Article
Publication date: 4 March 2024

Janet Chang, Klaudia Jaskula, Eleni Papadonikolaki, Dimitrios Rovas and Ajith Kumar Parlikad

This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction…

Abstract

Purpose

This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction phase. The significance of effective management of handover information is highlighted by global building failures, such as the Grenfell Tower fire in London, UK. Despite existing technological interventions, there remains a paucity of understanding regarding the factors contributing to the decline in the quality of handover information during the post-construction phase.

Design/methodology/approach

This study employed a multi-case studies approach across five higher education institutions. It involved conducting semi-structured interviews with 52 asset management professionals, uncovering the underlying reasons for the decline in handover information quality. Building on these insights, the study performed a mapping exercise to align these identified factors with blockchain technology features and information quality dimensions, aiming to evaluate blockchain’s potential in managing quality handover information.

Findings

The study findings suggest that blockchain technology offers advantages but has limitations in addressing all the identified quality issues of managing handover information. Due to the lack of an automated process and file-based information exchange, updating handover information still requires an error-prone manual process, leading to potential information loss. Additionally, no solutions are available for encoding drawings for updates and validation.

Originality/value

This study proposes a framework integrating blockchain to enhance the information management process and improve handover information quality.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 5 February 2024

Azzam Raslan, Ali Cheshmehzangi, Dave Towey, Walid Tizani and Georgios Kapogiannis

Currently, owners find it difficult to manage their assets throughout their project life cycle. The fact that asset information models (AIMs) are mandatory as deliverables for…

Abstract

Purpose

Currently, owners find it difficult to manage their assets throughout their project life cycle. The fact that asset information models (AIMs) are mandatory as deliverables for building information modeling-driven projects makes it a key requirement for the client to understand in detail those factors affecting asset operation. Hence, because the Kingdom of Saudi Arabia is the most significant market in the Middle East, this study aims to investigate those factors where blockchain and AIMs could impact the asset management (AM) life cycle.

Design/methodology/approach

Researchers used a hypothesis-based approach over a systematic literature review and a workshop (descriptive statistics) to understand the current challenges in AM. Later, a second workshop was run to understand the impact factor analysis affecting the operation of the asset life cycle by using asset information modeling and blockchain technology over a multiquantitative method.

Findings

Results found that factors affecting the operation of assets could be the improvement of trust and stakeholder’s influences; the availability of handover process products’ accurate data; manufacturers providing detailed product models; increasing the speed of preparing holistic and integrated AM systems; improving collaboration between stakeholders; and returning clients’ investments faster.

Originality/value

Understanding the factors affecting AM life cycle based on the utilization of AIMs and blockchain then allows investors and their team members to work in a secure and collaborative environment that helps them to pre-identify certain risks and improve decision-making in a more effective way, as is required by ISO55000.

Details

Construction Innovation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 March 2024

Lama Abu Alieh, M. Reza Hosseini, Igor Martek, Wei Wu and Mehrdad Arashpour

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction…

Abstract

Purpose

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction industry. In response, Australian universities have tried to integrate the teaching of BIM into construction-related curricula, but with limited success. The acknowledged impediment is the lingering mismatch between what universities offer and what industry actually needs. However, the exact nature of that mismatch has yet to be identified. This study addresses that knowledge gap. It assesses both the current status of BIM competencies among university graduates and explores how BIM education at Australian universities may be improved to deliver BIM work readiness, as required by the industry.

Design/methodology/approach

This paper employed a qualitative research approach, utilizing 17 semi-structured interviews with experts in the Australian BIM industry. The Person-Organization (PO) fit theory, which emphasizes the congruence between individual and organizational characteristics, was utilized as a theoretical framework to examine the compatibility between “demand” and “ability” perspectives. The resulting data were analysed using this theoretical framework to gain insights into the PO fit perspectives in relation to BIM industry practices.

Findings

Findings reveal that graduates are generally competent regarding the use of BIM software. However, employers require much more than software skills, and expect recruits to have the capability to implement BIM as a process according to information management standards. Specifically, graduates are significantly deficient in matters of BIM protocols, collaboration and coordination, information workflows as well as completion and handover procedures.

