Article
Publication date: 5 January 2024

Madurachcharige Hasini Vidushima Fernando, Duleepa Dulshan Costa, Buddha Koralage Malsha Nadeetharu and Udayangani Kulatunga

A comprehensive literature review was conducted to identify the lean principles and the challenges of building refurbishment. To have an in-depth investigation of the application…

82

Abstract

Purpose

A comprehensive literature review was conducted to identify the lean principles and the challenges of building refurbishment. To have an in-depth investigation of the application of lean principles to address the challenges of refurbishment projects, ten expert interviews following a qualitative research approach were utilised in this research. Data were analysed using manual content analysis to derive the framework.

Design/methodology/approach

The refurbishment of buildings has attracted the attention of the present construction industry. However, uncertain project characteristics, information deficiency, limited space for construction activities and less stakeholder involvement make it complex. Since the lean concept effectively deals with complex and uncertain projects, this study focusses to investigate the application of lean principles to overcome the challenges of refurbishment projects in Sri Lanka by developing a framework.

Findings

It was found that the five main lean principles of customer value, value stream, value flow, pull and perfection are appropriate for building refurbishment projects in Sri Lanka. Precise identification of clients and end-users, value adding and non-value adding activities, interruptions and stakeholder communication chains, setting scope, examining the possible technologies and taking measures to deliver the exact product to ensure the successful application of lean principles for refurbishment projects. Further, 27 benefits of five lean principles were identified which can be used to address the 13 identified challenges of building refurbishment of projects. Finally, a framework has developed portraying the application of lean principles in building refurbishment.

Practical implications

The framework developed is beneficial for the building refurbishment project team to address the barriers of refurbishment projects by applying lean principles.

Originality/value

This framework can be used as a guideline for the implementation of building refurbishment projects by addressing their challenges with lean principles.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 3 May 2022

Olufisayo Adedokun and Temitope Egbelakin

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on…

Abstract

Purpose

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on projects. In the past decades, there has been increasing application of linear assessments of risks in construction risk management practices. However, this study aims to assess the influence of risk factors on the success of tertiary education building projects using a structural equation modelling approach. This study will further reinforce the risk factors that require attention because risk factors are not linear but interdependent.

Design/methodology/approach

A quantitative research method was undertaken in this study, where data collection was achieved via a structured questionnaire survey. In total, 452 questionnaires were administered to client representatives, consultants and contractors involved in executing tertiary education building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were found usable for the analysis, implying a response rate of 61.73%. The Cronbach α test, average variances extracted and composite reliabilities values show high reliability and internal consistency of the instrument used for data gathering. Furthermore, the study adopted percentile, mean, correlation, regression analysis and structural equation modelling for analyzing the data collected upon which the study’s inferences were based.

Findings

The study found that three out of six criteria for measuring the success of tertiary education building projects were significantly affected by risk factors while using the structural equation modelling technique. With this non-linear method of assessment, completion to time was significantly impacted by environmental risk factors. In addition, safety performance was also significantly influenced by logistic, environmental and legal risk factors; furthermore, logistics, design and environmental risks significantly affected profit. However, completion to cost, standard/quality and end-user satisfaction was not significantly affected by the risk factors in tertiary education building projects.

Research limitations/implications

The quantitative data used for the analysis are limited to the tertiary education building projects from selected five tertiary education institutions in Ondo State; therefore, the results do not indicate all tertiary institutions in Nigeria. In addition, the findings are based on building projects that were procured through a competitive tendering arrangement only and thus considered a limitation for this study.

Practical implications

Not all the risks significantly influence the tertiary education building projects. Therefore, risk factors with a significant effect on the success indicators of tertiary education building projects should be prioritized for a successful project. While risk factors have not affected the completion to cost per se, the study implies that the resultant effect of risks on other success indicators could have a cascading effect on these projects in terms of cost and time overruns. These results may assist during the project risk management while also addressing complexity and uncertainty to avoid chaos in a tertiary education building projects.

