Search results

1 – 10 of 188
Article
Publication date: 9 December 2022

Ying Zhou, Yu Wang, Chenshuang Li, Lieyun Ding and Cong Wang

This study aimed to propose a performance-oriented approach of automatically generative design and optimization of hospital building layouts in consideration of public health…

580

Abstract

Purpose

This study aimed to propose a performance-oriented approach of automatically generative design and optimization of hospital building layouts in consideration of public health emergency, which intended to conduct reasonable layout design of hospital building to meet different performance requirements for both high efficiency during normal periods and low risk in the pandemic.

Design/methodology/approach

The research design follows a sequential mixed methodology. First, key points and parameters of hospital building layout design (HBLD) are analyzed. Then, to meet the requirements of high efficiency and low risk, adjacent preference score and infection risk coefficient are constructed as constraints. On this basis, automatic generative design is conducted to generate building layout schemes. Finally, multi-objective deviation analysis is carried out to obtain the optimal scheme of hospital building layouts.

Findings

Automatic generative design of building layouts that integrates adjacent preferences and infection risks enables hospitals to achieve rapid transitions between normal (high efficiency) and pandemic (low risk) periods, which can effectively respond to public health emergencies. The proposed approach has been verified in an actual project, which can help systematically explore the solution for better decision-making.

Research limitations/implications

The form of building layouts is limited to rectangles, and future work can explore conducting irregular layouts into optimization for the framework of generative design.

Originality/value

The contribution of this paper is the developed approach that can quickly and effectively generate more hospital layout alternatives satisfying high operational efficiency and low infection risk by formulating space design rules, which is of great significance in response to public health emergency.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 May 2022

Ahmad Mohammad Ahmad, Shimaa Abdelkarim, Maryam Al-Nuaimi, Nancy Makhoul, Lizmol Mathew and Shaibu Garba

Globally, there is a growing proportion of disabled people as a result of different circumstances. This growth generates attention and leads to ways to integrate the affected…

Abstract

Purpose

Globally, there is a growing proportion of disabled people as a result of different circumstances. This growth generates attention and leads to ways to integrate the affected population into society. Addressing such disability and integration is particularly important at buildings level, enabling and expanding the scope of activities for people with disabilities (PWDs). The rising number of PWDs and the need to integrate them into society create a need for action to improve their living condition and integration into society. This study aims to examine the issue of accessibility for PWDs in higher education facilities in Qatar.

Design/methodology/approach

Addressing accessibility at buildings level is particularly important in higher education because it enables inclusion in training and education and increases the potential for productive engagement in society. The study aims to develop an objective tool to assess and measure accessibility in educational institutions. Five selected buildings were examined and evaluated at Qatar University based on proximity, multi-use, vertical and horizontal circulation availability. The survey respondents were randomly selected. An existing assessment method was used in surveying respondents, including those with and without disabilities.

Findings

A comparative study was conducted to explore the discrepancy between facility users with and without disability, indicating the gap in existing tools.

Originality/value

The developed tool generates the same outcome when conducted by different assessors, indicating the level of compliance and percentage met as a benefit, not a focus. It allows professionals and non-professionals with minimal experience to conduct the assessment.

Details

Journal of Facilities Management , vol. 22 no. 2
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 2 April 2024

Jhumana Akter, Mobasshira Islam and Shuvo Dip Datta

Determining the suitable material and accurate thickness of the thermal insulation layer used in exterior walls during the design phase of a building can be challenging. This…

Abstract

Purpose

Determining the suitable material and accurate thickness of the thermal insulation layer used in exterior walls during the design phase of a building can be challenging. This study aims to determine suitable material and optimum thickness for the insulation layer considering both operational and embodied factors by a comprehensive assessment of the energy, economic and environmental (3E) parameters.

Design/methodology/approach

First, the energy model of an existing building was created by using Autodesk Revit software according to the as-built floor layout to evaluate the impact of five alternative insulating materials in varying thickness values. Second, using the results derived from the model, a thorough evaluation was conducted to ascertain the optimal insulation material and thickness through individual analysis of 3E factors, followed by a comprehensive analysis considering the three aforementioned factors simultaneously.

Findings

The findings indicated that polyurethane with 13 cm thickness, rockwool with 10 cm thickness and EPS with 20 cm thickness were the best states based on energy consumption, cost and environmental footprint, respectively. After completing the 3E investigation, the 15-cm-thick mineral wool insulation was presented as the ideal state.

Practical implications

This study explores how suitable material and thickness of insulating material can be determined in advance during the design phase of a building, which is a lot more accurate and cost-effective than applying insulating materials by assumed thickness in the construction phase.

