Article
Publication date: 26 January 2023

Afiqah R. Radzi, Nur Farhana Azmi, Syahrul Nizam Kamaruzzaman, Rahimi A. Rahman and Eleni Papadonikolaki

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result…

Abstract

Purpose

Digital twin (DT) and building information modeling (BIM) are interconnected in some ways. However, there has been some misconception about how DT differs from BIM. As a result, industry professionals reject DT even in BIM-based construction projects due to reluctance to innovate. Furthermore, researchers have repeatedly developed tools and techniques with the same goals using DT and BIM to assist practitioners in construction projects. Therefore, this study aims to assist industry professionals and researchers in understanding the relationship between DT and BIM and synthesize existing works on DT and BIM.

Design/methodology/approach

A systematic review was conducted on published articles related to DT and BIM. A total record of 54 journal articles were identified and analyzed.

Findings

The analysis of the selected journal articles revealed four types of relationships between DT and BIM: BIM is a subset of DT, DT is a subset of BIM, BIM is DT, and no relationship between BIM and DT. The existing research on DT and BIM in construction projects targets improvements in five areas: planning, design, construction, operations and maintenance, and decommissioning. In addition, several areas have emerged, such as developing geo-referencing approaches for infrastructure projects, applying the proposed methodology to other construction geometries and creating 3D visualization using color schemes.

Originality/value

This study contributed to the existing body of knowledge by overviewing existing research related to DT and BIM in construction projects. Also, it reveals research gaps in the body of knowledge to point out directions for future research.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 5 September 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan

Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still…

Abstract

Purpose

Though alternative building technologies (ABTs) have been encouraged to address accessible and affordable issues in low-cost housing (LCH) provision, their adoption is still overwhelmed with encumbrances. The encumbrances that hinder ABT adoption require an in-depth study, especially in developing countries like Nigeria. However, studies regarding ABT and its role in improving Nigeria's LCH to achieve Sustainable Development Goal (SDG) 11 are scarce. This research investigates encumbrances to ABT adoption in Nigeria's LCH provision and suggests feasible measures to prevent or reduce the encumbrances, thereby improving achieving SDG 11 (sustainable cities and communities).

Design/methodology/approach

This research utilised qualitative research and adopted a face-to-face interview as the primary data collection. The interviewees comprised ABT practitioners and end users in Nigeria who were chosen by a convenient sampling technique. The study's data were analysed manually through a thematic approach.

Findings

This study shows that stakeholders should embrace ABT in LCH provision to improve achieving SDG 11 in Nigeria. Also, it clustered the perceived 20 encumbrances to ABT adoption in LCH provision into government/policymaker, housing developers/building contractors, ABT users and ABT manufacturers-related issues in Nigeria's context. This study suggested mechanisms to mitigate encumbrances to ABT adoption in LCH provision, thereby improving achieving SDG 11.

Originality/value

This research adds to the limited literature by analysing ABT adoption encumbrances in Nigeria's LCH provision, which could assist policy formulation for the uptake of ABT in LCH provision and improve achieving Goal 11.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 October 2022

Arka Ghosh, Jemal Abawajy and Morshed Chowdhury

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the…

Abstract

Purpose

This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the effective utilisation of emergent digital technologies and a need for a managerial shift for its smooth adoption.

Design/methodology/approach

A total of 3,046 peer-reviewed journal review articles covering Internet of Things (IoT), blockchain, building information modelling (BIM) and digital technologies within the construction sector were reviewed using scientometric mapping and weighted mind-map analysis techniques.

Findings

Prominent research clusters identified were: practice-factor-strategy, system, sustainability, BIM and construction worker safety. Leading countries, authors, institutions and their collaborative networks were identified with the UK, the USA, China and Australia leading this field of research. A conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Originality/value

The study traces the origins of the initial application of Industry 4.0 concepts in the construction field and reviews available literature from 1983 to 2021. It raises awareness of the latest developments and potential landscape realignment of the construction industry through digital technologies conceptual framework for an IoT-based concrete lifecycle quality control system is provided.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 21 November 2022

Babar Ali, Ajibade A. Aibinu and Vidal Paton-Cole

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and…

Abstract

Purpose

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and synthesize the contributions of previous research undertaken in this area and propose future directions for improving the process of delay and disruption claims.

Design/methodology/approach

This study adopted a holistic systematic review of literature following Preferred Reporting Items for Systematic Reviews and Meta-Analysis guidelines. A total of 230 articles were shortlisted related to delay and disruption claims in construction using Scopus and Web of Science databases.

