Article
Publication date: 6 October 2022

Ahmed Gouda Mohamed and Amr Mousa

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building…

Abstract

Purpose

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building components while monitoring and consistently recording numerous components’ functions throughout its lifecycle, especially in Egypt. This research paper aims to develop an integrated as-is BIM-facility management (FM) information model for the existing building’s components via a case study, depicting a repository for historical data and knowledge amassed from inspections and conveying maintenance decisions automatically during the FM practices.

Design/methodology/approach

The developed approach pursues four successive steps: data acquisition and processing of building components; components recognition from point clouds; modelling scanned point clouds; and quick response code information transfer to BIM components.

Findings

The proposed approach incorporates the as-is BIM with the building components’ as-is FM information to portray a repository for historical data and knowledge collected from inspections to proactively benefit facility managers in simplifying, expediting and enhancing maintenance decisions automatically during FM practices.

Originality/value

This paper presents a digital alternative to manual maintenance recordkeeping concerning building components to retrieve their as-is and historical data using a case study in Egypt. This paper proposes a broad scan to as-is information BIM approach for the existing building’s components to condone maintenance interventions using a versatile, affordable, readily available and multi-functional method for scanning the building’s components using a handheld tool.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 26 January 2022

The-Quan Nguyen, Eric C.W. Lou and Bao Ngoc Nguyen

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers…

Abstract

Purpose

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers for the following questions: (1) When to start the QTO processes to facilitate the contract progress payments? (2) What information is required to measure the quantity of works to estimate contract progress payment (3) What are the challenges to manage (i.e. create, store, update and exploit)? What are the required information for this BIM use? and (4) How to process the information to deliver BIM-based QTO to facilitate contract progress payment?

Design/methodology/approach

The paper applied a deductive approach and expert consensus through a Delphi procedure to adapt to current innovation around BIM-based QTO. Starting with a literature review, it then discusses current practices in BIM-based QTO in general and high-rise building projects in particular. Challenges were compiled from the previous studies for references for BIM-based QTO to facilitate contract progress payment for high-rise building projects in Vietnam. A framework was developed considering a standard information management process throughout the construction lifecycle, when the BIM use of this study is delivered. The framework was validated with Delphi technique.

Findings

Four major challenges for BIM-based QTO discovered: new types of information required for the BIM model, changes and updates as projects progress, low interoperability between BIM model and estimation software, potentiality of low productivity and accuracy in data entry. Required information for QTO to facilitate progress payments in high-rise building projects include Object Geometric/Appearance Information, Structural Components' Definition and Contextual Information. Trade-offs between “Speed – Level of Detail–Applicable Breadth” and “Quality – Productivity” are proposed to consider the information amount to input at a time when creating/updating BIM objects. Interoperability check needed for creating, authoring/updating processing the BIM model's objects.

Research limitations/implications

This paper is not flawless. The first limitation lies in that the theoretical framework was established only based on desk research and small number of expert judgment. Further primary data collection would be needed to determine exactly how the framework underlies widespread practices. Secondly, this study only discussed the quantity take-off specifically for contract progress payment, but not for other purposes or broader BIM uses. Further research in this field would be of great help in developing a standard protocol for automatic quantity surveying system in Vietnam.

Originality/value

A new theoretical framework for BIM-based QTO validated with Delphi technique to facilitate progress payments for high-rise building projects, considering all information management stages and the phases of information development in the project lifecycle. The framework identified four types of information required for this QTO, detailed considerations for strategies (Library Objects Development, BIM Objects Information Declaration, BIM-based QTO) for better managing the information for this BIM use. Two trade-offs of “Speed – LOD–Applicable Breadth” and “Quality – Productivity” have been proposed for facilitating the strategies and also for enhancing the total efficiency and effectiveness of the QTO process.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 15 December 2022

Andrea Parisi Kern, Fabiana Pires Rosa and Luis Bragança

Facility management (FM) is regarded as an emerging issue in civil engineering and is responsible for ensuring the building's expected performance. The purpose of this study is to…

Abstract

Purpose

Facility management (FM) is regarded as an emerging issue in civil engineering and is responsible for ensuring the building's expected performance. The purpose of this study is to analyze buildings' current FM processes for educational and high residential segments and propose an FM-building information modeling (BIM) (BIM6D) to understand the information flow and leading players with and without FM-BIM integration.

