Search results

1 – 10 of 375
Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

3356

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Abstract

Purpose

Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts is limited. This paper aims to explain and conceptualise recent Romanian experience with developing bespoke competency frameworks at national level for public procurement that reflect the features of the Romanian public procurement system. The approach used could guide in broad-brush, mutatis mutandis, other (national) public procurement systems with comparable features, mainly those seeking a shift from a rather administrative function of public procurement towards a strategic function.

Design/methodology/approach

This case study reflects on the methodology used for analysing the Romanian public procurement environment in EU context to develop bespoke professionalisation instruments, and on ways to integrate competency management approaches in Romanian public procurement culture. That methodological mix has been mainly qualitative and constructionist, within an applied research approach. It combined desk research with empirical research and included legal research in this context.

Findings

A principled, methodological and pragmatic approach tailored to the procurement environment in question is essential for developing competency frameworks capable to resonate to and address the specific practical needs of that procurement system.

Social implications

Competency frameworks can uphold societal objectives through public procurement.

Originality/value

Using valuable insights into the development of the Romanian public procurement competency frameworks, the paper provides a conceptual framework for instilling competency management approaches to public procurement professional development where the latter is governed by a rather distinct, public administration, paradigm. This conceptual framework can guide other public procurement systems and stimulate further research.

Open Access
Article
Publication date: 2 April 2024

Șerban Filipon and Violeta Simionescu

Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts…

Abstract

Purpose

Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts is limited. This paper aims to explain and conceptualise recent Romanian experience with developing bespoke competency frameworks at national level for public procurement that reflect the features of the Romanian public procurement system. The approach used could guide in broad-brush, mutatis mutandis, other (national) public procurement systems with comparable features, mainly those seeking a shift from a rather administrative function of public procurement towards a strategic function.

Design/methodology/approach

This case study reflects on the methodology used for analysing the Romanian public procurement environment in EU context to develop bespoke professionalisation instruments, and on ways to integrate competency management approaches in Romanian public procurement culture. That methodological mix has been mainly qualitative and constructionist, within an applied research approach. It combined desk research with empirical research and included legal research in this context.

Findings

A principled, methodological and pragmatic approach tailored to the procurement environment in question is essential for developing competency frameworks capable to resonate to and address the specific practical needs of that procurement system.

Social implications

Competency frameworks can uphold societal objectives through public procurement.

Originality/value

Using valuable insights into the development of the Romanian public procurement competency frameworks, the paper provides a conceptual framework for instilling competency management approaches to public procurement professional development where the latter is governed by a rather distinct, public administration, paradigm. This conceptual framework can guide other public procurement systems and stimulate further research.

Article
Publication date: 28 June 2023

Nur Faiza Ishak and Vinesh Thiruchelvam

The purpose of this study is to discuss policy review in the interest of sustainable innovations in Malaysia’s public procurement. This study also offers the overall relationship…

1941

Abstract

Purpose

The purpose of this study is to discuss policy review in the interest of sustainable innovations in Malaysia’s public procurement. This study also offers the overall relationship between existing policies related to sustainable innovations in public procurement and the coherences towards the four dimensions of sustainable innovations.

Design/methodology/approach

This study outlines the current policies in Malaysia which are related to sustainable innovation initiatives and explores the cohesiveness that appears disconnected and understood separately. Policy content analysis is conducted on the current policies related to sustainable innovations in the context of Malaysia’s public procurement.

Findings

This study observed that the current policies related to sustainable innovations in public procurement are actually interconnected with each other through a hierarchical framework. This study also demonstrates that the 12th Malaysia Plan has comprehensively encompassed every aspect of the environment, social, economic and innovation to contribute to one primary goal – green economic growth.

Research limitations/implications

The proposed policy framework is expected to be beneficial for the administrator executive among the civil servant to connect the independent policies and, at the same time, contribute to the overall goal of green economic growth. Through a broad policy structure too, this study helps the industry player to recognize their potential in any area related to sustainable innovation.

Originality/value

The policy framework illustrated is new to the literature, especially in Malaysia’s context. The compilation of current policy grounded by the 12th Malaysia Plan has not been presented in any publications.