Findings

Six research themes were identified and critically reviewed including delay analysis, disruption analysis, claim management, contract administration, dispute resolution and delay and disruption information and records. The systematic review showed that there is a dearth of research on managing the wide-ranging information required for delay and disruption claims, ensuring the transparency and uniformity in delay and disruption claims’ information and adopting an end-user’s centred research approach for resolving the problems in the process of delay and disruption claims.

Practical implications

Complexities in delay and disruption claims are real-world problems faced by industry practitioners. The findings will help the research community and industry practitioners to prioritize their energies toward information management of delay and disruption claims.

Originality/value

This study contributes to the body of knowledge in delay and disruption claims by identifying the need for conducting more research on its information requirements and management. Subsequently, it provides an insight on the use of modern technologies such as drones, building information modeling, radio frequency identifiers, blockchain, Bigdata and machine learning, as tools for more structured and efficient attainment of required information in a transparent and consistent manner. It also recommends greater use of design science research approach for delay and disruption claims. This will help to ensure delay and disruption claims are the least complex and less dispute-prone process.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 1 September 2022

Oluseyi Julius Adebowale and Justus Ngala Agumba

Despite the significance of the construction industry to the nation's economic growth, there is empirical evidence that the sector is lagging behind other industries in terms of…

4012

Abstract

Purpose

Despite the significance of the construction industry to the nation's economic growth, there is empirical evidence that the sector is lagging behind other industries in terms of productivity growth. The need for improvements inspired the industry's stakeholders to consider using emerging technologies that support the enhancement. This research aims to report augmented reality applications essential for contractors' productivity improvement.

Design/methodology/approach

This study systematically reviewed academic journals. The selection of journal articles entailed searching Scopus and Web of Science databases. Relevant articles for reviews were identified and screened. Content analysis was used to classify key applications into six categories. The research results were limited to journal articles published between 2010 and 2021.

Findings

Augmented reality can improve construction productivity through its applications in assembly, training and education, monitoring and controlling, interdisciplinary function, health and safety and design information.

Originality/value

The research provides a direction for contractors on key augmented reality applications they can leverage to improve their organisations' productivity.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 16 April 2024

Fathima Sabrina Nazeer, Imriyas Kamardeen and Abid Hasan

Many buildings fail to meet user expectations, causing a performance gap. Pre-occupancy evaluation (PrOE) is believed to have the potential to close the gap. It enables designers…

Abstract

Purpose

Many buildings fail to meet user expectations, causing a performance gap. Pre-occupancy evaluation (PrOE) is believed to have the potential to close the gap. It enables designers to obtain end-user feedback in the design phase and improve the design for better performance. However, PrOE implementation faces challenges due to still maturing knowledgebase. This study aims to understand the state-of-the-art knowledge of PrOE, thereby identifying future research needs to advance the domain.

Design/methodology/approach

A systematic literature review following the Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) framework was conducted. A thorough search in five databases and Google Scholar retrieved 90 articles, with 30 selected for systematic review after eliminating duplicates and irrelevant articles. Bibliometric analyses were performed using VOSviewer and Biblioshiny on the article metadata, and thematic analyses were conducted on their contents.

Findings

PrOE is a vehicle for engaging building end-users in the design phase to address the credibility gap caused by the discrepancies between the expected and actual performance of buildings. PrOE has gained limited applications in healthcare, residential, office and educational building design for two broad purposes: design management and marketing. Using virtual reality technologies for PrOE has demonstrated significant benefits. Yet, the PrOE domain needs to mature in multiple perspectives to serve its intended purpose effectively.

Originality/value

This study identifies four knowledge gaps for future research to advance the PrOE domain: (1) developing a holistic PrOE framework, integrating comprehensive performance evaluation criteria, useable at different stages of the design phase and multi-criteria decision algorithms, (2) developing a mixed reality tool, embodying the holistic PrOE framework, (3) formulating a PrOE framework for adaptive reuse of buildings and (4) managing uncertainties in user requirements during the lifecycle in PrOE decisions.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 21 March 2023

Matthew Ikuabe, Clinton Ohis Aigbavboa, Chimay Anumba and Ayodeji Emmanuel Oke

The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS)…

1126

Abstract

Purpose

The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS). The system’s high computational capabilities can aid in the abatement of some of the challenges plaguing FM functions. However, the requisite ingredients for the uptake of the system for FM have still not gained scholarly attention. Because performance measurement is a vital index in determining the outcome of FM methods, this study aims to investigate the influence of performance measurement indicators that are influential to the uptake of CPS for delivering FM functions.