Originality/value

This study is the first of its kind that bridges the gap between industry expectations and university education, in the Australian context, moving beyond the common discourse in education literature, which is exclusively focused on assessing students’ perceptions about BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 September 2023

Beatriz Campos Fialho, Ricardo Codinhoto and Márcio Minto Fabricio

Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and…

Abstract

Purpose

Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and maintenance. Nevertheless, reactive maintenance (RM) services are characterised by delays, waste and difficulties in prioritising services and identifying the root causes of failures; this is mostly caused by inefficient asset information and communication management. While linking building information modelling and the Internet of Things through a digital twin has demonstrated potential for improving FM practices, there is a lack of evidence regarding the process requirements involved in their implementation. This paper aims to address this challenge, as it is the first to statistically characterise RM services and processes to identify the most critical RM problems and scenarios for digital twin implementation. The statistical data analytics approach also constitutes a novel practical approach for a holistic analysis of RM occurrences.

Design/methodology/approach

The research strategy was based on multiple case studies, which adopted university campuses as objects for investigation. A detailed literature review of work to date and documental analysis assisted in generating data on the FM sector and RM services, where qualitative and statistical analyses were applied to approximately 300,000 individual work requests.

Findings

The work provides substantial evidence of a series of patterns across both cases that were not evidenced prior to this study: a concentration of requests within main campuses; a balanced distribution of requests per building, mechanical and electrical service categories; a predominance of low priority level services; a low rate of compliance in attending priority services; a cumulative impact on the overall picture of five problem subcategories (i.e. Building-Door, Mechanical-Plumbing, Electrical-Lighting, Mechanical-Heat/Cool/Ventilation and Electrical-Power); a predominance of problems in student accommodation facilities, circulations and offices; and a concentration of requests related to unlisted buildings. These new patterns form the basis for business cases where maintenance services and FM sectors can benefit from digital twins. It also provides a new methodological approach for assessing the impact of RM on businesses.

Practical implications

The findings provide new insights for owners and FM staff in determining the criticality of RM services, justifying investments and planning the digital transformation of services for a smarter provision.

Originality/value

This study represents a unique approach to FM and provides detailed evidence to identify novel RM patterns of critical service provision and activities within organisations for efficient digitalised data management over a building’s lifecycle.

Details

Facilities, vol. 42 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 19 January 2024

Kenneth Lawani, Farhad Sadeghineko, Michael Tong and Mehmethan Bayraktar

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D…

68

Abstract

Purpose

The purpose of this study is to explore the suggestions that construction processes could be considerably improved by integrating building information modelling (BIM) with 3D laser scanning technologies. This case study integrated 3D laser point cloud scans with BIM to explore the effects of BIM adoption on ongoing construction project, whilst evaluating the utility of 3D laser scanning technology for producing structural 3D models by converting point cloud data (PCD) into BIM.

Design/methodology/approach

The primary data acquisition adopted the use of Trimble X7 laser scanning process, which is a set of data points in the scanned space that represent the scanned structure. The implementation of BIM with the 3D PCD to explore the precision and effectiveness of the construction processes as well as the as-built condition of a structure was precisely captured using the 3D laser scanning technology to recreate accurate and exact 3D models capable of being used to find and fix problems during construction.

Findings

The findings indicate that the integration of BIM and 3D laser scanning technology has the tendency to mitigate issues such as building rework, improved project completion times, reduced project cost, enhanced interdisciplinary communication, cooperation and collaboration amongst the project duty holders, which ultimately enhances the overall efficiency of the construction project.

Research limitations/implications

The acquisition of data using 3D laser scanner is usually conducted from the ground. Therefore, certain aspects of the building could potentially disturb data acquisition; for example, the gable and sections of eaves (fascia and soffit) could be left in a blind spot. Data acquisition using 3D laser scanner technology takes time, and the processing of the vast amount of data acquired is laborious, and if not carefully analysed, could result in errors in generated models. Furthermore, because this was an ongoing construction project, material stockpiling and planned construction works obstructed and delayed the seamless capture of scanned data points.