Design/methodology/approach

The research strategy was a case study with data from the FM process of two buildings. This study was carried out in three stages: diagnosis of FM of the two buildings, FM-BIM integration and information flow and leading players analysis. Maintenance activities were categorized according to periodicity and status criteria for each project element for FM-BIM integration and were visualized in the Revit design using Dynamo software.

Findings

The results of this study show differences in how FM is conducted, especially in formalization and preventive character, and similarities regarding the difficulty of foreseen and lack of control because of scattered, disconnected and incomplete information on both. The visual appeal of the FM-BIM integration facilitates information access. It optimizes the use of the digital model through the most prolonged phase of the life cycle of a building (post-occupation phase). However, FM-BIM challenges buildings that do not have digital model expertise as residential segments. This study suggests a more significant role for construction companies in these cases.

Originality/value

This study investigates BIM-FM integration of buildings in two different contexts and reveals the importance of a construction company's role in buildings in the residential segment. This study contributes with real-life cases on BIM in existing buildings, discussing the value and challenges of BIM in FM applications.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 29 March 2024

Sihao Li, Jiali Wang and Zhao Xu

The compliance checking of Building Information Modeling (BIM) models is crucial throughout the lifecycle of construction. The increasing amount and complexity of information…

Abstract

Purpose

The compliance checking of Building Information Modeling (BIM) models is crucial throughout the lifecycle of construction. The increasing amount and complexity of information carried by BIM models have made compliance checking more challenging, and manual methods are prone to errors. Therefore, this study aims to propose an integrative conceptual framework for automated compliance checking of BIM models, allowing for the identification of errors within BIM models.

Design/methodology/approach

This study first analyzed the typical building standards in the field of architecture and fire protection, and then the ontology of these elements is developed. Based on this, a building standard corpus is built, and deep learning models are trained to automatically label the building standard texts. The Neo4j is utilized for knowledge graph construction and storage, and a data extraction method based on the Dynamo is designed to obtain checking data files. After that, a matching algorithm is devised to express the logical rules of knowledge graph triples, resulting in automated compliance checking for BIM models.

Findings

Case validation results showed that this theoretical framework can achieve the automatic construction of domain knowledge graphs and automatic checking of BIM model compliance. Compared with traditional methods, this method has a higher degree of automation and portability.

Originality/value

This study introduces knowledge graphs and natural language processing technology into the field of BIM model checking and completes the automated process of constructing domain knowledge graphs and checking BIM model data. The validation of its functionality and usability through two case studies on a self-developed BIM checking platform.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Chukwuka Christian Ohueri, San Chuin Liew, Jibril Adewale Bamgbade and Wallace Imoudu Enegbuma

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to…

Abstract

Purpose

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to significantly enhance multidiscipline team collaboration. However, the practical execution of green BIM is characterized by issues such as duplication of work, information silos and poor cross-party coordination. Besides, there are limited studies on the specific components that are critical to driving green BIM collaborative design. This study aims to establish the critical components of green BIM collaborative design to enable the multidiscipline team to effectively use diverse software to collaboratively exchange accurate information, thus ensuring informed decision-making in the sustainable building design process.

Design/methodology/approach

Data were obtained by using a questionnaire to survey 360 respondents comprising mainly architects and engineers (civil, mechanical and electrical) in Malaysia. Subsequently, data were analyzed via confirmatory factor analysis. Afterward, a measurement model was established and used to test the 11 hypotheses of this study.

Findings

A covariance-based structural equation model of the critical components for successful BIM-based sustainable building design collaboration was established.

Practical implications

The research findings will guide the multidisciplinary team to collaboratively exchange accurate information in green BIM practices.