Design/methodology/approach

A qualitative technique was adopted using the Delphi technique. The panel of experts for the study was selected through a well-defined process based on stipulated criteria. The experts gave their opinions in two rounds before consensus was attained on the identified performance measurement indicators, whereas methods of data analysis were measures of central tendency, inter-quartile deviation and Mann–Whitney U test.

Findings

Results from this study showed that 11 of the performance indicators were of very high significance in the determination of the uptake of CPS for FM functions, whereas 5 of the indicators were proven to be of high significance. Furthermore, there was no statistical difference in the opinions of the experts based on their affiliation with academic institutions and professional practice.

Practical implications

The findings of this study contribute practically by aiding policymakers, facility managers and relevant stakeholders with the vital knowledge of delivery mandates for efficient FM services that can spur the uptake of digital technologies such as CPS.

Originality/value

This study contributes to the body of knowledge as it unveils a roadmap of the expected performance output and its accompanying evaluation that would drive the adoption of a promising technology such as CPS in the delivery of FM tasks.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 14 February 2022

Salma Husna Zamani, Rahimi A. Rahman, Muhammad Ashraf Fauzi and Liyana Mohamed Yusof

Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness…

Abstract

Purpose

Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness of the GPRS has not been assessed. Therefore, this study aims to investigate the interrelationships between GPRS and AEC enterprises. To achieve that aim, the study objectives are to compare GPRS effectiveness between small-medium and large AEC enterprises, develop groupings to categorize interrelated GPRS and evaluate the effectiveness of the GPRS and interrelated constructs.

Design/methodology/approach

A systematic literature review and semi-structured interviews with 40 AEC industry professionals were carried out, generating 22 GPRS. Then, questionnaire survey data was collected among AEC professionals. In total, 114 valid survey answers were received and analyzed using the Kruskal–Wallis H test, normalized mean analysis, factor analysis and fuzzy synthetic evaluation.

Findings

Small-medium enterprises have four distinct critical GPRS: “form a special task force to provide support in maneuvering COVID-19,” “provide infrastructure investment budgets to local governments,” “develop employee assistance programs that fit all types of working groups” and “diversify existing supply chain.” Large enterprises have two distinct critical GPRS: “provide help in digitalizing existing construction projects” and “mandate COVID-19 as force majeure.” Eighteen GPRS can be categorized into the following five constructs: “market stability and financial aid,” “enterprise capability management,” “supply chain improvement,” “law and policy resources” and “information and workforce management.” The former two constructs are more effective than other GPRS constructs.

Originality/value

This is the first paper that evaluates the effectiveness of GPRS for AEC enterprises, providing new evidence to policymakers for well-informed decision-making in developing pandemic response strategies.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 17 February 2023

Hugo Martinelli Watanuki and Renato de Oliveira Moraes

The purpose of this paper is to identify the practices that owners of public profiles in social networking sites can leverage to actively build online reputation and to evaluate…

Abstract

Purpose

The purpose of this paper is to identify the practices that owners of public profiles in social networking sites can leverage to actively build online reputation and to evaluate the impact of the adoption of such practices on the initial formation of trust toward these individuals when they are presented as new virtual work partners.

Design/methodology/approach

A theoretical model was developed and an experiment with 233 participants was utilized to assess the model using partial least squares structural equation modeling.

Findings

The results suggest that individuals can build their online reputations in public profiles of social networking sites via a series of practices of self-disclosure of information and that the adoption of these practices has significant effects on the initial formation of trust toward the profile owner in virtual work contexts. Categorization mechanisms such as stereotyping, unit grouping and reputation categorization have been found to contribute to the initial formation of trust, both from an affect and cognition-based perspectives.

Originality/value

Little is known about the information disclosure practices in public profiles of social networking sites that new work partners can adopt to facilitate the formation of trust between them before they start working together. This study has contributed to the existing body of literature by clarifying these practices and the relative importance of online reputation to the initial formation of trust during the outset of a new virtual work relationship.

Details

Aslib Journal of Information Management, vol. 76 no. 3
Type: Research Article
ISSN: 2050-3806

Keywords

Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

1 – 10 of over 1000