Originality/value

These findings highlight the significance of integrating BIM and 3D laser scanning technology in the construction process and emphasise the value of advanced data collection methods for effectively managing construction projects and streamlined workflows.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 29 January 2024

Klaudia Jaskula, Dimosthenis Kifokeris, Eleni Papadonikolaki and Dimitrios Rovas

Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is…

Abstract

Purpose

Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is exposing all relevant data as a single source of truth and facilitating continuous collaboration between stakeholders. A multitude of tools can be used as a CDE, however, it is not clear how the tools are used or if they fulfil the users’ needs. Therefore, this paper aims to investigate current practices of using CDEs for information management during the whole built asset’s life cycle, through a state-of-the-art literature review and an empirical study.

Design/methodology/approach

Literature data is collected according to the PRISMA 2020 guideline for reporting systematic reviews. This paper includes 46 documents in the review and conduct a bibliometric and thematic analysis to identify the main challenges of digital information management. To understand the current practice and the views of the stakeholders using CDEs in their work, this paper used an empirical approach including semi-structured interviews with 15 BIM experts.

Findings

The results indicate that one of the major challenges of CDE adoption is project complexity and using multiple CDEs simultaneously leading to data accountability, transparency and reliability issues. To tackle those challenges, the use of novel technologies in CDE development such as blockchain could be further investigated.

Originality/value

The research explores the major challenges in the practical implementation of CDEs for information management. To the best of the authors’ knowledge, this is the first study on this topic combining a systematic literature review and fieldwork.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 12 December 2023

Judith Fauth, Tanya Bloch and Lucio Soibelman

Building permitting is mostly a manual, labor intensive and time-consuming process. Initiatives for streamlining the process are not always helpful since they often fail to…

Abstract

Purpose

Building permitting is mostly a manual, labor intensive and time-consuming process. Initiatives for streamlining the process are not always helpful since they often fail to address the core problems within the process. A framework for modeling the permitting process can be useful to identify bottlenecks, core challenges and best practices. Hence, the authors aim to demonstrate and validate a previously suggested workflow for permit process modeling using the permitting process in Israel as a test case.

Design/methodology/approach

The authors implement qualitative expert interviews for data acquisition. The collected data are then processed for a qualitative data analysis. The results of the analysis are then validated using a focus group workshop in the field of building permits. In the test case the focus group consisted of Israeli experts.

Findings

The authors present a detailed overview of the as-is building permit process in Israel and the existing challenges. Through this test case, the authors found that the framework is applicable in different countries and that it can provide valuable insights into the core problems within the process. In addition, application of the same framework in different countries can provide comparable results that would allow the authors to identify best practices.

Originality/value

The major contribution of this work is the development and validation of a framework for building permitting process modeling which can be used to identify existing challenges and bottlenecks in the process. Implementing a structured and unified approach provides an opportunity to easily compare processes in different countries to identify best practices.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 7 March 2024

Mohammed Ali Abd Ali Alsemari and Manu Ramegowda

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements…

Abstract

Purpose

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements that oil and gas facilities required in such projects. Therefore, adopting an appropriate technological approach such as building information modeling (BIM) which is unfortunately not adopted yet in Iraq is essential to successfully deliver these projects. Thus, this paper aimed to introduce BIM to Iraq through Basra Oil Company (BOC) which is one of the biggest public oil and gas companies in Iraq.

Design/methodology/approach

The related literature of journals articles, conference proceedings and published reports have been reviewed. As a result, firstly: a hypothesis has been derived that is “If Basra Oil Company (BOC) adopts and applies BIM approach instead of the 2D approach currently used to manage its projects, the company can overcome several constraints in managing its projects that associated with such 2D traditional approach”; secondly: homogenous, consistence and reliable web-based questionnaire has been designed as its Cronbach’s alpha equal to 0.897 and 0.711 for BIM benefits and barriers, respectively. This questionnaire distributed to the BOC related professionals to test such hypothesis by investigating their readiness and accepting of BIM approach and to rank BIM barriers based on five-point Likert scale.