Article
Publication date: 8 April 2024

Hasith Chathuranga Victar and Anuradha Samarajeewa Waidyasekara

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address…

Abstract

Purpose

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address these issues, this study explores the application of Circular Economy (CE) strategies in minimising waste generation and optimising resource utilisation in Sri Lankan construction industry. The research focuses on the construction and building renovation and use and operate stages of the building project life cycle, recognising their significance in waste generation and resource consumption.

Design/methodology/approach

The research employed a qualitative approach, utilising the Delphi technique through three rounds of expert interviews. Seventeen experts were involved in the first round, followed by fifteen in the second round, and twelve in the final round. The collected data was analysed using manual content analysis methods.

Findings

The research findings revealed fifteen C&D WM issues in the construction and building renovation stage in Sri Lanka, along with suitable strategies to overcome each of them. Similarly, eight C&D WM issues were identified for the use and operate stage of the building, and corresponding strategies were provided to address each issue. By adopting CE strategies such as modular design and material reuse, construction projects can optimise the project's timeline, cost, and quality factors. These strategies enable efficient resource allocation, reduce waste generation, and contribute to the overall sustainability of the project. The impact of CE strategies on mitigating these issues within the project management iron triangle was also discussed.

Originality/value

This paper entails delving into how construction, building renovation, and operation stages of a building's life cycle intersect with CE strategies, which profoundly influence operational efficiency and long-term sustainability. By incorporating principles such as energy efficiency, water conservation, and circular product design, the paper illuminates how these strategies facilitate decreased energy usage, enhanced resource management, and diminished waste production throughout the building's lifespan.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 May 2022

Lee Felix Anzagira, Daniel Duah, Edward Badu, Eric Kwame Simpeh and Alexander B. Marful

The purpose of this paper is to ascertain the significant stimulating measures/enablers relating to the existing building regulations for promoting the adoption and overcoming the…

Abstract

Purpose

The purpose of this paper is to ascertain the significant stimulating measures/enablers relating to the existing building regulations for promoting the adoption and overcoming the barriers to the uptake and implementation of the green building concept (GBC) in developing countries using Ghana as a case.

Design/methodology/approach

The quantitative research approach was used to attain the study’s goal. Purposive and snowball sampling techniques were found to be suitable for collecting data from 292 relevant stakeholders in Ghana’s construction industry. The mean score ranking technique, in conjunction with the relative importance index, was used to establish the relative ranking of, among other things, the stimulus measures for increasing green building uptake in Ghana. An exploratory factor analysis was also used to classify the most significant stimulation strategies for improving green building uptake.

Findings

“Educational programmes relevant to GBTs for developers, contractors, and policymakers,” “sufficient information on the cost and benefits of GBTs” and “mandated green building codes and regulations” were the top three listed stimulating measures to promote increasing use of green building technologies (GBTs). The enablers were classified as follows: government regulations and policies; commitment and GB research; education and publicity; and incentives and support.

Research limitations/implications

The study was conducted in Ghana, a developing nation, and thus the findings and implications are peculiar to Ghana. However, the study’s findings have important practical implications for the adoption and marketing of GBCs and GBTs in other developing nations.

Originality/value

Prioritizing major stimulation initiatives may be beneficial in terms of overcoming the constraints to the adoption of GBCs and GBTs in developing countries.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 14 December 2022

Ahsan Nawaz and Francis Lanme Guribie

Social procurement (SP) is a complicated and risky innovation, the adoption of which needs to be accompanied by complementary process and organizational change. To date, however…

Abstract

Purpose

Social procurement (SP) is a complicated and risky innovation, the adoption of which needs to be accompanied by complementary process and organizational change. To date, however, there has been little empirical evidence explaining whether and how different sorts of external pressures affect the level of SP adoption in the construction sector. Drawing on institutional theory, this study aims to analyze how three types of isomorphic pressures (i.e. coercive, mimetic and normative pressures) influence the adoption of SP in the construction sector.

Design/methodology/approach

The impacts of these pressures are empirically tested with survey data collected from 134 construction firms in the Chinese construction industry.