Originality/value

The study found significant construction risk factors impacting the success of tertiary education building projects using a non-linear methodology, an extension beyond the usual linear method of assessment of risk impacts on the project performance.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 29 March 2024

Esra Keskin, Eunhwa Yang, Harun Tanrıvermiş and Monsurat Ayojimi Salami

The facility management (FM) sector, which is developing rapidly, is making slower progress in Turkey compared to Europe and the USA. This paper aims to research the underlying…

Abstract

Purpose

The facility management (FM) sector, which is developing rapidly, is making slower progress in Turkey compared to Europe and the USA. This paper aims to research the underlying issues leading to FM practices and offer insights into the implications of FM-related policies, especially for large urban transformation projects.

Design/methodology/approach

The study used a mixed-methods research design and collected qualitative data through semi-structured interviews with building/site managers and quantitative data through structured surveys with residents. Forty-nine building/site managers and 660 residents participated in the interview and survey from Turkey’s North Ankara and Dikmen Valley urban transformation projects.

Findings

The FM by residents, performed by the managers selected among homeowners, was preferred to the professional FM in Turkey. Education level, age, homeownership and duration of living in the region were associated with selecting FM practices. Cost also had an important place among the selection criteria, and the standard view from the residents was that professional FM would cause a cost increase. However, interviews with building/site managers in North Ankara and Dikmen Valley Urban Transformation areas revealed that a significant part of the problem resulted from insufficient knowledge and experience in FM.

Research limitations/implications

Within the scope of the research, two urban transformation projects in Ankara Province were selected, and the survey was limited to the North Ankara Entrance Urban Transformation Project and Dikmen Valley Urban Transformation Project areas. Although there is a need to improve the understanding of FM in all facilities, built environments and collective buildings, collective buildings in urban transformation areas due to several constraints, those other identified areas are postponed for future study. In addition, collective buildings located in transformation areas differ from others in discussing the social dimension and the impact of management.

Social implications

Within the scope of the research, two urban transformation projects in Ankara Province were selected, and the survey was limited to the North Ankara Entrance Urban Transformation Project and Dikmen Valley Urban Transformation Project areas. Although there is a need to improve the understanding of FM in all facilities, due to several constraints built environments and collective buildings in urban transformation areas, are postponed for future study. In addition, collective buildings located in transformation areas differ from others in discussing the social dimension and the impact of management.

Originality/value

This study evaluates two different FM approaches: FM by residents and professional FM, implemented in Turkey and identifies the criteria for choosing the FM practice. In addition, both building/site managers and residents evaluate different perspectives on FM. This study is unique because it compares different FM practices in Turkey and the criteria for residents to prefer different FM practices.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 6 February 2024

S. P. Sreenivas Padala and Prabhanjan M. Skanda

The purpose of this paper is to develop a building information modelling (BIM)-based multi-objective optimization (MOO) framework for volumetric analysis of buildings during early…

Abstract

Purpose

The purpose of this paper is to develop a building information modelling (BIM)-based multi-objective optimization (MOO) framework for volumetric analysis of buildings during early design stages. The objective is to optimize volumetric spaces (3D) instead of 2D spaces to enhance space utilization, thermal comfort, constructability and rental value of buildings

Design/methodology/approach

The integration of two fundamental concepts – BIM and MOO, forms the basis of proposed framework. In the early design phases of a project, BIM is used to generate precise building volume data. The non-sorting genetic algorithm-II, a MOO algorithm, is then used to optimize extracted volume data from 3D BIM models, considering four objectives: space utilization, thermal comfort, rental value and construction cost. The framework is implemented in context of a school of architecture building project.

Findings

The findings of case study demonstrate significant improvements resulting from MOO of building volumes. Space utilization increased by 30%, while thermal comfort improved by 20%, and construction costs were reduced by 10%. Furthermore, rental value of the case study building increased by 33%.