Originality/value

To the best of the authors’ knowledge, this research is the first attempt in the literature to provide a pragmatic approach for practitioners to combine the established critical components of green BIM to collaboratively exchange heterogeneous sustainability criteria and efficiently design buildings with high sustainability performance, particularly in emerging countries like Malaysia.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 8 June 2023

Sobah Abbas Petersen, Tor Åsmund Evjen and John Krogstie

The main aim of this paper is to describe the potential benefits of enterprise building information models (EBIMs) for health-care institutions. The main research question…

Abstract

Purpose

The main aim of this paper is to describe the potential benefits of enterprise building information models (EBIMs) for health-care institutions. The main research question addressed is how data from EBIM could be leveraged to create value for hospitals beyond design, construction and traditional facility management.

Design/methodology/approach

Three different prototypes, which use different technologies in combination with EBIM, are described to illustrate different uses of EBIM within the context of a hospital and health-care operations. The case study approach has been used to present the prototypes.

Findings

EBIM data, in combination with other data sources, increases the potential benefits of the data with respect to many health-care-related processes, during the operation of a health-care institution. The benefits of EBIM span beyond the design and construction life cycle phases of a hospital and provide value to a variety of stakeholders in multiple health-care-related processes.

Research limitations/implications

The main limitation of this work is the limited sources of data and information such as the specific methods that were used in the design and development of each of the prototypes and a deeper insight into the design rationale and decisions. Another limitation of this paper is that the findings have not been validated.

Practical implications

This study demonstrates the value of convergence of a number of technologies such as EBIM, data and different types of technologies, throughout the life cycle of a building. This study also highlights the value of building information models (BIMs) data for supporting the design of novel educational and other types of application areas. The practical implications include the value for multiple stakeholders, such as resources planning, fleet and equipment management and contract negotiation. Benefits identified for resource planning can have strategic and financial implications at the management level. For patients, visitors and health-care personnel, there may be reduced infections, cleaner and pleasant facilities as well as a reduction of time to find relevant resources.

Social implications

Social implications" could be replaced by "For patients, visitors and health-care personnel, there may be cleaner and pleasant facilities and easy navigation support through the hospital. Furthermore, enhanced access to knowledge and information about the artefact and assets in the hospital can enhance learning and knowledge sharing.

Originality/value

This study identifies the lack of research in using BIM with other data for value-added services for multiple stakeholders in the operations phase of a hospital and addresses that research gap.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 15 February 2023

Sochea Khan, Kriengsak Panuwatwanich and Sasiporn Usanavasin

This paper presents a developed BIMxAR application, an integration of building information modeling (BIM) with augmented reality (AR) linked with real-time online database to…

Abstract

Purpose

This paper presents a developed BIMxAR application, an integration of building information modeling (BIM) with augmented reality (AR) linked with real-time online database to support the building facility management work. The primary aim of this research was to develop and empirically examine the applicability of a BIM-based AR (BIMxAR) application in building facility management.

Design/methodology/approach

The BIMxAR application was developed and experimented with maintenance work of a university laboratory building. The experiment consisted of a comparison of supportive maintenance tasks performed using the traditional approach and the BIMxAR approach by 38 university students. The time taken to complete each task was recorded and analyzed using statistical analyses to compare the performance between the tasks completed using each approach.

Findings

The results indicated that the group using the BIMxAR application approach completed the tasks correctly in a significantly shorter time compared to that using the traditional approach. The findings supported the applicability of the developed BIMxAR application and the improvement of the building facility management tasks when using the proposed approach.

Originality/value

This paper presents a methodological approach in developing a mobile application that integrates BIM with AR for facility management work, leveraging real-time information exchange through a cloud-based platform. The paper also provides empirical evidence that demonstrates how the integration between BIM and AR could be achieved and implemented to help facilitate building maintenance tasks.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 January 2024

Kenneth Lawani, Farhad Sadeghineko, Michael Tong and Mehmethan Bayraktar

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D…

68

Abstract

Purpose

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D laser scanning technologies. This case study integrated 3D laser point cloud scans with BIM to explore the effects of BIM adoption on ongoing construction project, whilst evaluating the utility of 3D laser scanning technology for producing structural 3D models by converting point cloud data (PCD) into BIM.