Findings

The findings show that both coercive and mimetic pressures have a considerable impact on the adoption of SP. However, there is little evidence in this study that normative demands had a major impact on SP.

Practical implications

This research is a useful instrument for promoting a favorable social attitude regarding construction procurement. Through socioeconomic regeneration and development, procurement can be considered as a significant route for social transformation, economic development and poverty reduction.

Originality/value

This study addresses the paucity of research into SP in the construction industry by establishing the institutional drivers to procuring services and products from a social enterprise perspective. Findings from this study extend the frontiers of existing knowledge on SP in the construction industry.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 March 2022

Innocent Chigozie Osuizugbo, Kevin Chuks Okolie and Olalekan Shamsideen Oshodi

Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research…

Abstract

Purpose

Improving buildability of building designs with the aid of buildability assessment is essential because of the effect of designs on construction. Despite the plethora of research into buildability reported over the years, a review of the literature shown a dearth of research into the factors supporting the implementation of buildability assessment. Because buildability assessment has been confirmed to be highly beneficial to construction business, this study aims to investigate the factors supporting the implementation of buildability assessment as a tool for buildability improvement using Nigeria as a representative case.

Design/methodology/approach

Survey research method was adopted for the study. Questionnaires were administered to a purposively selected group of architects, engineers, builders and quantity surveyors involved in construction project delivery within client, consulting and contracting organisations in Nigeria. A total of 368 questionnaires were distributed among the sampled participants, out of which, a total of 219 representing 60% were sufficiently filled and returned. Data collected were analysed using inferential and descriptive statistics.

Findings

The results revealed owner’s commitment, clients’ awareness of the benefits of conducting buildability assessment on building design, unity amongst different professionals in the construction industry, designers consider buildability important, adequate coordination amongst different design disciplines, adequate channel for co-ordination and communication between designers and constructors at the design stage and adequate support from the government as the top most seven factors supporting buildability assessment implementation in construction sector of Nigeria. Secondly, the results from the research revealed that there is no statistically significant difference in factors supporting buildability assessment implementation in construction between clients and consulting and contracting construction organisations in Nigeria.

Originality/value

The findings provide in-depth insight of the factors supporting the implementation of buildability assessment in construction that can help principal stakeholders in construction to facilitate development of strategies required in supporting the adoption and implementation of buildability assessment tool for buildability improvement.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 April 2024

Nurin Athilah Masron, Zaini Zainol and Suhaiza Ismail

The objectives of this paper are twofold. First, it aims to investigate the impact of the COVID-19 pandemic on the activities and performance of small and medium-sized enterprises…

Abstract

Purpose

The objectives of this paper are twofold. First, it aims to investigate the impact of the COVID-19 pandemic on the activities and performance of small and medium-sized enterprises (SMEs) government suppliers involved in government green procurement (GGP). Second, it examines the differences in the impact of COVID-19 between small and medium-sized groups.

Design/methodology/approach

The study used a questionnaire survey that was distributed to SMEs listed in the MyHIJAU directory that supply green goods and services to the government. Of the total 394 sample respondents, 126 usable questionnaires were received, representing a usable response rate of 31.98%. Descriptive analysis of mean score, standard deviation and mean score ranking was used to analyse the overall results. A t-test analysis was carried out to examine the differences between the small and medium-sized groups of companies.

Findings

The study discovers that the SME government suppliers involved in GGP were impacted by the COVID-19 pandemic. The top ranked impacts are that “the COVID-19 pandemic has heightened health and safety practices among the employees”, “the COVID-19 pandemic has reduced company’s turnover”, “the COVID-19 pandemic has forced the company to implement a cost reduction strategy”, “the COVID-19 pandemic has had a negative impact on the company’s ability to deliver work, supplies or services to the government” and “the COVID-19 pandemic has forced the company to incur higher production costs for green products or services provided”. However, there is no significant difference between the impact of the COVID-19 pandemic on the small and medium-sized group of enterprises.

Originality/value

The present study is among the fewer studies on the impact of the COVID-19 pandemic, with particular focus on SME government suppliers involved in GGP.

Details

Journal of Economic and Administrative Sciences, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1026-4116

Keywords

1 – 10 of 375