Practical implications

The proposed framework offers practical implications by enabling project teams to generate optimal building floor layouts during early design stages, thereby avoiding late costly changes during construction phase of project.

Originality/value

The integration of BIM and MOO in this study provides a unique approach to optimize building volumes considering multiple factors during early design stages of a project

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 25 April 2022

Vuyokazi Precious Camngca, Christopher Amoah and Emma Ayesu-Koranteng

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of…

2109

Abstract

Purpose

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of information technology in project implementation has been increasing in the construction sector (CS) lately. However, the same cannot be seen in public sectors responsible for implementing government projects in South Africa. This study aimed to investigate the causes and effects of the underutilisation of information communication technology (ICT) in the building section of a public sector in a municipality in South Africa.

Design/methodology/approach

A qualitative approach was adopted for the study, using a public sector in one of the municipalities as a case study. Face-to-face interviews were conducted among the building unit workers, using unstructured interview questions. The data collected were analysed using the ATLAS.ti software.

Findings

The findings indicate a lack of understanding of existing and newly available ICT software and hardware technology among staff within the building technology due to lack of digitalisation in construction projects implementation, inadequate system upgrades, lack of adequate ICT resources, lack of financial resources for internet and software application subscriptions and lack of ICT training leading. The issues mentioned above have led to the outsourcing of projects professionals, slow pace of electronic emails, untrained professionals, usage of different and unlicensed software, resulting in the underutilisation of ICT within the whole building section. This change also adversely affects all officials, especially the junior officials who have graduated using the most recent ICT technology during their studies.

Research limitations/implications

The building department of only one public sector was used for the study; therefore, the findings may not be generalisable. The case study public sector’s name is withheld for confidentiality purposes.

Practical implications

Adequate change management and continuous development, combined with the allocation of proper resources, would be necessary for all staff members. Enormous investments had to be made in the ICT equipment by providing a sufficient budget in the building section of the public sectors. The building section within public sectors should provide change management to all aged skills staff by attending seminars to learn new ICT technology applied within its work environment.

Originality/value

The study established the causes of the underutilisation of ICT in the CS, especially in the public work departments and municipalities, and how this contributes to service delivery.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 11 April 2024

Yi Lu, Gayani Karunasena and Chunlu Liu

From May 2024, Victoria (Australia) will mandatorily raise the minimum house energy rating standards from 6 to 7 stars. However, the latest data shows that only 5.73% of new…

Abstract

Purpose

From May 2024, Victoria (Australia) will mandatorily raise the minimum house energy rating standards from 6 to 7 stars. However, the latest data shows that only 5.73% of new Victorian houses were designed beyond 7-star. While previous literature indicates the issue’s link to the compliance behaviour of building practitioners in the design phase, the underlying behavioural determinants are rarely explored. This study thus preliminarily examines building practitioners’ compliance behaviour with 7-star Australian house energy ratings and beyond.

Design/methodology/approach

Using a widely-applied method to initially examine an under-explored phenomenon, eight expert interviews were conducted with building practitioners, a state-level industry regulator and a leading national building energy policy researcher. The study triangulated the data with government-led research reports.

Findings

The experts indicate that most building practitioners involved in mainstream volume projects do not go for 7 stars, mainly due to perceived compliance costs and reliance on standardized designs. In contrast, those who work on custom projects are more willing to go beyond 7-star mostly due to the moral norms for a low-carbon environment. The experts further agree that four behavioural determinants (attitudes towards compliance, subjective norms, perceived behavioural control and personal norms) co-shape building practitioners’ compliance behaviour. Interventions targeting these behavioural determinants are recommended for achieving 7 stars and beyond.

Originality/value

This study demonstrates the behavioural determinants that influence building practitioners’ compliance decisions, and offers insight regarding how far they will go to meet 7 stars. It can facilitate the transition to 7 stars by informing policymakers of customized interventions to trigger behaviour change.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 February 2024

Zhaofeng Ye, Maxwell Fordjour Antwi-Afari, Algan Tezel and Patrick Manu

The impact of building information modeling (BIM) on various aspects of project management has attracted much attention in the past decade. However, previous studies have focused…

Abstract

Purpose

The impact of building information modeling (BIM) on various aspects of project management has attracted much attention in the past decade. However, previous studies have focused on a particular facet of project management (e.g., safety, quality, facility management) and within identified target journals. Despite numerous existing studies, there is limited research on the mainstream research topics, gaps and future research directions on BIM in project management. This study aims to conduct a bibliometric and science mapping review of published articles on BIM in project management and to identify mainstream research topics, research gaps and future research directions in this domain.

Design/methodology/approach

A science mapping approach consisting of bibliometric search, scientometric analysis and qualitative discussion was used to analyze 521 journal articles that were retrieved from the Scopus database and related to BIM in project management. In the scientometric analysis, keyword co-occurrence analysis and document analysis were performed. This was followed by a qualitative discussion that seeks to propose a framework summarizing the interconnection between the mainstream research topics, research gaps and future research directions.

Findings

Six mainstream research topics were found including (1) BIM-enabled advanced digital technologies, (2) BIM-based reinforcement and enhancement, (3) BIM and project composition, (4) BIM project elements and attributes, (5) BIM-based collaboration and communication and (6) BIM-based information and data. Moreover, this study discussed six research gaps, namely, (1) integration of BIM and other digital technologies, (2) future maturity of BIM applications in project management, (3) application of BIM in project components and processes, (4) role of BIM application in project elements and attributes, (5) impact of collaboration and communication in BIM application and (6) stability of information and data interaction. Furthermore, future research directions were discussed.

Originality/value

The findings and proposed framework contribute to providing a deeper understanding to researchers, policymakers and practitioners in the development of related research and practice in the domain of BIM in project management, thus, promoting digital transformation in project management. Overall, it adds to the global knowledge domain in BIM and promotes the need for digital and data integration, BIM maturity and BIM collaboration.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2024

Ayodeji Emmanuel Oke, John Aliu, Doyin Helen Agbaje, Andrew Ebekozien, Douglas Omoregie Aghimien, Feyisetan Leo-Olagbaye and Clinton Aigbavboa

The purpose of this study is to identify and evaluate the primary constraints that quantity surveying firms in Nigeria encounter while integrating indoor environmental quality…

Abstract

Purpose

The purpose of this study is to identify and evaluate the primary constraints that quantity surveying firms in Nigeria encounter while integrating indoor environmental quality (IEQ) principles into building designs.

Design/methodology/approach

The study used a quantitative approach by administering a well-structured questionnaire to 114 quantity surveyors. The collected data were analyzed using methods such as frequencies, percentages, mean item scores, Kruskal–Wallis test and exploratory factor analysis.

Findings

The top five ranked constraints were limited access to funding or financing options, limited availability of green materials, limited availability of insurance for sustainable buildings, limited availability of sustainable design resources and limited diversity and inclusivity within the design profession. Based on the factor analysis, the study identified six clusters of constraints: structural-related constraints, technical-related constraints, financial-related constraints, capacity-related constraints, legal-related constraints and culture-related constraints.

Practical implications

This study has several practical implications for quantity surveying firms, policymakers and industry stakeholders involved in building design and construction in Nigeria. The findings of this study can also inform future research on the integration of IEQ principles into building designs.

Originality/value

By identifying and structuring the clusters of constraints faced by quantity surveying firms in Nigeria when implementing IEQ principles, this study provides a novel approach to understanding the challenges associated with IEQ implementation in the building sector. This understanding can guide policymakers, industry stakeholders and quantity surveying firms in developing effective strategies to overcome these constraints and promote IEQ principles in building design and construction.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175