Originality/value

To the best of the authors’ knowledge, this paper is unique in investigating the advantages of using thermally insulating materials in the context of a mosque structure, taking into account its distinctive attributes that deviate from those of typical buildings. Furthermore, there has been no prior analysis of the cost and sustainability implications of these materials concerning the characteristics of subtropical monsoon climate.

Details

World Journal of Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 26 December 2023

Hiral Patel and Gabriela Zapata-Lancaster

This paper aims to highlight a broader definition of good building performance that goes beyond the traditional emphasis on technical aspects, only adopting the lens of the social…

Abstract

Purpose

This paper aims to highlight a broader definition of good building performance that goes beyond the traditional emphasis on technical aspects, only adopting the lens of the social construction of technology (SCOT) in the empirical space of the workplace sector. Several building performance evaluation (BPE) methods focus on technical aspects such as energy consumption, indoor environmental conditions and compliance with building regulations and standards. Technical aspects, albeit important goals, only embed a partial component of what buildings are expected to deliver. There is growing interest in considering the organisational and experiential expectations of building performance, particularly integrating various views of performance as expected by different user groups.

Design/methodology/approach

The paper adopts an archival research method to analyse the archive of the workplace consultants DEGW, particularly focusing on their work on London’s Broadgate development in the 1980s and the 1990s.

Findings

The findings reveal how voices from a pluralistic client organisation can be addressed to articulate a broad definition of building performance that integrates different viewpoints encompassing technical, organisational and experiential expectations. In DEGW’s work, the views on building performance of various stakeholders involved in the everyday use and management of buildings are identified without imposing predetermined agendas or research notions of performance. Particular emphasis is given to understanding clients as not a homogenous entity but consisting of different interest groups, which implies multiple conceptualisations of building performance and the building itself.

Research limitations/implications

The performance expectations of a building vary between organisations and even within any organisation. Moreover, the needs of an organisation will change over time, and the BPE criteria need to be changed to ensure better alignment between organisations and the physical spaces they occupy. A critical reflection on the conceptualisation of “users” and “building” in BPE methods is required to create an integrated approach towards building performance.

Originality/value

The paper offers insights by adopting the theoretical lens of SCOT to explore an integrated approach to building performance that captures the varied needs of building users through the example of London’s Broadgate development.

Details

Journal of Corporate Real Estate , vol. 26 no. 1
Type: Research Article
ISSN: 1463-001X

Keywords

Article
Publication date: 1 April 2024

Mohammad Hani Al-Rifai

The purpose of this paper is twofold: first, a case study on applying lean principles in manufacturing operations to redesign and optimize an electronic device assembly process…

Abstract

Purpose

The purpose of this paper is twofold: first, a case study on applying lean principles in manufacturing operations to redesign and optimize an electronic device assembly process and its impact on performance and second, introducing cardboard prototyping as a Kaizen tool offering a novel approach to testing and simulating improvement scenarios.

Design/methodology/approach

The study employs value stream mapping, root cause analysis, and brainstorming tools to identify root causes of poor performance, followed by deploying a Kaizen event to redesign and optimize an electronic device assembly process. Using physical models, bottlenecks and opportunities for improvement were identified by the Kaizen approach at the workstations and assembly lines, enabling the testing of various scenarios and ideas. Changes in lead times, throughput, work in process inventory and assembly performance were analyzed and documented.

Findings

Pre- and post-improvement measures are provided to demonstrate the impact of the Kaizen event on the performance of the assembly cell. The study reveals that implementing lean tools and techniques reduced costs and increased throughput by reducing assembly cycle times, manufacturing lead time, space utilization, labor overtime and work-in-process inventory requirements.

Originality/value

This paper adds a new dimension to applying the Kaizen methodology in manufacturing processes by introducing cardboard prototyping, which offers a novel way of testing and simulating different scenarios for improvement. The paper describes the process implementation in detail, including the techniques and data utilized to improve the process.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 29 December 2023

Kiia Aurora Einola, Laura Remes and Kenneth Dooley

This study aims to explore an emerging collection of smart building technologies, known as smart workplace solutions (SWS), in the context of facilities management (FM).

Abstract

Purpose

This study aims to explore an emerging collection of smart building technologies, known as smart workplace solutions (SWS), in the context of facilities management (FM).

Design/methodology/approach

This study is based on semi-structured interviews with facility managers in Finland, Norway and Sweden who have deployed SWSs in their organizations. SWS features, based on empirical data from a previous study, were also used to further analyse the interviews.

Findings

It analyses the benefits that SWSs bring from the facility management point of view. It is clear that the impetus for change and for deploying SWS in the context of FM is primarily driven by cost savings related to reductions in office space.

Research limitations/implications

This research has been conducted with a focus on office buildings only. However, other building types can learn from the benefits that facility managers receive in the area of user-centred smart buildings.

Practical implications

SWSs are often seen as employee experience solutions that are only related to “soft” elements such as collaboration, innovation and learning. Understanding the FM business case can help make a more practical case for their deployment.

Originality/value

SWSs are an emerging area, and this study has collected data from facility managers who use them daily.

Details

Facilities , vol. 42 no. 15/16
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 25 January 2022

Vigneshkumar Chellappa and Vasundhara Srivastava

Science mapping is an essential application of visualization technology widely used in safety, construction management and environmental science. The purpose of this study was to…

243

Abstract

Purpose

Science mapping is an essential application of visualization technology widely used in safety, construction management and environmental science. The purpose of this study was to explore thermal comfort in residential buildings (TCinRB) research in India, identify research trends using a science mapping approach and provide a perspective for recommending future research in TCinRB.

Design/methodology/approach

This study used the VOSviewer tool to conduct a systematic analysis of the development trend in TCinRB studies in India based on Scopus Index articles published between 2001 and 2020. The annual numbers of articles, geographical locations of studies, major research organizations and authors, and the sources of journals on TCinRB were presented based on the analysis. Then, using co-authorship analysis, the collaborations among the major research groups were reported. Furthermore, research trends on TCinRB studies were visually explored using keyword co-occurrence analysis. The emerging research topics in the TCinRB research community were discovered by analyzing the authors’ keywords.

Findings

The findings revealed that studies had been discovered to pay more attention to north-east India, vernacular architecture, Hyderabad apartments and temperature performance in the past two decades. Thermal adaptation, composite climate, evaporative cooling and clothing insulation are emerging research areas in the TCinRB domain. The findings summarized mainstream research areas based on Indian climatic zones, addressed current TCinRB research gaps and suggested future research directions.

Originality/value

This review is particularly significant because it could help researchers understand the body of knowledge in TCinRB and opens the way for future research to fill an important research gap.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 April 2024

Xiaobo Shi, Yaning Qiao, Xinyu Zhao, Yan Liu, Chenchen Liu, Ruopeng Huang and Yuanlong Cui

Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or…

Abstract

Purpose

Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or terrorist attacks, to reduce passenger injuries or life losses. The emergency evacuation capacity (EEC) of a subway station needs to be revised timely, in case passenger demand increases or the evacuation route changes in the future. However, traditional ways of estimating EEC, e.g. fire drills are time- and resource-consuming and are difficult to revise from time to time. The purpose of this study is to establish an intuitive modelling approach to increase the EEC of subway stations in a stepwised manner.

Design/methodology/approach

This study develops an approach to combine agent-based evacuation modelling and building information modelling (BIM) technology to estimate the total evacuation time of a subway station.

Findings

Evacuation time can be saved (33% in the studied case) from iterative improvements including stopping escalators running against the evacuation flow and modifying the geometry around escalator exits. Such iterative improvements rely on integrating agent-based modelling and BIM.

Originality/value

The agent-based model can provide a more realistic simulation of intelligent individual movements under emergency circumstances and provides precise feedback on locations of evacuation bottlenecks. This study also examined the effectiveness of two rounds of stepwise improvements in terms of operation or design to increase the EEC of the station.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 October 2022

H.P.M.N.L.B. Moragane, B.A.K.S. Perera, Asha Dulanjalie Palihakkara and Biyanka Ekanayake

Construction progress monitoring (CPM) is considered a difficult and tedious task in construction projects, which focuses on identifying discrepancies between the as-built product…

Abstract

Purpose

Construction progress monitoring (CPM) is considered a difficult and tedious task in construction projects, which focuses on identifying discrepancies between the as-built product and the as-planned design. Computer vision (CV) technology is applied to automate the CPM process. However, the synergy between the CV and CPM in literature and industry practice is lacking. This study aims to fulfil this research gap.

Design/methodology/approach

A Delphi qualitative approach was used in this study by conducting two interview rounds. The collected data was analysed using manual content analysis.

Findings

This study identified seven stages of CPM; data acquisition, information retrieval, verification, progress estimation and comparison, visualisation of the results and schedule updating. Factors such as higher accuracy in data, less labourious process, efficiency and near real-time access are some of the significant enablers in instigating CV for CPM. Major challenges identified were occlusions and lighting issues in the site images and lack of support from the management. The challenges can be easily overcome by implementing suitable strategies such as familiarisation of the workforce with CV technology and application of CV research for the construction industry to grow with the technology in line with other industries.

Originality/value

This study addresses the gap pertaining to the synergy between the CV in CPM literature and the industry practice. This research contributes by enabling the construction personnel to identify the shortcomings and the opportunities to apply automated technologies concerning each stage in the progress monitoring process.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 188