Search results

1 – 10 of over 17000
Article
Publication date: 4 November 2020

G.P.P.S. Perera, T.M.M.P. Tennakoon, Udayangani Kulatunga, Himal Suranga Jayasena and M.K.C.S. Wijewickrama

The purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement…

Abstract

Purpose

The purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement selection factors and existing procurement systems.

Design/methodology/approach

An abductive research stance is followed in this empirical study. Procurement selection factors were selected through a critical literature review which was followed by a quantitative questionnaire survey. The collected data were analysed using descriptive statistical analysis and relative important index.

Findings

The critical literature review outlined 46 procurement selection factors, out of which 26 factors were very important in steel building procurement selection. Short construction period and higher constructability of design are ranked at the top with the highest priority rating factors. Management-oriented procurement system was selected as the most appropriate procurement system for steel building constructions within the Sri Lankan context.

Research limitations/implications

The study is limited to widely use three procurement systems in Sri Lankan construction industry. Yet, the process followed in selecting the most appropriate procurement system could be applied for other contexts. The implications of the study are mainly identifying management-oriented procurement as the most suitable procurement method for steel building construction in Sri Lanka.

Practical implications

The systematic procedure of procurement method selection for steel building construction may use in the Sri Lankan construction industry to limit the resource loss due to wrong selection of procurement.

Originality/value

A study which critically and comprehensively presenting a procurement selection process for steel building construction is not recorded in Sri Lanka prior to this study.

Details

Built Environment Project and Asset Management, vol. 11 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 5 November 2018

Kouliga Koala and Joshua Steinfeld

The purpose of this paper is to examine the level of theory building in public procurement by reviewing and classifying manuscripts published in the Journal of Public Procurement

Abstract

Purpose

The purpose of this paper is to examine the level of theory building in public procurement by reviewing and classifying manuscripts published in the Journal of Public Procurement (JoPP) from 2001 to 2016.

Design/methodology/approach

The articles are divided into four important periods: discovery, agenda setting, embracing and expansion and consolidation. The articles are classified according to a hierarchical level of theory building composed of six levels: rapporteurs, reporters, testers, qualifiers, builders and expanders.

Findings

Key findings indicate that public procurement, in light of JoPP publications from 2001 to 2016, is at the tester level. There is also increase in the classification of articles with high level of theoretical contribution over time.

Details

Journal of Public Procurement, vol. 18 no. 4
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 1 February 1999

P.A. BOWEN, R.G. PEARL and P.J. EDWARDS

An effective client briefing process and the selection of an appropriate building procurement system both contribute to the attainment of client objectives with respect to time…

1560

Abstract

An effective client briefing process and the selection of an appropriate building procurement system both contribute to the attainment of client objectives with respect to time, cost and quality for construction projects. The present paper documents the results of an empirical study into the nature and effectiveness of the project briefing process, and the selection and effectiveness of procurement methods in the attainment of client objectives. A national questionnaire survey was administered to clients, architects, quantity surveyors, engineers, project managers and general contractors in South Africa. The results show that room for improvement exists in the manner in which project briefing is conducted and the manner in which procurement methods are selected.

Details

Engineering, Construction and Architectural Management, vol. 6 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 January 2001

JOHN E. TOOKEY, MICHAEL MURRAY, CLIFF HARDCASTLE and DAVID LANGFORD

Today there are a number of different types of procurement routes available for clients to choose from. Each different type of procurement (traditional, design and build…

6169

Abstract

Today there are a number of different types of procurement routes available for clients to choose from. Each different type of procurement (traditional, design and build, management, etc.) has its own proponents and inherent strengths and weaknesses. Selection of optimal procurement systems is difficult, because even experienced clients cannot know all the potential benefits or risks for each system. Procurement is, therefore, a succession of ‘calculated risks’. Industry and academia have focussed research on reducing procurement risk through better procurement‐system selection methods. Current research considers procurement as a set of rationalistic decisions within a closed environment, aiming to produce generic, prescriptive rules for clients and advisers to use to select the ‘best’ procurement route for their project. This paper seeks to identify whether prescriptive procurement guidance was adhered to on a set of case study projects. It was found that clients usually selected appropriate procurement systems, and where an inappropriate system was selected, alterations were made in contract form to incorporate aspects of the ‘best’ procurement route.

Details

Engineering, Construction and Architectural Management, vol. 8 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 March 2017

Rizal Yaya

This research evaluates the value-for-money (VFM) obtained from public-private partnership (PPP) schools in Scotland, based on headteachers questionnaires, local authority…

Abstract

This research evaluates the value-for-money (VFM) obtained from public-private partnership (PPP) schools in Scotland, based on headteachers questionnaires, local authority interviews and Scottish School Estate Statistics. The period covered is 2000-2012, when 395 new schools were commissioned. The PPPs were better in building condition and maintenance standards and conventionally-financed schools were better in terms of teacher access and improvement in staff morale. There was transfer of knowledge whereby the high standards of the PPPs then became the new standards for the conventionally-financed schools. Concerns about PPP VFM relates to the high cost of unitary charges and contract inflexibilities. A higher percentage of headteachers of conventionally-financed schools (63.64%) considered their new schools resulted in good VFM compared to PPP schools (42.86%).

Details

Journal of Public Procurement, vol. 17 no. 2
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 4 April 2016

Shamil George Naoum and Charles Egbu

The purpose of this paper is to present a comprehensive literature review that seeks to address modern factors worldwide that are associated with the selection of current…

11354

Abstract

Purpose

The purpose of this paper is to present a comprehensive literature review that seeks to address modern factors worldwide that are associated with the selection of current procurement methods. The aim is to develop an up-to-date multi-attribute procurement decision-making chart for selecting the appropriate method for the project.

Design/methodology/approach

Stage 1 (literature review). The search engines, Emerald; Business Source Premier; Science Direct and Sage were selected to identify journals that have published the most procurement methods-related articles. The search covered the period 1980-2015. Stage 2 (Survey) – after analyzing and appraising the literature, an up-to-date utility decision-making chart for selecting the appropriate procurement method for the project was developed. The chart was based on findings from a survey that included 57 construction professionals and who have demonstrated sound experience about the various procurement options.

Findings

There is no one best procurement method for all projects. The selection depends on the nature of the issues or problem at hand. Decision making is not a punctual act. It is often a complex process. Effective decision making also demands quality and timely information, and a careful consideration of alternatives. The multi-attribute decision-making chart presented in this paper has included modern criteria and the client would have end up with different recommendations and consequences should these criteria were not included in priority weightings.

Practical implications

The literature review provides states-of-the art research in the field of procurement methods in construction and the multi-attribute chart is intended to offer decision makers an opportunity to broaden their horizon on the different alternatives procurement routs that could lead to different consequences.

Originality/value

To the best of the authors’ knowledge, very few publications have discussed modern selection criteria for procurement methods in construction under one study. Therefore, this paper has established a platform for scholars and researchers to obtain more useful insights into procurement methods concerns. It has identified research trends in procurement methods which may allow industrial practitioners to appreciate the key concerns in their development of modern concepts and principles such as supply chain, lean construction, sustainability, innovation, value engineering, e-procurement and Building information modeling. The inclusion of these modern criteria will present and add value to procurement decision makers within the construction industry.

Details

International Journal of Managing Projects in Business, vol. 9 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 22 January 2021

Patrick Manu, Richard Ohene Asiedu, Abdul-Majeed Mahamadu, Paul Olaniyi Olomolaiye, Colin Booth, Emmanuel Manu, Saheed Ajayi and Kofi Agyekum

Effective procurement of infrastructure is linked to the attainment of the sustainable development goals set by the United Nations. While the capacity of organisations is…

Abstract

Purpose

Effective procurement of infrastructure is linked to the attainment of the sustainable development goals set by the United Nations. While the capacity of organisations is generally thought to be related to organisational performance, there is a lack of empirical insights concerning the contribution of procurement capacity of public organisations towards the attainment of procurement objectives in infrastructure procurement. Thus, it is unclear which aspects of the capacity of public procurement organisations contribute the most to the attainment of procurement objectives in the procurement of infrastructure. This research sought to address this gap.

Design/methodology/approach

The research used a survey of public procurement professionals which yielded 590 responses.

Findings

Exploratory factor analysis of 23 organisational capacity items revealed three components of organisational procurement capacity: “management of the procurement process”; “human and physical resources”; and “financial resources and management”. Multiple regression modelling of the relationship between the components and the attainment of 12 procurement objectives further reveals that there is a significant positive relationship between the three components and all the objectives. However, “management of the procurement process” emerged as the greatest contributor to the attainment of seven objectives, whereas “human and physical resources”, and “financial resources and management” were the greatest contributor to the attainment of one objective and four objectives, respectively.

Originality/value

The study provides strong empirical justification for investment in the development of procurement capacity of public agencies involved in procurement of infrastructure. Furthermore, procurement capacity development of specific capacity components can be prioritised based on the relative contribution of capacity components to the attainment of desired procurement objectives. This should be useful to government policymakers as well as multilateral organisations that fund infrastructure and procurement reforms in various countries.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 January 2009

Karim Hadjri and Carl Crozier

This paper explores the historical development of POE in order to provide a contextual backdrop to current discussions.

5106

Abstract

Purpose

This paper explores the historical development of POE in order to provide a contextual backdrop to current discussions.

Design/methodology/approach

This paper attempts to establish what POE is and does, and explores POE methodologies.

Findings

This paper concludes that the fact that this topic is extensively discussed highlights a growing frustration with the lack of progress toward POE becoming a mainstream activity in the process of building procurement. Other findings include POE's exclusion from professional curricula; who pays for POE? And issues with professional liability and its contribution to this lack of use.

Practical implications

The paper presents the benefits accrued by stakeholders in the building procurement process, and the barriers to the adoption of POE that need to be addressed.

Originality/value

This literature review suggests that despite the trials and tribulations, POE has progressed from a one dimensional feedback process to a multidimensional process that, as an integrated element, can help drive the building procurement process forward. The paper presents an objective overview of literary discourse around POE, its potential and limitations.

Details

Facilities, vol. 27 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 1 August 2005

G.A. John, D.J. Clements‐Croome, V. Fairey and H.M. Loy

This paper proposes assessing the context within which integrated logistic support (ILS) can be implemented for whole life performance of building services systems.

1164

Abstract

Purpose

This paper proposes assessing the context within which integrated logistic support (ILS) can be implemented for whole life performance of building services systems.

Design/methodology/approach

The use of ILS within a through‐life business model (TLBM) is a better framework to achieve a well‐designed, constructed and managed product. However, for ILS to be implemented in a TLBM for building services systems, the practices, tools and techniques need certain contextual prerequisites tailored to suit the construction industry. These contextual prerequisites are discussed.

Findings

The case studies conducted reinforced the contextual importance of prime contracting, partnering and team collaboration for the application of ILS techniques. The lack of data was a major hindrance to the full realisation of ILS techniques within the case studies.

Originality/value

The paper concludes with the recognition of the value of these contextual prerequisites for the use of ILS techniques within the building industry.

Details

Engineering, Construction and Architectural Management, vol. 12 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 November 2021

Richard Ohene Asiedu, Patrick Manu, Abdul-Majeed Mahamadu, Colin Anthony Booth, Paul Olomolaiye, Kofi Agyekum and Mohamed Abadi

Effective procurement of infrastructure is partly dependent on infrastructure procurement personnel having the skills that are important for the discharge of their role…

Abstract

Purpose

Effective procurement of infrastructure is partly dependent on infrastructure procurement personnel having the skills that are important for the discharge of their role. Addressing the infrastructure deficits in developing countries, therefore, calls for an understanding of the skills that are important for the discharge of the roles of public personnel that are involved in infrastructure procurement. This study aims to investigate these skills from the perspective of public infrastructure procurement personnel in the sub-Saharan African region.

Design/methodology/approach

A questionnaire survey of procurement personnel yielded 590 useable responses, which were analysed using t-tests and exploratory factor analysis (EFA).

Findings

EFA established eight key components of important infrastructure procurement skills to include skills related to: project success factors; social and environmental sustainability; marketing and e-procurement; project phase management, the application of procurement laws and procedures; soft skills, ICT and communication; and data analysis and team building.

Originality/value

The findings are crucial in developing infrastructure procurement capacity building programmes that would be appropriate for infrastructure procurement personnel in developing country contexts. Infrastructure procurement personnel ought to engage more in capacity development training that is aligned to enhancing skills within the eight components.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of over 17000