Findings

Based on the analysis using IBM SPSS Statistics 26 of 115 responses, almost 50% of the respondents had experience 11–15 years, while 22.6% had experience more than 15 years in oil and gas industry construction projects. Those participants were from diverse engineering majors that are: 4.3% Architectural Engineers, 31.3% Civil Engineers, 20% Mechanical Engineers, 22.6% Electrical Engineers and 21.7% from other engineering majors. The respondents’ departments demography was 16.5% of design department, 12.2% of construction department, 20.9% of Project Management Department, 12.2% of Maintenance department, 4.3% of HSE Department, 13% of Production Department and 20.9% of “Other Department.” The study resulted in 1: accepting BIM approach to be an alternative of current 2D-traditional approach used by the company to manage and construct its projects, since mean of collected data is (4.4332), Kruskal–Wallis H test significance values were 0.398 and 0.372; and ANOVA test significance values were 0.433 and 0.599 among Engineering Majors groups and Company’s Department groups, respectively. 2: Disclosed and sequenced BIM barriers in the company based on their criticality. 3: verifying reliably how BIM attributes are important to oil and gas construction projects in Iraq, 4: the company top management and company policies are the most critical potential factors to hinder or adopt and implement BIM in the company, 5: while cost is not seen a critical barrier to implement BIM in the oil and gas sector.

Research limitations/implications

The limitation of this study is the excluding of decision makers of BOC, thus more profound future studies need to be conducted where top management and decision makers are involved, particularly the present study demonstrated that support of company top management is the most critical factor which can help the company to adopt (BIM).

Originality/value

The study concludes that BIM approach is valuable for managing projects in oil and gas sector in Iraq and identify the originality in output by using the research method. This noble study provides a leverage for enhanced research to adopt and implement building information modeling (BIM) in Iraq as the study originally demonstrates benefits and identifies the critical barriers in BIM implementation to push the boundaries toward adopt Digitalization and reduce CO2 emission in Iraqi oil and gas sector. The study can be used as evidence and platform to encourage professionals and practitioners to present more sophisticated tools of BIM in the oil and gas industry, especially for facility and operation management. These findings achieved via oil and gas experts, and it is first time to achieve such findings from a case study in Iraqi oil and gas sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 28 February 2024

Thayla Zomer, Andy Neely and Paulo Savaget

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon…

Abstract

Purpose

How organisations interact with and respond to environmental pressures has been a long-term interest of organisational scholars. Still, it remains an under-theorised phenomenon from a project perspective. So far, there is limited understanding of how projects, which are composed by a constellation of organisations, “respond” to institutional pressures that are exerted on them. This research takes the perspective of projects as adopters/implementers of institutional pressures and analyses how they interact with, and respond to, such pressures. More specifically, this research explores how construction projects respond to the pressure of a Building Information Modelling (BIM) mandate.

Design/methodology/approach

Multiple in-depth case studies were conducted to explore the practical implementation of a BIM mandate in the UK and understand how the construction projects responded to the coercive pressures to implement a new policy mandate for process digitalisation. Multiple sources were employed for data collection and the data were analysed inductively. The findings identify a hybrid response comprising four distinct ways that projects might respond to an institutional pressure.

Findings

We find that projects decouple both from the content and from the intended purpose of a policy, i.e. there are two variance of a policy-practice decoupling phenomenon in projects. The findings also reveal the underlying conditions leading to decoupling.

Originality/value

We advance decoupling literature so that it better applies to the temporary, distributed and interdependent work conducted via projects. Second, we define decoupling in projects as a provisional and fragmented process of wayfinding through heterogeneous institutional spaces, and discuss the potential policy-practice assemblages in projects, influenced by how, if and when project members' activities decouple from the many and often contradicting institutional pressures they face. Third, we discuss how the qualitatively different forms of decoupling that we identified in our work may act as part of a legitimation process in ambiguous situations whereby projects might share a resemblance of conformity with institutional pressures when they are de facto only partially conforming to them.

Details

International Journal of Managing Projects in Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8378

Keywords