Design/methodology/approach

The primary data acquisition adopted the use of Trimble X7 laser scanning process, which is a set of data points in the scanned space that represent the scanned structure. The implementation of BIM with the 3D PCD to explore the precision and effectiveness of the construction processes as well as the as-built condition of a structure was precisely captured using the 3D laser scanning technology to recreate accurate and exact 3D models capable of being used to find and fix problems during construction.

Findings

The findings indicate that the integration of BIM and 3D laser scanning technology has the tendency to mitigate issues such as building rework, improved project completion times, reduced project cost, enhanced interdisciplinary communication, cooperation and collaboration amongst the project duty holders, which ultimately enhances the overall efficiency of the construction project.

Research limitations/implications

The acquisition of data using 3D laser scanner is usually conducted from the ground. Therefore, certain aspects of the building could potentially disturb data acquisition; for example, the gable and sections of eaves (fascia and soffit) could be left in a blind spot. Data acquisition using 3D laser scanner technology takes time, and the processing of the vast amount of data acquired is laborious, and if not carefully analysed, could result in errors in generated models. Furthermore, because this was an ongoing construction project, material stockpiling and planned construction works obstructed and delayed the seamless capture of scanned data points.

Originality/value

These findings highlight the significance of integrating BIM and 3D laser scanning technology in the construction process and emphasise the value of advanced data collection methods for effectively managing construction projects and streamlined workflows.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 11 August 2023

Charles Frommweiler and Erik Poirier

The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the…

Abstract

Purpose

The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the use of building information modeling (BIM) in the commissioning phase of building equipment and systems could be beneficial, few studies have investigated the processes behind its implementation. The research presented in this paper aims to investigate the implementation of BIM for the commissioning phase within a general contracting company through action-research.

Design/methodology/approach

Through direct involvement with the research partner, a large general contractor, a diagnosis on the current limitations of the commissioning process was conducted. An action plan to implement BIM for commissioning was developed and implemented in two pilot projects. Evaluation was performed through on-site observations and informal discussions with field staff. Learning was specified through the development of a formal protocol for BIM-enabled BCx.

Findings

This action-research project helped the partner organization identify the challenges and a way forward to formalize its BIM-enabled BCx process. The action plan aimed at countering the lack of knowledge about the status of equipment and system commissioning as well as the lack of standardization. The research team co-developed and tested a formal protocol, including BIM-enabled processes and technologies to address these observed problems. A complete implementation ecosystem was structured and deployed. Preliminary feedback indicated that improvements were obtained using a BIM-enabled approach over a traditional approach.

Originality/value

While past studies have investigated the BCx process, this study identified current challenges considering recent advances in BIM and focused on a large general contractor. This work provides an in-depth account of a large general contractor attempting to streamline its BCx process. The results of the study could help guide practitioners in implementing more streamlined BIM-enabled BCx processes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 June 2023

Abdelrahman M. Farouk and Rahimi A. Rahman

Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study…

Abstract

Purpose

Implementing building information modeling (BIM) in construction projects offers many benefits. However, the use of BIM in project cost management is still limited. This study aims to review the current trends in the application of BIM in project cost management.

Design/methodology/approach

This study systematically reviews the literature on the application of BIM in project cost management. A total of 46 related articles were identified and analyzed using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses method.

Findings

Eighteen approaches to applying BIM in project cost management were identified. The approaches can be grouped into cost control and cost estimation. Also, BIM can be applied independently or integrated with other techniques. The integrated approaches for cost control include integration with genetic algorithms, Monte Carlo simulation, lean construction, integrated project delivery, neural network and value engineering. On the contrary, integrated approaches for cost estimation include integration with cost-plus pricing, discrepancy analysis, construction progress curves, estimation standards, algorithms, declarative mappings, life cycle sustainability assessment, ontology, Web-based frameworks and structured query language.

Originality/value

To the best of the authors’ knowledge, this study is the first to systematically review prior literature on the application of BIM in project cost management. As a result, the study provides a comprehensive understanding of the current state of the art and fills the literature gap. Researchers and industry professionals can use the study findings to increase the benefits of implementing BIM in construction projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords