Search results

1 – 10 of 178
Open Access
Article
Publication date: 20 March 2017

Tristan Gerrish, Kirti Ruikar, Malcolm Cook, Mark Johnson and Mark Phillip

The purpose of this paper is to present a review of the implications building information modelling (BIM) is having on the building energy modelling (BEM) and design of buildings

9560

Abstract

Purpose

The purpose of this paper is to present a review of the implications building information modelling (BIM) is having on the building energy modelling (BEM) and design of buildings. It addresses the issues surrounding exchange of information throughout the design process, and where BIM may be useful in contributing to effective design progression and information availability.

Design/methodology/approach

Through review of current design procedures and examination of the concurrency between architectural and thermophysical design modelling, a procedure for information generation relevant to design stakeholders is created, and applied to a high-performance building project currently under development.

Findings

The extents of information key to the successful design of a buildings energy performance in relation to its architectural objectives are given, with indication of the level of development required at each stage of the design process.

Practical implications

BIM offers an extensible medium for parametric information storage, and its implementation in design development offers the capability to include BEM parameter-integrated construction information. The extent of information required for accurate BEM at stages of a building’s design is key to understanding how best to record performance information in a BIM environment.

Originality/value

This paper contributes to the discussion around the integration of concurrent design procedures and a common data environment. It presents a framework for the creation and dissemination of information during design, exemplifies this on a real building project and evaluates the barriers experienced in successful implementation.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Book part
Publication date: 1 May 2019

Arturas Kaklauskas, Irene Lill, Dilanthi Amaratunga and Ieva Ubarte

This article’s purpose is to develop The Model for Smart, Self-learning and Adaptive Resilience Building (SARB).

Abstract

Purpose

This article’s purpose is to develop The Model for Smart, Self-learning and Adaptive Resilience Building (SARB).

Design/Methodology/Approach

Products and patents of methods and systems analysis was carried out in the fields of BIM application, Smart, Self-learning and Adaptive Resilience Building. Based on other researchers’ findings, The SARB Model was proposed.

Findings

Analysis of the literature showed that traditional decisions on the informational modelling do not satisfy all the needs of smart building technologies owing to their static nature. The SARB Model was developed to take care of its efficiency from the brief stage to the end of its service life.

Research Limitations/Implications

The SARB Model was developed to take care of its efficiency from the brief stage to the end of its service life. The SARB Model does have some limitations: (1) the processes followed require the collection of much unstructured and semi-structured data from many sources, along with their analyses to support stakeholders in decision-making; (2) stakeholders need to be aware of the broader context of decision-making and (3) the proposal is process-oriented, which can be a disadvantage during the model’s implementation.

Practical Implications

Two directions can be identified for the practical implications of the SARB Model. The initial expectation is the widespread installation of SARB Model within real estate and construction organisations. Furthermore, development of the SARB Model will be used to implement the ERASMUS+ project, “Advancing Skill Creation to ENhance Transformation—ASCENT” Project No. 561712-EPP-1-2015-UK-EPPKA2-CBHE-JP.

Originality/Value

The practical implications of this paper are valuable.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 17 December 2021

Annelise Nairne Schamne, André Nagalli and Alfredo Augusto Vieira Soeiro

The construction sector is increasingly engaged to explore the potential application of building information modelling (BIM) for the sustainability of the buildings. BIM can be…

1923

Abstract

Purpose

The construction sector is increasingly engaged to explore the potential application of building information modelling (BIM) for the sustainability of the buildings. BIM can be applied conjugated to certification methods to evaluate the sustainability of the buildings, and it is known as building sustainability assessment (BSA). This article aims to explore applications of BIM in the sustainability analysis of buildings, including five types of BSA.

Design/methodology/approach

A literature review from 2009 to 2020 considering a combination of search terms related to BIM and BSA complemented the analysis. The bibliometric analysis indicates an increase in the number of publications on this topic of study in the last five years. A peak occurred in 2015 and 2020, with 51 and 66 publications, respectively.

Findings

The results showed that BIM contributes to achieving part of the sustainability requirements from BSA, especially quantitative requirements that are related to material and resources. However, a complete analysis between BIM and BSA is still a challenge since part of BSA's have a lack information in their requirements and BIM softwares present interoperability problems that difficult an integrated analysis to extract information directly from the software to attend BSA's requirements.

Originality/value

The results contribute to analysing the evolution of studies about BIM and to understand the limitation in the applicability with sustainability rating systems. Future directions of research indicate the necessity to improve the use of BIM in the sustainability analysis of the buildings, but with a good perspective regarding the application of BIM in material and resources requirements, and waste management in construction sites.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 30 April 2021

Sepehr Alizadehsalehi and Ibrahim Yitmen

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality…

8762

Abstract

Purpose

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality (RC-to-XR).

Design/methodology/approach

IDEF0 data modeling method has been designed to establish an integration of reality capturing technologies by using BIM, DTs and XR for automated construction progress monitoring. Structural equation modeling (SEM) method has been used to test the proposed hypotheses and develop the skill model to examine the reliability, validity and contribution of the framework to understand the DRX model's effectiveness if implemented in real practice.

Findings

The research findings validate the positive impact and importance of utilizing technology integration in a logical framework such as DRX, which provides trustable, real-time, transparent and digital construction progress monitoring.

Practical implications

DRX system captures accurate, real-time and comprehensive data at construction stage, analyses data and information precisely and quickly, visualizes information and reports in a real scale environment, facilitates information flows and communication, learns from itself, historical data and accessible online data to predict future actions, provides semantic and digitalize construction information with analytical capabilities and optimizes decision-making process.

Originality/value

The research presents a framework of an automated construction progress monitoring system that integrates BIM, various reality capturing technologies, DT and XR technologies (VR, AR and MR), arraying the steps on how these technologies work collaboratively to create, capture, generate, analyze, manage and visualize construction progress data, information and reports.

Details

Smart and Sustainable Built Environment, vol. 12 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Book part
Publication date: 1 May 2019

Kaleem Ullah, Irene Lill and Emlyn Witt

Building Information Modeling (BIM) is a revolutionary innovation in the construction industry to virtually design and mange projects throughout the building lifecycle. Although…

Abstract

Purpose

Building Information Modeling (BIM) is a revolutionary innovation in the construction industry to virtually design and mange projects throughout the building lifecycle. Although Estonia is one of the foremost countries in the Information and Communications Technology (ICT) sector, BIM adoption in the Estonian construction industry is still lagging behind other countries. This paper is part of doctoral research that aims to determine the barriers to BIM adoption and develop a framework for effective implementation of BIM in the Estonian construction industry. The purpose of this paper is to examine the status of BIM adoption, BIM benefits and common barriers to BIM adoption in the construction industry worldwide.

Design/Methodology/Approach

The methodology used in this study is a literature review of journal articles, conference proceedings and published reports from various sources.

Findings

This study showed BIM benefits through building lifecycle phases and explored the BIM adoption rate in the construction industry of various countries. Eighteen barriers to BIM adoption were also identified.

Research Limitations/Implications

The study presented is limited to a literature review – some related literature may have been missed.

Practical Implications

The main practical significance of this study is that the findings can be used to inform a further survey to model the barriers to BIM adoption in the Estonian construction industry.

Originality/Value

This study offers information on BIM adoption in the construction industry and will form the basis of further research.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 13 September 2022

Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…

3858

Abstract

Purpose

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.

Design/methodology/approach

Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.

Findings

The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.

Originality/value

A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 22 February 2022

Solmaz Mansoori, Janne Harkonen and Harri Haapasalo

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization…

2204

Abstract

Purpose

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization concept and product structure (PS).

Design/methodology/approach

The study follows a conceptual research approach in conjunction with a single case study. First, the previous studies on BIM implementation, productization and PS are reviewed. Further, a case study is used to analyse the current state of productization in the construction sector and develop a functional PS for construction.

Findings

A Part-Phase-Elements Matrix is proposed as a construction-specific PS to facilitate consistency in information and to enhance BIM. The proposed matrix provides new avenues to facilitate consistent information exchange through the interconnection between conceptual PS and standard building objects library, and encourage collaborative communication between stakeholders.

Originality/value

This study explores the core of the productization concept and PS as means to facilitate consistency of information and thus address the current gaps in BIM. This as building projects progressively move towards systematic modular and prefabricated construction where the flow of reliable information about product and construction offerings becomes increasingly important.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 30 September 2022

James Olaonipekun Toyin and Modupe Cecilia Mewomo

The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies…

2157

Abstract

Purpose

The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies revealed a low level of BIM implementation in the context of the Nigerian construction sector. Moreover, previous studies have established that BIM application comes with its share of various barriers. Therefore, this study aims to carry out an on-site survey on barriers to the application of BIM on construction sites in the Nigerian construction industry.

Design/methodology/approach

An extensive review of literature on BIM barriers was conducted, from where 33 factors were identified as significant BIM barriers peculiar to the developing countries. A questionnaire was developed and distributed to the targeted respondents, who are practicing professionals in the Nigerian construction industry, based on the identified barriers. The data collected were analysed by using both descriptive and inferential statistics.

Findings

The principal component analysis revealed that 27 barriers were peculiar to the Nigerian construction industry. The “lack of familiarity with BIM capacity, habitual resistance to change from the traditional style of design and build, and poor awareness of BIM benefit” were identified as the three most critical barriers hindering BIM application on construction sites in the Nigerian construction industry.

Practical implications

This study reveals key information on the peculiar barriers to BIM application in the Nigerian construction industry. The avoidance of these barriers will not only assist various construction stakeholders in the successful implementation of BIM application on a construction project but also promote information management systems and productivity within the construction industry to a great extent. These will further improve post-construction activities.

Originality/value

This study provides a substantial understanding of BIM state of the art in the context of barriers hindering BIM application on construction sites in the Nigerian construction industry.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 13 August 2021

Juliana Parise Baldauf, Carlos Torres Formoso and Patricia Tzortzopoulos

This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount…

2428

Abstract

Purpose

This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount of requirements information, in order to deal with a diversity of clients and frequents changes in healthcare services. The proposed method supports healthcare design by adopting a process-based approach for client requirements management, with the aim of improving value generation.

Design/methodology/approach

Design Science Research was the methodological approach adopted in this investigation. The main outcome of this study emerged from an empirical study carried out in a healthcare project in Brazil.

Findings

The proposed method involves three stages: (1) capturing and processing requirements; (2) product and requirements modelling, which involves the connection between requirements and the BIM 3-D model and (3) supporting design solution refinement, through the communication of requirements and the assessment of design in relation to updated client requirements information.

Originality/value

This study explores client requirements management from a process perspective, proposing activities and their interdependences and possible sources of data, including healthcare services information. The main theoretical contributions are related to the understanding of the nature and complexity of the information involved in client requirements management, and how this can be modelled.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 178