Originality/value

The originality and value of the study reside in its conceptualization and analysis of what is meant by DSI. The components of the service and the technological requirements for not only provision but also ideation and development appear to be inseparable. The study unveils the mechanisms that turn a digital service solution into a co-innovative proposal. This knowledge can facilitate scalability in digital services.

Details

Journal of Service Management, vol. 35 no. 2
Type: Research Article
ISSN: 1757-5818

Keywords

Abstract

Details

Understanding Intercultural Interaction: An Analysis of Key Concepts, 2nd Edition
Type: Book
ISBN: 978-1-83753-438-8

Article
Publication date: 8 April 2024

Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for…

Abstract

Purpose

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.

Design/methodology/approach

The study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.

Findings

Overall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.

Originality/value

The findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Nadin Augustiniok, Claudine Houbart, Bie Plevoets and Koenraad Van Cleempoel

Adaptive reuse processes aim to preserve heritage values while creating new values through the architectural interventions that have become necessary. This claim provokes a…

Abstract

Purpose

Adaptive reuse processes aim to preserve heritage values while creating new values through the architectural interventions that have become necessary. This claim provokes a discussion about the meaning of values, how we can preserve them in practice and how we can translate them into architectural qualities that users experience. Riegl's understanding of the different perspectives of heritage values in the past and present opens up the possibility of identifying present values as a reflection of current social, material and political conditions in the architectural discourse.

Design/methodology/approach

This qualitative and practical study compares two Belgian projects to trace the use of values in adaptive reuse projects from an architectural design perspective. The Predikherenklooster, a 17th-century monastery in Mechelen that now houses the public library, and the C-Mine cultural centre in Genk, a former 20th-century coal mine, are compared. The starting point is Flemish legislation, which defines significance through values, distinguishing between 13 heritage values.

Findings

The study demonstrates the opportunities that axiological questions offer during the design process of an adaptive reuse project. They provide an overarching framework for tangible and intangible aspects that need to be discussed, particularly in terms of the link between what exists, the design strategy and their effect.

Originality/value

Adaptive reuse can draw on approaches from both heritage conservation and contemporary architecture and explore values as a tool for “re-designing” built heritage.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1266

Keywords

Article
Publication date: 15 June 2023

Olha Bondarenko, Maryna Utkina, Oleg Reznik and Mykhailo Dumchikov

The purpose of this paper is to develop a new methodology for the interaction of law enforcement agencies with each other, financial institutions and other legal entities in the…

Abstract

Purpose

The purpose of this paper is to develop a new methodology for the interaction of law enforcement agencies with each other, financial institutions and other legal entities in the field of counteracting and combating the legalization of criminal income as a prerequisite for increasing the effectiveness of their activity in the area of countering and combating money laundering, which will improve the conditions for the development of the financial system and increase the level of living of the population of Ukraine.

Design/methodology/approach

An interdisciplinary approach was used during the writing of the paper. In particular, legal techniques, analysis and generalization, sociological research, questionnaires, etc., were used.

Findings

This paper demonstrates the need for a comprehensive approach to effectively building cooperation between law enforcement agencies in another money laundering. A proposal is made to improve the interaction between law enforcement agencies, financial institutions and other legal entities by creating a single database of information on money laundering and suspicious transactions and involving financial intelligence units in the process of investigating cases of money laundering.

Practical implications

Law enforcement agencies can use the proposed approach to ensure the effectiveness of their activities in counteracting and combating money laundering.

Originality/value

The authors have developed a new approach to improving the interaction of law enforcement agencies in the field of counteracting and combating money laundering, which involves the creation of a single database of information on money laundering and suspicious transactions, as well as the involvement of financial intelligence units in the process of detecting and investigating cases of money laundering.

Details

Journal of Money Laundering Control, vol. 27 no. 1
Type: Research Article
ISSN: 1368-5201

Keywords

Abstract

Details

Becoming a Management Consultant
Type: Book
ISBN: 978-1-83797-039-1

Open Access
Book part
Publication date: 12 December 2023

Logan Crace, Joel Gehman and Michael Lounsbury

Reality breakdowns generate reflexivity and awareness of the constructed nature of social reality. These pivotal moments can motivate institutional inhabitants to either modify…

Abstract

Reality breakdowns generate reflexivity and awareness of the constructed nature of social reality. These pivotal moments can motivate institutional inhabitants to either modify their social worlds or reaffirm the status quo. Thus, reality breakdowns are the initial points at which actors can conceive of new possibilities for institutional arrangements and initiate change processes to realize them. Studying reality breakdowns enables scholars to understand not just how institutional change occurs, but also why it does or does not do so. In this paper, we investigate how institutional inhabitants responded to a reality breakdown that occurred during our ethnography of collegial governance in a large North American university that was undergoing a strategic change initiative. Our findings suggest that there is a consequential process following reality breakdowns whereby institutional inhabitants construct the severity of these events. In our context, institutional inhabitants first attempted to restore order to their social world by reaffirming the status quo; when their efforts failed, they began to formulate alternative possibilities. Simultaneously, they engaged in a distributed sensemaking process whereby they diminished and reoriented necessary changes, ultimately inhibiting the formulation of these new possibilities. Our findings confirm reality breakdowns and institutional awareness as potential drivers of institutional change and complicate our understanding of antecedent microprocesses that may forestall the initiation of change efforts.

Details

Revitalizing Collegiality: Restoring Faculty Authority in Universities
Type: Book
ISBN: 978-1-80455-818-8

Keywords

Article
Publication date: 13 May 2022

Ana Clara Mourão Moura, Camila Fernandes de Morais and Tiago Augusto Gonçalves Mello

There are countless challenges concerning the process of interest mediation. Regarding territorial planning, the participation of different stakeholders is essential. In this…

Abstract

Purpose

There are countless challenges concerning the process of interest mediation. Regarding territorial planning, the participation of different stakeholders is essential. In this sense, Geodesign is a method that supports decision-making based on geocollaboration and co-creation, using geospatial data and tools. The purpose of this study was to use the method to support the co-creation of environmental projects and policies climate-oriented for the Iron Quadrangle region, Brazil.

Design/methodology/approach

The Brazilian platform of Geodesign, GISColab, was used to support the activity. The experiment involved undergraduate and graduate students in Urban Planning and in Geography and technicians that work with planning subjects. Social isolation measures imposed by the pandemic resulted in an adaptation of the dynamic, which was held entirely online.

Findings

The study group proposed 28 designs, in which the most discussed topics were landscape (43%), climate (25%) and risk (25%). This may be associated with the fact that the workshop was conducted in consideration of the UN's Sustainable Development Goals (SDGs) and the environmental crisis, but it might also suggest the group’s prior concern with such issues. Other SDGs were contemplated, with the productive sector as the most negatively impacted by proposals. This situation reinforces the importance of incorporating different actors (a term used for participants in the Geodesign method, referring to representatives from groups of the society) into planning processes. Geodesign was easily accepted and assimilated by participants.

Originality/value

The proposed methodology proved to be positive for this type of study and GISColab, the Brazilian Geodesign platform, was easily adapted to the characteristics and demands of the experience.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 2
Type: Research Article
ISSN: 2398-4708

Keywords